Construction and modernisation of the power grid with voltage SN and nn enabling connection of electricity generation units from RES in the commune Legnica, Legnickie Pole and Prochowice. (Q95407)

From EU Knowledge Graph
Revision as of 06:43, 13 October 2024 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in pt)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Project Q95407 in Poland
Language Label Description Also known as
English
Construction and modernisation of the power grid with voltage SN and nn enabling connection of electricity generation units from RES in the commune Legnica, Legnickie Pole and Prochowice.
Project Q95407 in Poland

    Statements

    0 references
    2,073,850.09 zloty
    0 references
    461,016.88 Euro
    13 January 2020
    0 references
    2,503,138.31 zloty
    0 references
    556,447.65 Euro
    13 January 2020
    0 references
    82.85 percent
    0 references
    9 June 2016
    0 references
    31 December 2018
    0 references
    TAURON DYSTRYBUCJA S.A.
    0 references
    0 references

    51°12'17.17"N, 16°10'28.85"E
    0 references

    51°14'28.64"N, 16°20'37.28"E
    0 references
    ramach projektu „Budowa i modernizacja sieci elektroenergetycznej o napięciu SN i nN umożliwiająca przyłączanie jednostek wytwarzania energii elektrycznej z OZE na terenie gminy Legnica, Legnickie Pole i Prochowice” planowane są do realizacji roboty budowlane obejmujące 6 zadań:Zadanie 1 - Budowa sieci SN w miejscowości Legnica - LGS Przybków - R275-2-Lotnisko W ramach Zadania 1 powstanie: 4,74 km nowo wybudowanej sieci elektroenergetycznej średniego napięcia dla OZE Zadanie 2 - Modernizacja linii kablowej SN L-265 w miejscowości Legnica - L-265. W ramach Zadania 2 powstanie: 1,1 km zmodernizowanej sieci elektroenergetycznej średniego napięcia dla OZE Zadanie 3 - Budową i modernizacją sieci SN w miejscowości Strachowice - L-263. W ramach zadania wybudowana zostanie linia napowietrzna SN 3xBLL- T- 70mm2, linia kablowa SN 3xXRUHAKXS1x120/25mm2 oraz linia napowietrzna SN GREENPAS 70mm2. Zmodernizowana będzie również słupowa stacja transformatorowa 20/0,4kV R-263-42. Demontażowi ulegnie linia napowietrzna SN AFL-6 3x35mm2, cechująca się mniejszym przekrojem przewodów.W ramach Zadania 3 powstanie: 2,43 km zmodernizowanej sieci elektroenergetycznej średniego napięcia dla OZEZadanie 4 - Modernizacja sieci SN w miejscowości Prochowice - L-262. Zmodernizowana zostanie linia kablowa SN na typu 3xXRUHAKXS 1x120/25 mm2.W ramach Zadania 4 powstanie:0,59 km zmodernizowanej sieci elektroenergetycznej średniego napięcia dla OZE. Zadanie 5 - Budowa i modernizacja sieci SN w gminie Prochowice - L-261. Zmodernizowana i wybudowana zostanie linia kablowa SN na typu 3xXRUHAKXS 1x120/25 mm2.W ramach Zadania 5 powstanie:0,78 km nowo wybudowanej sieci elektroenergetycznej średniego napięcia dla OZE, 1,06 km zmodernizowanej sieci elektroenergetycznej średniego napięcia dla OZE. Zadanie 6. Modernizacja sieci SN i nN w miejscowości Kwiatkowice - L-268 wraz z budową stacji transformatorowej 20/0,4kV W ramach Zadania 6 powstanie:0,69 km zmodernizowanej sieci elektroenergetycznej średniego napię (Polish)
    0 references
    as part of the project “Construction and modernisation of electricity grid with voltage of SN and nN, enabling connection of electricity generation units from RES in the commune Legnica, Legnickie Pole i Prochowice” are planned to carry out construction works covering 6 tasks:Task 1 – Construction of the SN network in Legnica – LGS Przybków – R275-2-Airport As part of Task 1, there will be: 4.74 km of newly built medium voltage power grid for RES Task 2 – Modernisation of cable line SN L-265 in Legnica – L-265. As part of Task 2, the following will be created: 1.1 km of modernised medium voltage power grid for RES Task 3 – Construction and modernisation of the SN network in Strachowice – L-263. The task will include an overhead line SN 3xBLL-T-70 mm², cable line SN 3xXRUHAKXS1x120/25 mm² and overhead line SN GREENPAS 70 mm². The 20/0.4 kV R-263-42 pole transformer station will also be modernised. The overhead line SN AFL-6 3x35 mm² will be dismantled, characterised by a smaller section of the cables. 2.43 km of modernised medium voltage power grid for RESTask 4 – Modernisation of the SN network in Prochowice – L-262. The cable line SN on type 3xXRUHAKXS 1x120/25 mm² will be modernised.As part of Task 4, there will be:0,59 km of modernised medium voltage power grid for RES. Task 5 – Construction and modernisation of the SN network in the commune of Prochowice – L-261. The SN cable line on type 3xXRUHAKXS 1x120/25 mm² will be modernised and built.As part of Task 5, there will be:0,78 km of newly built medium voltage electricity grid for RES, 1.06 km of modernised medium voltage electricity grid for RES. Task 6. Modernisation of the SN and nN network in Kwiatkowice – L-268 together with the construction of a 20/0.4 kV transformer station In the frame of Task 6, there will be: 0,69 km of modernised medium voltage power grid (English)
