Technical assistance of PO WER to the National Centre for Research and Development 2019-2020 (Q94315)

From EU Knowledge Graph
Revision as of 16:01, 13 October 2024 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in pt)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Project Q94315 in Poland
Language Label Description Also known as
English
Technical assistance of PO WER to the National Centre for Research and Development 2019-2020
Project Q94315 in Poland

    Statements

    0 references
    8,979,446.73 zloty
    0 references
    1,996,131.01 Euro
    13 January 2020
    0 references
    10,654,303.2 zloty
    0 references
    2,368,451.6 Euro
    13 January 2020
    0 references
    84.28 percent
    0 references
    1 January 2019
    0 references
    31 December 2020
    0 references
    NARODOWE CENTRUM BADAŃ I ROZWOJU
    0 references
    0 references
    0 references

    54°24'47.23"N, 18°32'5.06"E
    0 references
    Zapewnienie efektywnego wsparcia w zakresie wdrażania III Osi Priorytetowej POWER przez IP NCBR poprzez zapewnienie odpowiedniego potencjału instytucjonalnego i technicznego, pozwalających na sprawne prowadzenie procesów zarządzania, monitorowania, ewaluacji, informacji i komunikacji, oraz kontroli i audytu w związku z wdrażaniem PO WER. Wartość wydatków kwalifikowalnych w projekcie została wyliczona w oparciu o planowane kwoty certyfikacji. (Polish)
    0 references
    Ensure effective support for the implementation of POWER Priority Axis III by the IP of the NCBR by providing adequate institutional and technical capacity to ensure efficient management, monitoring, evaluation, information and communication processes, as well as control and audit in connection with the implementation of the WER OP. The value of eligible expenditure in the project has been calculated on the basis of the planned amounts of certification. (English)
    15 October 2020
    0.0211273652711631
    0 references
    Fournir un soutien efficace à la mise en œuvre de l’axe prioritaire POWER III par le PB NCBR en fournissant les capacités institutionnelles et techniques adéquates pour mener efficacement les processus de gestion, de suivi, d’évaluation, d’information et de communication, ainsi que le contrôle et l’audit dans le cadre de la mise en œuvre du PO KED. La valeur des dépenses éligibles du projet a été calculée sur la base des montants prévus pour la certification. (French)
    30 November 2021
    0 references
    Wirksame Unterstützung bei der Umsetzung der POWER-Prioritätsachse III durch die IBZB durch die Bereitstellung angemessener institutioneller und technischer Kapazitäten zur effizienten Durchführung von Verwaltungs-, Überwachungs-, Bewertungs-, Informations- und Kommunikationsprozessen sowie Kontrolle und Audit im Zusammenhang mit der Durchführung des OP KED. Der Wert der förderfähigen Ausgaben im Projekt wurde auf der Grundlage der geplanten Bescheinigungsbeträge berechnet. (German)
    7 December 2021
    0 references
    Effectieve ondersteuning bieden voor de tenuitvoerlegging van POWER-prioriteit as III door de NCBR van het IB door voldoende institutionele en technische capaciteit te bieden om beheers-, monitoring-, evaluatie-, informatie- en communicatieprocessen efficiënt uit te voeren, alsmede controle en audit in verband met de uitvoering van het OP KED. De waarde van de subsidiabele uitgaven in het project werd berekend op basis van de geplande certificeringsbedragen. (Dutch)
    16 December 2021
    0 references
    Fornire un sostegno efficace per l'attuazione dell'asse prioritario POWER III da parte della BCNBR fornendo un'adeguata capacità istituzionale e tecnica per condurre in modo efficiente i processi di gestione, monitoraggio, valutazione, informazione e comunicazione, nonché il controllo e l'audit in relazione all'attuazione del PO KED. Il valore delle spese ammissibili nel progetto è stato calcolato sulla base degli importi previsti per la certificazione. (Italian)
    16 January 2022
    0 references
