NETWORK ROOMS (Q1865007)

From EU Knowledge Graph
Revision as of 09:24, 15 July 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Italy financed by DG Regio
Language Label Description Also known as
English
NETWORK ROOMS
Project in Italy financed by DG Regio

    Statements

    0 references
    15,000.0 Euro
    0 references
    15,000.0 Euro
    0 references
    100.0 percent
    0 references
    8 February 2016
    0 references
    22 December 2016
    0 references
    22 December 2016
    0 references
    S.M. F. SOLIMENA
    0 references

    40°54'51.12"N, 14°47'19.97"E
    0 references
    IL PROGETTO FINALIZZATO ALLAMPLIAMENTO PER UNA COPERTURA TOTALE DELLINTERO ISTITUTO TRAMITE UNA RETE WIRELESS FUNZIONANTELE FASI PREVISTE SONOOSTESURA DELLA DORSALE IN FIBRA OTTICA E INSTALLAZIONE EO SISTEMAZIONE DELLARMADIO DI EDIFICIO CENTRO STELLA E DI PIANO OCABLAGGIO PER LA REALIZZAZIONE DEI PUNTI LAN RICHIESTI NELLA PARTE ECONOMICA OINSTALLAZIONE DEGLI APPARATI ATTIVI E DEGLI ACCESSORI OREALIZZAZIONE DELLA COPERTURA WIRELESS OCOLLAUDO E VERIFICA DELLA FUNZIONALITIL CONTROLLO DEI LAVORI SAR SVOLTO DA UNA COMMISSIONE FORMATA DA TECNICI EO PROFESSORI DIPENDENTI DELLA SCUOLA CHE DOVRANNO ATTESTARE IL REGOLARE FUNZIONAMENTO E PARTECIPARE ALLE MISURE SUI DATI CARATTERIZZANTII PARAMETRI CHE SARANNO VERIFICATI SONOEFFETTIVO USO DELLA STRUTTURA TEMPO E FLUSSO DEI DATI RILEVABILI DA SERVER INCIDENZA NELLA DIDATTICA TEMPI E MODALIT DUSO RILEVATI DALLE RELAZIONI DEGLI INSEGNANTI LIMPEGNO QUELLO DI RIUTILIZZARE TUTTE LE ATTREZZATURE PREESISTENTI SENZA ALCUNO SPRECO (Italian)
    0 references
    THE PROJECT FOR A FULL COVERAGE OF THE WHOLE INSTITUTION THROUGH A WIRELESS NETWORK OF FULL-FIBRE OPTIC BACKBONE NETWORK AND INSTALLATION OF THE EO BUILDING OF THE CENTRE STAR AND THE OCABLLANGGIO BUILDING INSTALLATION FOR THE BUILDING OF THE OINSTLARATION OF THE ACTIVE EQUIPMENT AND ACCESSORIES IN THE MONITORING OF THE EWS WORK CARRIED OUT BY A COMMISSION TRAINED BY THE STAFF OF THE SCHOOL STAFF OF THE SCHOOL WHO WILL HAVE TO CERTIFY THE REGULAR USE OF THE TIME FRAME AND TO TAKE PART IN THE DATA FLOW THAT CAN BE DETECTED BY TEACHERS’ REPORTS IN THE TEACHING OF ALL THE PRE-EXISTING EQUIPMENT WITHOUT WASTE (English)
    0 references

    Identifiers