    15 October 2020
    0.5616571713013416
    0 references
    dans le cadre du projet «Construction et modernisation du réseau électrique avec une tension de SN et de nN permettant le raccordement d’unités de production d’électricité à partir de sources d’énergie renouvelables dans la municipalité de Legnica, Legnickie Pole et Prochowice» sont prévues pour des travaux de construction couvrant 6 tâches: Tâche 1 — Construction du réseau SN à Legnica — LGS Przybków — R275-2-Airport Dans le cadre de la tâche 1, les éléments suivants seront créés: 4,74 km de réseau électrique à moyenne tension nouvellement construit pour RES Task 2 — Modernisation de la ligne de câble SN L-265 dans la ville de Legnica — L-265. Dans le cadre de la tâche 2, il y aura: 1,1 km de réseau électrique modernisé à moyenne tension pour la tâche 3 SER — Construction et modernisation du réseau SN à Strachowice — L-263. Dans le cadre de cette tâche, la ligne aérienne SN 3xBLL- T- 70 mm², la ligne de câble SN 3xRUHAKXS1x120/25 mm² et la ligne aérienne SN GREENPAS 70 mm² seront construites. La station de transformateur à poteaux 20/0,4 kV R-263-42 sera également modernisée. La ligne aérienne SN AFL-6 3x35 mm², avec une section transversale plus petite, sera démontée. 2,43 km de réseau électrique modernisé à moyenne tension pour RESTask 4 — Modernisation du réseau SN à Prochowice — L-262. La ligne de câble SN du type 3xXRUHAKXS 1x120/25 mm² sera modernisée. Tâche 5 — Construction et modernisation du réseau SN dans la municipalité de Prochowice — L-261. La ligne de câble SN sera modernisée et construite sur le type 3xXRUHAKXS 1x120/25 mm². Tâche 6. Modernisation des réseaux SN et nN à Kwiatkowice — L-268 avec la construction d’une station de transformation 20/0,4 kV (French)
    1 December 2021
    0 references
    im Rahmen des Projekts „Bau und Modernisierung des Stromnetzes mit einer Spannung von SN und nN zur Anbindung von Stromerzeugungseinheiten aus erneuerbaren Energiequellen in der Gemeinde Legnica, Legnickie Pole und Prochowice“ sind für Bauarbeiten mit 6 Aufgaben geplant: Aufgabe 1 – Bau des SN-Netzes in Legnica – LGS Przybków – R275-2-Flughafen Im Rahmen von Aufgabe 1 wird Folgendes geschaffen: 4,74 km neu gebautes Mittelspannungsnetz für RES Aufgabe 2 – Modernisierung der Kabelleitung SN L-265 in der Stadt Legnica – L-265. Im Rahmen von Task 2 wird es Folgendes geben: 1,1 km modernisiertes Mittelspannungsnetz für RES Task 3 – Bau und Modernisierung des SN-Netzes in Strachowice – L-263. Im Rahmen der Aufgabe werden die Oberleitung SN 3xBLL-T- 70 mm², die Kabelleitung SN 3xRUHAKXS1x120/25 mm² und die Oberleitung SN GREENPAS 70 mm² gebaut. Die 20/0,4 kV R-263-42 Pol-Transformatorstation wird ebenfalls modernisiert. Die Oberleitung SN AFL-6 3x35 mm², mit einem kleineren Drahtquerschnitt, wird abgebaut. 2,43 km modernisiertes Mittelspannungsnetz für RESTask 4 – Modernisierung des SN-Netzes in Prochowice – L-262. Die SN-Kabelleitung am Typ 3xXRUHAKXS 1x120/25 mm² wird modernisiert.Im Rahmen von Aufgabe 4 powstanie:0,59 km modernisiertes Mittelspannungsnetz für erneuerbare Energien. Aufgabe 5 – Bau und Modernisierung des SN-Netzes in der Gemeinde Prochowice – L-261. Die SN-Kabelleitung wird modernisiert und auf Typ 3xXRUHAKXS 1x120/25 mm² gebaut.Als Teil der Aufgabe 5 powstanie:0,78 km neu gebautes Mittelspannungsnetz für erneuerbare Energien, 1,06 km modernisiertes Mittelspannungsnetz für erneuerbare Energien. Aufgabe 6. Modernisierung der SN- und nN-Netze in Kwiatkowice – L-268 mit dem Bau eines 20/0,4 kV-Transformators (German)
    7 December 2021
    0 references
    als onderdeel van het project „Bouw en modernisering van het elektriciteitsnet met een spanning van SN en nN die de aansluiting van elektriciteitsproductie-eenheden uit hernieuwbare energiebronnen in de gemeente Legnica, Legnickie Pole en Prochowice mogelijk maken” zijn gepland voor bouwwerkzaamheden die 6 taken omvatten: taak 1 — Bouw van het SN-netwerk in Legnica — LGS Przybków — R275-2-Airport Als onderdeel van taak 1 wordt het volgende gecreëerd: 4,74 km nieuw gebouwd middenspanningsnet voor RES Task 2 — Modernisering van de kabellijn SN L-265 in de stad Legnica — L-265. Als onderdeel van taak 2 is er: 1,1 km gemoderniseerd middenspanningsnet voor RES Task 3 — Bouw en modernisering van het SN-netwerk in Strachowice — L-263. Als onderdeel van de taak zullen de bovenleiding SN 3xBLL- T- 70 mm², kabellijn SN 3xRUHAKXS1x120/25 mm² en bovenleiding SN GREENPAS 70 mm² worden gebouwd. De 20/0,4 kV R-263-42 pole transformator station zal ook worden gemoderniseerd. De bovenleiding SN AFL-6 3x35 mm², met een kleinere draaddoorsnede, wordt ontmanteld. 