    Prestar un apoyo eficaz a la aplicación del eje prioritario de POWER III por parte del BID NCBR proporcionando una capacidad institucional y técnica adecuada para llevar a cabo de manera eficiente los procesos de gestión, seguimiento, evaluación, información y comunicación, así como el control y la auditoría en relación con la aplicación del PO KED. El valor de los gastos subvencionables del proyecto se calculó sobre la base de los importes de certificación previstos. (Spanish)
    19 January 2022
    0 references
    Yde effektiv støtte til IB NCBR's gennemførelse af POWER-prioritetsakse III ved at tilvejebringe tilstrækkelig institutionel og teknisk kapacitet til effektivt at gennemføre forvaltnings-, overvågnings-, evaluerings-, informations- og kommunikationsprocesser samt kontrol og revision i forbindelse med gennemførelsen af OP KED. Værdien af de støtteberettigede udgifter i projektet blev beregnet på grundlag af de planlagte attesteringsbeløb. (Danish)
    26 July 2022
    0 references
    Να παρέχει αποτελεσματική στήριξη για την εφαρμογή του άξονα προτεραιότητας ΙΙΙ της ΔΥ από τον ΕΦΕ, παρέχοντας επαρκή θεσμική και τεχνική ικανότητα για την αποτελεσματική διεξαγωγή διαδικασιών διαχείρισης, παρακολούθησης, αξιολόγησης, πληροφόρησης και επικοινωνίας, καθώς και ελέγχου και λογιστικού ελέγχου σε σχέση με την εφαρμογή του ΕΠ KED. Η αξία των επιλέξιμων δαπανών στο έργο υπολογίστηκε με βάση τα προβλεπόμενα ποσά πιστοποίησης. (Greek)
    26 July 2022
    0 references
    Osigurati učinkovitu potporu provedbi prioritetne osi POWER-a od strane NSB-a IB-a pružanjem odgovarajućih institucionalnih i tehničkih kapaciteta za učinkovito provođenje upravljanja, praćenja, evaluacije, informacijskih i komunikacijskih procesa, kao i kontrole i revizije u vezi s provedbom OP KED-a. Vrijednost prihvatljivih izdataka u projektu izračunana je na temelju planiranih iznosa potvrđivanja. (Croatian)
    26 July 2022
    0 references
    Furnizarea unui sprijin eficace pentru punerea în aplicare a axei prioritare III POWER de către BCN a OI prin asigurarea unei capacități instituționale și tehnice adecvate pentru desfășurarea eficientă a proceselor de management, monitorizare, evaluare, informare și comunicare, precum și control și audit în legătură cu punerea în aplicare a PO-KED. Valoarea cheltuielilor eligibile în cadrul proiectului a fost calculată pe baza sumelor de certificare planificate. (Romanian)
    26 July 2022
    0 references
    Poskytovať účinnú podporu implementácie prioritnej osi III POWER zo strany IB NCBR poskytovaním primeraných inštitucionálnych a technických kapacít na efektívne vykonávanie riadiacich, monitorovacích, hodnotiacich, informačných a komunikačných procesov, ako aj kontroly a auditu v súvislosti s vykonávaním OP KED. Hodnota oprávnených výdavkov v projekte bola vypočítaná na základe plánovaných súm certifikácie. (Slovak)
    26 July 2022
    0 references
    Jipprovdi appoġġ effettiv għall-implimentazzjoni tal-Assi Prijoritarju III POWER mill-IB NCBR billi jipprovdi kapaċità istituzzjonali u teknika adegwata biex iwettaq b’mod effiċjenti l-ġestjoni, il-monitoraġġ, l-evalwazzjoni, l-informazzjoni u l-proċessi ta’ komunikazzjoni, kif ukoll il-kontroll u l-awditjar b’rabta mal-implimentazzjoni tal-OP KED. Il-valur tan-nefqa eliġibbli fil-proġett ġie kkalkulat fuq il-bażi tal-ammonti ppjanati ta’ ċertifikazzjoni. (Maltese)
    26 July 2022
    0 references
    Assegurar um apoio eficaz à execução do Eixo Prioritário POWER III pelo PI do NCBR, proporcionando uma capacidade institucional e técnica adequada para assegurar processos eficientes de gestão, acompanhamento, avaliação, informação e comunicação, bem como de controlo e auditoria relacionados com a execução do PO WER. O valor das despesas elegíveis do projeto foi calculado com base nos montantes de certificação previstos. (Portuguese)
    26 July 2022
    0 references
    Antaa tehokasta tukea POWERin toimintalinjan III täytäntöönpanolle IB NCBR:n avulla tarjoamalla riittävät institutionaaliset ja tekniset valmiudet hallinnoida tehokkaasti hallinto-, seuranta-, arviointi-, tiedotus- ja viestintäprosesseja sekä valvoa ja tarkastaa toimenpideohjelman KED-asiakirjan täytäntöönpanon yhteydessä. Hankkeen tukikelpoisten menojen arvo laskettiin suunniteltujen varmennusmäärien perusteella. (Finnish)
    26 July 2022
    0 references