2,43 km gemoderniseerd middenspanningsnet voor RESTask 4 — Modernisering van het SN-netwerk in Prochowice — L-262. De SN-kabellijn op type 3xXRUHAKXS 1x120/25 mm² wordt gemoderniseerd. Taak 5 — Bouw en modernisering van het SN-netwerk in de gemeente Prochowice — L-261. De SN-kabellijn wordt gemoderniseerd en gebouwd op type 3xXRUHAKXS 1x120/25 mm².Als onderdeel van taak 5 powstanie:0,78 km nieuw gebouwd middenspanningsnet voor RES, 1,06 km gemoderniseerd middenspanningsnet voor RES. Taak 6. Modernisering van de SN- en nN-netwerken in Kwiatkowice — L-268 met de bouw van een 20/0,4kV transformatorstation (Dutch)
    16 December 2021
    0 references
    Nell'ambito del progetto "Costruzione e ammodernamento della rete elettrica con tensione di SN e nN che consente il collegamento di unità di generazione di energia elettrica da fonti rinnovabili nel comune di Legnica, Legnickie Pole e Prochowice" sono previsti lavori di costruzione che coprono 6 compiti: Task 1 — Costruzione della rete SN a Legnica — LGS Przybków — R275-2-Airport Nell'ambito del task 1, saranno creati i seguenti progetti: 4,74 km di rete elettrica a media tensione di nuova costruzione per RES Task 2 — Modernizzazione della linea di cavi SN L-265 nella città di Legnica — L-265. Nell'ambito del task 2, ci saranno: 1,1 km di rete elettrica modernizzata a media tensione per RES Task 3 — Costruzione e ammodernamento della rete SN a Strachowice — L-263. Come parte del compito, la linea aerea SN 3xBLL- T- 70 mm², cavo SN 3xRUHAKXS1x120/25 mm² e linea aerea SN GREENPAS 70 mm² saranno costruiti. Anche la stazione del trasformatore a palo da 20/0,4 kV R-263-42 sarà modernizzata. La linea aerea SN AFL-6 3x35 mm², con una sezione trasversale più piccola, sarà smontata. 2,43 km di rete elettrica modernizzata a media tensione per RESTask 4 — Modernizzazione della rete SN in Prochowice — L-262. La linea del cavo SN sul tipo 3xXRUHAKXS 1x120/25 mm² sarà modernizzata. Compito 5 — Costruzione e ammodernamento della rete SN nel comune di Prochowice — L-261. La linea di cavi SN sarà modernizzata e costruita sul tipo 3xXRUHAKXS 1x120/25 mm². Nell'ambito del Task 5 powstanie:0,78 km di rete elettrica a media tensione di nuova costruzione per RES, 1,06 km di rete elettrica a media tensione modernizzata per RES. Attività 6. Ammodernamento delle reti SN e nN a Kwiatkowice — L-268 con la costruzione di una stazione di trasformazione 20/0,4 kV (Italian)
    16 January 2022
    0 references
    como parte del proyecto «Construcción y modernización de la red eléctrica con una tensión de SN y nN que permite la conexión de unidades de generación de electricidad a partir de fuentes de energía renovables en el municipio de Legnica, Legnickie Pole y Prochowice» están previstas las obras de construcción que abarcan 6 tareas: Tarea 1 — Construcción de la red SN en Legnica — LGS Przybków — R275-2-Aeropuerto Como parte de la tarea 1, se creará lo siguiente: 4,74 km de red eléctrica de media tensión recién construida para RES Task 2 — Modernización de la línea de cable SN L-265 en la ciudad de Legnica — L-265. Como parte de la Tarea 2, habrá: 1,1 km de red eléctrica de media tensión modernizada para RES Task 3 — Construcción y modernización de la red SN en Strachowice — L-263. Como parte de la tarea, se construirá la línea aérea SN 3xBLL- T- 70 mm², la línea de cable SN 3xRUHAKXS1x120/25 mm² y la línea aérea SN GREENPAS 70 mm². La estación de transformadores de polos 20/0,4 kV R-263-42 también se modernizará. La línea aérea SN AFL-6 3x35 mm², con una sección transversal de alambre más pequeña, será desmantelada. 2,43 km de red eléctrica de media tensión modernizada para RESTask 4 — Modernización de la red SN en Prochowice — L-262. La línea de cable SN en el tipo 3xXRUHAKXS 1x120/25 mm² se modernizará.Como parte de la Tarea 4 powstanie:0,59 km de red eléctrica de media tensión modernizada para RES. Tarea 5 — Construcción y modernización de la red SN en el municipio de Prochowice — L-261. La línea de cable SN se modernizará y construirá en el tipo 3xXRUHAKXS 1x120/25 mm².Como parte de la Tarea 5 powstanie:0,78 km de red eléctrica de media tensión de nueva construcción para RES, 1,06 km de red eléctrica de media tensión modernizada para RES. Tarea 6. Modernización de las redes SN y nN en Kwiatkowice — L-268 con la construcción de una estación transformadora 20/0,4 kV (Spanish)
    19 January 2022
    0 references
    projekti „SN ja nN pingega elektrivõrgu ehitamine ja moderniseerimine, mis võimaldab ühendada taastuvatest energiaallikatest elektritootmisüksusi Legnica, Legnickie Pole’i ja Prochowice omavalitsusüksuses“ raames on kavandatud 6 ülesannet: 1. ülesanne – SN-võrgu ehitamine Legnicas – LGS Przybków – R275–2-lennujaam. 1. ülesande raames luuakse järgmine: 4,74 km äsja ehitatud keskpinge elektrivõrku RES Task 2 – moderniseerimine kaabelliini SN L-265 linnas Legnica – L-265. Ülesande nr 2 raames on: 1,1 km ajakohastatud keskpingevõrku taastuvenergia 3. ülesande jaoks – Strachowice võrgu ehitamine ja moderniseerimine – L-263. Ülesande raames ehitatakse õhuliin SN 3xBLL- T- 70 mm², kaabelliin SN 3xRUHAKXS1x120/25 mm² ja õhuliin SN GREENPAS 70 mm². Samuti uuendatakse 20/0,4 kV R-263–42 trafojaama. Väiksema traadi ristlõikega õhuliin SN AFL-6 3x35 mm² demonteeritakse. 2,43 km moderniseeritud keskpinge elektrivõrku RESTask 4 – SN-võrgu moderniseerimine Prochowice’is – L-262. SN kaabelliini tüüp 3xXRUHAKXS 1x120/25 mm² uuendatakse.Seoses ülesande 4 powstanie:0,59 km moderniseeritud keskpinge elektrivõrgu RES. Ülesanne 5 – SN-võrgu ehitamine ja moderniseerimine Prochowice omavalitsusüksuses – L-261. SN kaabelliini uuendatakse ja ehitatakse tüüp 3xXRUHAKXS 1x120/25 mm².Ühe osana ülesandest 5 powstanie:0,78 km äsja ehitatud keskpinge elektrivõrku RES, 1,06 km moderniseeritud keskpinge elektrivõrgu RES. 6. ülesanne. SN- ja nN-võrkude moderniseerimine Kwiatkowices – L-268 koos 20/0,4 kV trafojaama ehitamisega (Estonian)
    13 August 2022
    0 references
    vykdant projektą „SN ir nN įtampos elektros tinklo statyba ir modernizavimas, suteikiantis galimybę prijungti elektros energijos gamybos įrenginius iš atsinaujinančių energijos šaltinių Legnicos, Legnickie Pole ir Prochowice savivaldybėje“, planuojami statybos darbai, apimantys 6 užduotis: 1 užduotis – SN tinklo statyba Legnica-LGS Przybków – R275–2-Airport. 4,74 km naujai nutiesto vidutinės įtampos elektros tinklo, skirto RES 2 užduočiai – Kabelinės linijos SN L-265 modernizavimas Legnica mieste – L-265. Vykdant 2 užduotį, bus: 1,1 km modernizuoto vidutinės įtampos tinklo, skirto 3 AEI užduočiai – SN tinklo statybai ir modernizavimui Strachowice – L-263. Vykdant užduotį bus pastatyta oro linija SN 3xBLL- T- 70 mm², kabelinė linija SN 3xRUHAKXS1x120/25 mm² ir orinė linija SN GREENPAS 70 mm². Taip pat bus modernizuota 20/0,4 kV R-263–42 polių transformatorių stotis. Orinė linija SN AFL-6 3x35 mm², su mažesniu vielos skerspjūviu, bus išmontuota. 2,43 km modernizuoto vidutinės įtampos tinklo RESTask 4 – SN tinklo modernizavimas Prochowice – L-262. 3xXRUHAKXS 1x120/25 mm² tipo SN kabelinė linija bus modernizuota.Kaip 4 užduoties dalis: 3xXRUHAKXS 3xXRUHAKXS 1x120/25 mm². 5 užduotis. SN tinklo statyba ir modernizavimas Prochowice savivaldybėje – L-261. SN kabelio linija bus modernizuota ir pastatyta ant tipo 3xXRUHAKXS 1x120/25 mm².Kaip dalis 5 užduoties: 5 užduoties dalis: 5 užduoties km naujai pastatytas vidutinės įtampos elektros tinklas AEI, 1,06 km modernizuoto vidutinės įtampos elektros tinklo AEI. Užduotis 6. SN ir nN tinklų modernizavimas Kwiatkowice – L-268 su 20/0,4 kV transformatorių stoties statyba (Lithuanian)
    13 August 2022
    0 references
    u sklopu projekta „Izgradnja i osuvremenjivanje elektroenergetske mreže naponom SN i nN koji omogućuje spajanje jedinica za proizvodnju električne energije iz obnovljivih izvora energije u općini Legnica, Legnickie Pole i Prochowice” za građevinske radove koji pokrivaju 6 zadataka: Zadatak 1 – Izgradnja SN mreže u Legnici – LGS Przybków – R275 – 2-Zračna luka U sklopu zadatka 1, izradit će se sljedeće: 4,74 km novoizgrađene srednjenaponske elektroenergetske mreže za RES Task 2 – Modernizacija kabelske linije SN L-265 u gradu Legnici – L-265. U okviru 2. zadatka bit će: 1,1 km modernizirane srednjenaponske elektroenergetske mreže za RES Task 3 – Izgradnja i modernizacija SN mreže u Strachowiceu – L-263. Kao dio zadatka bit će izgrađena nadzemna linija SN 3xBLL- T- 70 mm², kabelska linija SN 3xRUHAKXS1x120/25 mm² i nadzemna linija SN GREENPAS 70 mm². Modernizirat će se i 20/0,4 kV R-263 – 42 pole transformatorska stanica. Nadzemna linija SN AFL-6 3x35 mm², s manjim poprečnim presjekom žice, rastavit će se. 2,43 km modernizirane srednjenaponske elektroenergetske mreže za RESTask 4 – Modernizacija SN mreže u Prochowiceu – L-262. SN kabelska linija na tipu 3xXRUHAKXS 1x120/25 mm² bit će modernizirana. Zadatak 5 – Izgradnja i modernizacija mreže SN u općini Prochowice – L-261. SN kabelska linija bit će modernizirana i izgrađena na tipu 3xXRUHAKXS 1x120/25 mm².Kao dio zadatka 5 powstanie:0,78 km novoizgrađene srednjenaponske elektroenergetske mreže za OIE, 1,06 km modernizirane srednjenaponske elektroenergetske mreže za OIE. Zadatak 6. Modernizacija SN i nN mreža u Kwiatkowiceu – L-268 izgradnjom transformatorske stanice 20/0,4 kV (Croatian)
    13 August 2022
    0 references