    Zagotavlja učinkovito podporo izvajanju prednostne osi III POWER s strani NCBR PT z zagotavljanjem ustrezne institucionalne in tehnične zmogljivosti za učinkovito izvajanje postopkov upravljanja, spremljanja, vrednotenja, informiranja in komuniciranja ter kontrole in revizije v zvezi z izvajanjem OP KED. Vrednost upravičenih izdatkov v projektu je bila izračunana na podlagi načrtovanih zneskov certifikacije. (Slovenian)
    26 July 2022
    0 references
    Poskytovat účinnou podporu provádění prioritní osy III POWER národní centrální bankou IB tím, že poskytne odpovídající institucionální a technickou kapacitu pro účinné řízení, monitorování, hodnocení, informační a komunikační procesy, jakož i kontrolu a audit v souvislosti s prováděním OP KED. Hodnota způsobilých výdajů v rámci projektu byla vypočtena na základě plánovaných částek certifikace. (Czech)
    26 July 2022
    0 references
    Teikti veiksmingą paramą IB NCBR įgyvendinant POWER III prioritetinę kryptį, suteikiant tinkamus institucinius ir techninius pajėgumus, kad būtų galima veiksmingai vykdyti valdymo, stebėsenos, vertinimo, informavimo ir komunikacijos procesus, taip pat kontrolę ir auditą, susijusius su VP KED įgyvendinimu. Projekto reikalavimus atitinkančių išlaidų vertė buvo apskaičiuota pagal planuojamas sertifikavimo sumas. (Lithuanian)
    26 July 2022
    0 references
    Nodrošināt efektīvu atbalstu POWER prioritārā virziena III īstenošanai, ko veic IB NCBR, nodrošinot atbilstošas institucionālās un tehniskās spējas, lai efektīvi veiktu vadības, uzraudzības, novērtēšanas, informācijas un komunikācijas procesus, kā arī kontroli un revīziju saistībā ar DP KED īstenošanu. Attaisnoto izdevumu vērtība projektā tika aprēķināta, pamatojoties uz plānotajām sertifikācijas summām. (Latvian)
    26 July 2022
    0 references
    Осигуряване на ефективна подкрепа за изпълнението на приоритетна ос III на МББ чрез осигуряване на подходящ институционален и технически капацитет за ефективно провеждане на процесите на управление, мониторинг, оценка, информация и комуникация, както и контрол и одит във връзка с изпълнението на ОП КЕД. Стойността на допустимите разходи по проекта е изчислена въз основа на планираните суми за сертифициране. (Bulgarian)
    26 July 2022
    0 references
    Hatékony támogatást nyújt a III. POWER prioritási tengely IB NKBR általi végrehajtásához azáltal, hogy megfelelő intézményi és technikai kapacitást biztosít az irányítási, nyomonkövetési, értékelési, tájékoztatási és kommunikációs folyamatok hatékony lefolytatásához, valamint a KED OP végrehajtásával kapcsolatos ellenőrzéshez és audithoz. A projekt támogatható kiadásainak értékét a tanúsítás tervezett összegei alapján számították ki. (Hungarian)
    26 July 2022
    0 references
    Tacaíocht éifeachtach a chur ar fáil chun Ais Tosaíochta POWER III a chur chun feidhme ag IB NCBR trí chumas leordhóthanach institiúideach agus teicniúil a sholáthar chun próisis bhainistíochta, faireacháin, mheastóireachta, faisnéise agus chumarsáide a dhéanamh go héifeachtúil, chomh maith le rialú agus iniúchadh i dtaca le cur chun feidhme OP KED. Ríomhadh luach an chaiteachais incháilithe sa tionscadal ar bhonn na méideanna deimhniúcháin atá beartaithe. (Irish)
    26 July 2022
    0 references
    Tillhandahålla effektivt stöd för genomförandet av POWER-prioriteringsområde III av IB NCBR genom att tillhandahålla tillräcklig institutionell och teknisk kapacitet för att effektivt genomföra förvaltning, övervakning, utvärdering, information och kommunikation samt kontroll och revision i samband med genomförandet av det operativa programmet KED. Värdet av de stödberättigande utgifterna i projektet beräknades på grundval av de planerade attesteringsbeloppen. (Swedish)
    26 July 2022
    0 references
    Pakkuda tõhusat tuge POWER III prioriteetse suuna rakendamiseks IB NCBRi poolt, pakkudes piisavat institutsioonilist ja tehnilist suutlikkust tõhusa juhtimise, järelevalve, hindamise, teabe- ja kommunikatsiooniprotsesside ning kontrolli ja auditi teostamiseks seoses KEDi rakendamisega. Projekti abikõlblike kulude väärtus arvutati kavandatud sertifitseerimissummade alusel. (Estonian)
    26 July 2022
    0 references
    Cały Kraj
    0 references
    13 December 2023
    0 references

    Identifiers

    POWR.06.01.00-00-0801/18
    0 references