    στο πλαίσιο του έργου «Κατασκευή και εκσυγχρονισμός του δικτύου ηλεκτρικής ενέργειας με τάση SN και nN που επιτρέπει τη σύνδεση μονάδων παραγωγής ηλεκτρικής ενέργειας από ανανεώσιμες πηγές στον δήμο Legnica, Legnickie Pole και Prochowice» προγραμματίζονται κατασκευαστικές εργασίες που καλύπτουν 6 εργασίες: Task 1 — Κατασκευή του δικτύου SN στη Legnica — LGS Przybków — R275-2-αερολιμένας στο πλαίσιο της εργασίας 1, θα δημιουργηθούν τα ακόλουθα: 4,74 km νεόδμητου δικτύου ηλεκτρικής ενέργειας μέσης τάσης για RES Task 2 — Εκσυγχρονισμός της καλωδιακής γραμμής SN L-265 στην πόλη Legnica — L-265. Στο πλαίσιο του έργου 2, θα υπάρχουν: 1,1 χλμ. εκσυγχρονισμένου δικτύου ηλεκτρικής ενέργειας μέσης τάσης για την εργασία 3 RES — Κατασκευή και εκσυγχρονισμός του δικτύου SN στο Strachowice — L-263. Στο πλαίσιο της εργασίας, θα κατασκευαστούν η εναέρια γραμμή SN 3xBLL- T- 70 mm², η γραμμή καλωδίων SN 3xRUHAKXS1x120/25 mm² και η εναέρια γραμμή SN GREENPAS 70 mm². Ο σταθμός μετασχηματιστών πόλων 20/0,4 kV R-263-42 θα εκσυγχρονιστεί επίσης. Η εναέρια γραμμή SN AFL-6 3x35 mm², με μικρότερη διατομή καλωδίων, θα αποσυναρμολογηθεί. 2,43 χλμ. εκσυγχρονισμένου δικτύου ηλεκτρικής ενέργειας μέσης τάσης για το RESTask 4 — Εκσυγχρονισμός του δικτύου SN στο Prochowice — L-262. Η γραμμή καλωδίων SN στον τύπο 3xXRUHAKXS 1x120/25 mm² θα εκσυγχρονιστεί. Εργασία 5 — Κατασκευή και εκσυγχρονισμός του δικτύου SN στον δήμο Prochowice — L-261. Η καλωδιακή γραμμή SN θα εκσυγχρονιστεί και θα κατασκευαστεί στον τύπο 3xXRUHAKXS 1x120/25 mm². Εργασία 6. Εκσυγχρονισμός των δικτύων SN και nN στο Kwiatkowice — L-268 με την κατασκευή σταθμού μετασχηματιστή 20/0,4 kV (Greek)
    13 August 2022
    0 references
    v rámci projektu „Výstavba a modernizácia elektrickej siete s napätím SN a nN umožňujúca pripojenie zariadení na výrobu elektrickej energie z obnoviteľných zdrojov v obci Legnica, Legnickie Pole a Prochowice“ sú plánované stavebné práce zahŕňajúce 6 úloh: Úloha 1 – Výstavba siete SN v Legnici – LGS Przybków – R275 – 2-Airport V rámci úlohy 1 sa vytvorí: 4,74 km novopostavenej rozvodnej siete stredného napätia pre RES Task 2 – Modernizácia káblovej linky SN L-265 v meste Legnica – L-265. V rámci úlohy č. 2 bude: 1,1 km modernizovanej rozvodnej siete stredného napätia pre RES Task 3 – Výstavba a modernizácia siete SN v Strachowiciach – L-263. V rámci úlohy bude vybudované nadzemné vedenie SN 3xBLL- T- 70 mm², káblové vedenie SN 3xRUHAKXS1x120/25 mm² a nadzemné vedenie SN GREENPAS 70 mm². Modernizuje sa aj 20/0,4kV R-263 – 42 pólový transformátor. Nadzemné vedenie SN AFL-6 3x35 mm², s menším prierezom drôtu, bude demontované. 2,43 km modernizovanej siete stredného napätia pre RESTask 4 – Modernizácia siete SN v Prochowiciach – L-262. Káblová linka SN typu 3xXRUHAKXS 1x120/25 mm² bude modernizovaná. Úloha 5 – Výstavba a modernizácia siete SN v obci Prochowice – L-261. Káblová linka SN bude modernizovaná a postavená na type 3xXRUHAKXS 1x120/25 mm².V rámci úlohy 5 powstanie:0,78 km novopostavenej siete stredného napätia pre RES, 1,06 km modernizovanej siete stredného napätia pre RES. Úloha 6. Modernizácia sietí SN a nN v Kwiatkowice – L-268 s výstavbou transformátorovej stanice 20/0,4kV (Slovak)
    13 August 2022
    0 references
    osana hanketta ”Työvoimaverkon rakentaminen ja nykyaikaistaminen SN:n ja nN:n jännitteellä, joka mahdollistaa uusiutuvista energialähteistä tuotettujen sähköntuotantoyksiköiden liittämisen Legnican kunnassa, Legnickie-napassa ja Prochowicen kunnassa” on suunniteltu rakennustöitä, jotka kattavat kuusi tehtävää: tehtävä 1 – SN-verkon rakentaminen Legnicaan – LGS Przybków – R275–2-lentoasema osana tehtävää 1 luodaan seuraavat toimet: 4,74 km äskettäin rakennettu keskijännite sähköverkko RES tehtävä 2 – nykyaikaistaminen kaapelilinja SN L-265 kaupungin Legnica – L-265. Tehtävän 2 osana ovat seuraavat: 1,1 km uudistettua keskijänniteverkkoa varten tehtävää 3 – SN-verkon rakentaminen ja nykyaikaistaminen Strachowicessa – L-263. Osana tehtävää rakennetaan ylälinja SN 3xBLL-T- 70 mm², kaapelilinja SN 3xRUHAKXS1x120/25 mm² ja ylälinja SN GREENPAS 70 mm². Myös 20/0,4 kV R-263–42 napa muuntaja asema nykyaikaistetaan. Siltajohto SN AFL-6 3x35 mm², jossa on pienempi johdin poikkileikkaus, puretaan. 2,43 km modernisoitua keskijänniteverkkoa RESTask 4:lle – SN-verkon nykyaikaistaminen Prochowicessa – L-262. SN kaapelilinja tyyppi 3xXRUHAKXS 1x120/25 mm² nykyaikaistetaan.Osaksi Tehtävä 4:10 km modernisoidun keskijännite sähköverkon RES. Tehtävä 5 – SN-verkon rakentaminen ja nykyaikaistaminen Prochowicen kunnassa – L-261. SN-kaapelilinjaa nykyaikaistetaan ja rakennetaan tyypin 3xXRUHAKXS 1x120/25 mm² mukaisesti. Tehtävä 6. SN- ja nN-verkkojen nykyaikaistaminen Kwiatkowicessa – L-268 rakentamalla 20/0,4 kV muuntaja-asema (Finnish)
    13 August 2022
    0 references
    a Legnica, Legnickie Pole és Prochowice településen megújuló energiaforrásokból előállított villamosenergia-termelő egységek összekapcsolását lehetővé tevő, SN és nN feszültségű villamosenergia-hálózat építése és korszerűsítése című projekt keretében 6 feladatra kiterjedő építési munkálatokat terveznek: 1. feladat – Legnica – LGS Przybków – R275–2-Repülőtér építése az 1. feladat részeként: 4,74 km új építésű középfeszültségű elektromos hálózat a RES 2. feladathoz – Az SN L-265 kábelvonal korszerűsítése Legnica – L-265 városban. A 2. feladat részeként a következők lesznek: 1,1 km korszerűsített középfeszültségű elektromos hálózat a RES 3. feladathoz – SN hálózat építése és korszerűsítése Strachowice-ban – L-263. A feladat részeként az SN 3xBLL- T-70 mm² felsővezeték, az SN 3xRUHAKXS1x120/25 mm² kábelvonal és az SN GREENPAS 70 mm² felsővezeték épül. A 20/0,4 kV R-263–42 pólusú transzformátor állomás is modernizálódik. Az SN AFL-6 3x35 mm² felsővezetéket, kisebb huzal keresztmetszettel lebontják. 2,43 km modernizált középfeszültségű elektromos hálózat RESTask 4 – Az SN hálózat korszerűsítése Prochowice-ban – L-262. A 3xXRUHAKXS 1x120/25 mm² típusú SN kábelvonal modernizálódik. Feladat – Az SN hálózat kiépítése és korszerűsítése Prochowice településen – L-261. Az SN kábelvezetéket korszerűsítik és a 3xXRUHAKXS 1x120/25 mm² típusra építik. 6. feladat. Az SN és nN hálózatok korszerűsítése Kwiatkowice-ban – L-268 egy 20/0,4 kV-os transzformátorállomás építésével (Hungarian)
    13 August 2022
    0 references
    v rámci projektu „Výstavba a modernizace elektrické sítě s napětím SN a nN umožňující připojení jednotek pro výrobu elektřiny z obnovitelných zdrojů energie v obci Legnica, Legnickie Pole a Prochowice“ jsou plánovány stavební práce zahrnující 6 úkolů: úkol 1 – Výstavba sítě SN v Legnici – LGS Przybków – R275–2-Letiště V rámci úkolu 1 bude vytvořeno: 4,74 km nově postavené sítě středního napětí pro RES Task 2 – Modernizace kabelového vedení SN L-265 ve městě Legnica – L-265. V rámci úkolu 2 bude: 1,1 km modernizované sítě středního napětí pro RES Task 3 – Výstavba a modernizace sítě SN ve Strachowicích – L-263. V rámci úkolu bude postavena trolejová linka SN 3xBLL- T- 70 mm², kabelová linka SN 3xRUHAKXS1x120/25 mm² a nadzemní vedení SN GREENPAS 70 mm². Modernizována bude i tyčová transformátorová stanice 20/0,4kV R-263–42. Nadzemní vedení SN AFL-6 3x35 mm², s menším průřezem drátu, bude demontováno. 2,43 km modernizované sítě středního napětí pro RESTask 4 – Modernizace sítě SN v Prochowicích – L-262. SN kabelové vedení na typu 3xXRUHAKXS 1x120/25 mm² bude modernizováno.Jako součást úkolu 4 powstanie:0,59 km modernizované sítě středního napětí pro obnovitelné zdroje energie. Úkol 5 – Výstavba a modernizace sítě SN v obci Prochowice – L-261. SN kabelové vedení bude modernizováno a postaveno na typu 3xXRUHAKXS 1x120/25 mm².Jako součást úkolu 5 km nově postavené sítě středního napětí pro obnovitelné zdroje energie, 1,06 km modernizované sítě středního napětí pro obnovitelné zdroje energie. Úkol 6. Modernizace SN a nN sítí v Kwiatkowice – L-268 s výstavbou 20/0,4kV transformátorové stanice (Czech)
    13 August 2022
    0 references
    projekta “Elektrotīkla ar SN un nN spriegumu būvniecība un modernizācija, kas ļauj pieslēgt elektroenerģijas ražošanas iekārtas no atjaunojamiem enerģijas avotiem Legņicas pašvaldībā, Legnickie Pole un Prochowice” ir plānots veikt 6 uzdevumus: 1. uzdevums — SN tīkla izbūve Legņicā — LGS Przybków — R275–2-Lidosta 1. uzdevuma ietvaros tiks izveidots: 4,74 km jaunbūvēta vidēja sprieguma elektrotīkla RES 2. uzdevums — Kabeļu līnijas SN L-265 modernizācija Legņicas pilsētā — L-265. Kā daļu no 2. uzdevuma būs: 1,1 km modernizēta vidēja sprieguma elektrotīkla RES 3. uzdevumam — SN tīkla būvniecība un modernizācija Strachowice — L-263. Kā daļu no uzdevuma tiks būvēta gaisvadu līnija SN 3xBLL- T- 70 mm², kabeļu līnija SN 3xRUHAKXS1x120/25 mm² un gaisvadu līnija SN GREENPAS 70 mm². Tiks modernizēta arī 20/0,4kV R-263–42 polu transformatora stacija. Gaisvadu līnija SN AFL-6 3x35 mm², ar mazāku stiepļu šķērsgriezumu, tiks demontēta. 2,43 km modernizēta vidēja sprieguma elektrotīkla RESTask 4 — SN tīkla modernizācija Prochowice — L-262. Tiks modernizēta SN kabeļu līnija uz tipa 3xXRUHAKXS 1x120/25 mm². Uzdevums — SN tīkla izbūve un modernizācija Prohovices pašvaldībā — L-261. SN kabeļu līnija tiks modernizēta un būvēta uz tipa 3xXRUHAKXS 1x120/25 mm². 6. uzdevums. SN un nN tīklu modernizācija Kwiatkowice — L-268 ar 20/0,4kV transformatoru stacijas būvniecību (Latvian)
    13 August 2022
    0 references
    mar chuid den tionscadal “Tógáil agus nuachóiriú na heangaí cumhachta le voltas SN agus nN a chumasaíonn nascadh na n-aonad giniúna leictreachais ó fhoinsí fuinnimh in-athnuaite i bhardas Legnica, Legnickie Pole agus Prochowice” pleanáilte le haghaidh oibreacha tógála a chlúdaíonn tascanna 6: Tasc 1 — Tógáil an líonra SN i Legnica — LGS Przybków — R275-2-Airport Mar chuid de Thasc 1, cruthófar an méid seo a leanas: 4.74 km de ghreille cumhachta meánvoltais nua-thógtha do Thasc 2 RES — Nuachóiriú na líne cábla SN L-265 i mbaile Legnica — L-265. Mar chuid de Thasc 2, beidh: 1.1 km d’eangach cumhachta meánvoltais nuachóirithe do Thasc 3 RES — Tógáil agus nuachóiriú an líonra SN i Strachowice — L-263. Mar chuid den tasc, tógfar an líne lastuas SN 3xBLL- T- 70 mm², líne chábla SN 3xRUHAKXS1x120/25 mm² agus líne lastuas SN GREENPAS 70 mm². Déanfar an stáisiún claochladáin cuaille 20/0.4kV R-263-42 a nuachóiriú freisin. Déanfar an líne lastuas SN AFL-6 3x35 mm², le trasghearradh sreang níos lú, a dhíchóimeáil. 2.43 km d’eangach cumhachta meánvoltais nuachóirithe do RESTask 4 — Nuachóiriú an líonra SN i Prochowice — L-262. Déanfar nuachóiriú ar an líne chábla SN ar chineál 3xXRUHAKXS 1x120/25 mm².Mar chuid de Thasc 4 powstanie:0,59 km d’eangach cumhachta nuachóirithe meánvoltais do RES. Tasc 5 — Tógáil agus nuachóiriú an líonra SN i bhardas Prochowice — L-261. Déanfar an líne chábla SN a nuachóiriú agus a thógáil ar chineál 3xXRUHAKXS 1x120/25 mm².Mar chuid de Thasc 5:00 km de ghreille cumhachta meánvoltais nua-thógtha do RES, 1.06 km de ghreille cumhachta meánvoltais nuachóirithe do RES. Tasc 6. Nuachóiriú na líonraí SN agus nN i Kwiatkowice — L-268 le stáisiún claochladáin 20/0.4kV a thógáil (Irish)
    13 August 2022
    0 references
    v okviru projekta „Izgradnja in posodobitev električnega omrežja z napetostjo SN in nN, ki omogoča priključitev enot za proizvodnjo električne energije iz obnovljivih virov energije v občini Legnica, Legnickie Pole in Prochowice“ so načrtovana gradbena dela, ki zajemajo 6 nalog: Naloga 1 – Izgradnja omrežja SN v Legnici – LGS Przybków – R275–2-Letališče V okviru naloge 1 bo ustvarjeno naslednje: 4,74 km novozgrajenega srednjenapetostnega električnega omrežja za RES Task 2 – Posodobitev kabelske linije SN L-265 v mestu Legnica – L-265. V okviru 2. naloge bodo: 1,1 km posodobljenega srednjenapetostnega električnega omrežja za nalogo 3 – Izgradnja in posodobitev omrežja SN v Strachowicah – L-263. V okviru naloge bodo zgrajeni vozni vod SN 3xBLL- T-70 mm², kabelska linija SN 3xRUHAKXS1x120/25 mm² in vozni vod SN GREENPAS 70 mm². Modernizirana bo tudi 20/0,4kV R-263–42 pole transformatorska postaja. Nadzemna linija SN AFL-6 3x35 mm², z manjšim prečnim prerezom žice, bo razstavljena. 2,43 km posodobljenega srednjenapetostnega električnega omrežja za RESTask 4 – Posodobitev omrežja SN v Prochowicah – L-262. SN kabel na tipu 3xXRUHAKXS 1x120/25 mm² bo posodobljen. Naloga 5 – Izgradnja in posodobitev omrežja SN v občini Prochowice – L-261. Kabelska linija SN bo posodobljena in zgrajena na tipu 3xXRUHAKXS 1x120/25 mm².Kot del naloge 5:1 km novozgrajenega srednjenapetostnega električnega omrežja za OVE, 1,06 km posodobljenega srednjenapetostnega električnega omrežja za OVE. Naloga 6. Posodobitev omrežij SN in nN v Kwiatkowice – L-268 z izgradnjo transformatorske postaje 20/0,4kV (Slovenian)
    13 August 2022
    0 references
    като част от проект „Строителство и модернизация на електропреносната мрежа с напрежение SN и nN, позволяващо свързването на електрогенериращи агрегати от възобновяеми енергийни източници в община Легница, Легницки полюс и Прокойце“ са предвидени строителни работи, обхващащи 6 задачи: Задача 1 — Изграждане на SN мрежа в Легница — LGS Przybków — R275—2-Airport Като част от задача 1 ще бъде създадена следното: 4,74 км новопостроена електрическа мрежа със средно напрежение за ВЕИ задача 2 — Модернизация на кабелната линия SN L-265 в град Легница — L-265. Като част от задача 2 ще има: 1,1 км модернизирана електропреносна мрежа със средно напрежение за ВЕИ задача 3 — Строителство и модернизация на SN мрежата в Strachowice — L-263. Като част от задачата ще бъдат изградени надземната линия SN 3xBLL- T- 70 mm², кабелната линия SN 3xRUHAKXS1x120/25 mm² и надземната линия SN GREENPAS 70 mm². 20/0,4 kV R-263—42 полюсна трансформаторна станция също ще бъде модернизирана. Надземната линия SN AFL-6 3x35 mm², с по-малко напречно сечение, ще бъде демонтирана. 2,43 км модернизирана електропреносна мрежа със средно напрежение за RESTask 4 — Модернизация на SN мрежата в Prochowice — L-262. Кабелната линия SN на тип 3xXRUHAKXS 1x120/25 mm² ще бъде модернизирана.Като част от задача 4:00 км модернизирана електрическа мрежа със средно напрежение за ВЕИ. Задача 5 — Строителство и модернизация на мрежата SN в община Prochowice — L-261. Кабелната линия SN ще бъде модернизирана и изградена върху тип 3xXRUHAKXS 1x120/25 mm².Като част от задача 5:00 км новопостроена електрическа мрежа със средно напрежение за ВЕИ, 1,06 км модернизирана електрическа мрежа със средно напрежение за ВЕИ. Задача 6. Модернизация на мрежите SN и nN в Kwiatkowice — L-268 с изграждането на трансформаторна станция 20/0,4 kV (Bulgarian)
    13 August 2022
    0 references
    bħala parti mill-proġett “Kostruzzjoni u modernizzazzjoni tan-netwerk tal-elettriku b’vultaġġ ta’ SN u nN li jippermetti l-konnessjoni ta’ unitajiet ta’ ġenerazzjoni tal-elettriku minn sorsi ta’ enerġija rinnovabbli fil-muniċipalità ta’ Legnica, Legnickie Pole u Prochowice” huma ppjanati għal xogħlijiet ta’ kostruzzjoni li jkopru 6 kompiti: Kompitu 1 — Kostruzzjoni tan-netwerk SN f’Legnica — LGS Przybków — R275–2-Ajruport Bħala parti mill-Kompitu 1, se jinħoloq dan li ġej: 4.74 km ta’ grilja tal-elettriku b’vultaġġ medju li għadha kif inbniet għal RES Task 2 — Modernizzazzjoni tal-linja tal-kejbil SN L-265 fil-belt ta’ Legnica — L-265. Bħala parti mill-Kompitu 2, se jkun hemm: 1.1 km ta’ grilja tal-elettriku b’vultaġġ medju modernizzata għall-Kompitu 3 tas-SER — Kostruzzjoni u modernizzazzjoni tan-netwerk SN fi Strachowice — L-263. Bħala parti mill-kompitu, se tinbena l-linja sovraposta SN 3xBLL- T- 70 mm², linja tal-kejbil SN 3xRUHAKXS1x120/25 mm² u linja fl-għoli SN GREENPAS 70 mm². L-istazzjon tat-transformer tal-arblu 20/0.4kV R-263–42 se jiġi mmodernizzat ukoll. Il-linja fl-għoli SN AFL-6 3x35 mm², b’sezzjoni trasversali tal-wajer iżgħar, se tiżżarma. 2.43 km ta’ grilja tal-elettriku modernizzata ta’ vultaġġ medju għal RESTask 4 — Modernizzazzjoni tan-netwerk SN fi Prochowice — L-262. Il-linja tal-kejbil SN fuq it-tip 3xXRUHAKXS 1x120/25 mm² se tiġi modernizzata.Bħala parti minn Task 4 powstanie:0,59 km ta ‘grilja tal-enerġija modernizzata ta’ vultaġġ medju għal RES. Kompitu 5 — Kostruzzjoni u modernizzazzjoni tan-netwerk SN fil-muniċipalità ta’ Prochowice — L-261. Il-linja tal-kejbil SN se tiġi modernizzata u mibnija fuq it-tip 3xXRUHAKXS 1x120/25 mm².Bħala parti minn Task 5 powstanie:0,78 km ta ‘grilja tal-elettriku ta’ vultaġġ medju mibnija ġdida għal RES, 1.06 km ta ‘grilja modernizzata ta’ enerġija ta ‘vultaġġ medju għal RES. Kompitu 6. Modernizzazzjoni tan-netwerks SN u nN f’Kwiatkowice — L-268 bil-kostruzzjoni ta ‘stazzjon transformer 20/0.4kV (Maltese)
    13 August 2022
    0 references
    No âmbito do projeto «Construção e modernização da rede elétrica com tensão de SN e nN, permitindo a ligação de unidades de produção de eletricidade a partir de FER no município de Legnica, Legnickie Pole i Prochowice», estão previstas obras de construção que abrangem 6 tarefas:Tarefa 1 – Construção da rede de SN em Legnica – LGS Przybków – R275-2-Aeroporto No âmbito da Tarefa 1, haverá: 4,74 km de rede elétrica de média tensão recém-construída para FER Tarefa 2 – Modernização da linha de cabos SN L-265 em Legnica – L-265. No âmbito da Tarefa 2, serão criados os seguintes elementos: 1,1 km de rede elétrica de média tensão modernizada para a tarefa 3 das FER – Construção e modernização da rede SN em Strachowice – L-263. A tarefa incluirá uma linha aérea SN 3xBLL-T-70 mm2, uma linha de cabo SN 3xXRUHAKXS1x120/25 mm2 e uma linha aérea SN GREENPAS 70 mm2. A estação de transformação de pólo 20/0.4 kV R-263-42 também será modernizada. A linha aérea SN AFL-6 3x35 mm2 será desmontada, caracterizada por uma secção mais pequena dos cabos. 2,43 km de rede elétrica de média tensão modernizada para a Tarefa RES 4 – Modernização da rede SN em Prochowice – L-262. A linha de cabo SN no tipo 3xXRUHAKXS 1x120/25 mm2 será modernizada.No âmbito da Tarefa 4, haverá:0,59 km de rede elétrica de média tensão modernizada para FER. Tarefa 5 – Construção e modernização da rede SN no município de Prochowice – L-261. A linha de cabo SN do tipo 3xXRUHAKXS 1x120/25 mm2 será modernizada e construída.No âmbito da Tarefa 5, haverá:0,78 km de rede elétrica de média tensão recentemente construída para as FER, 1,06 km de rede elétrica de média tensão modernizada para as FER. Tarefa 6. Modernização da rede SN e nN em Kwiatkowice – L-268, juntamente com a construção de uma estação de transformação de 20/0,4 kV No âmbito da Tarefa 6, haverá: 0,69 km de rede elétrica de média tensão modernizada (Portuguese)
    13 August 2022
    0 references
    som led i projektet "Bygning og modernisering af elnettet med en spænding på SN og nN, der muliggør tilslutning af elproduktionsenheder fra vedvarende energikilder i Legnica kommune, Legnickie Pole og Prochowice" er planlagt til anlægsarbejde, der dækker 6 opgaver: Opgave 1 — Opførelse af SN-nettet i Legnica — LGS Przybków — R275-2-Airport Som led i opgave 1 oprettes følgende: 4,74 km nybygget mellemspændingsnet til RES Task 2 — Modernisering af kabellinjen SN L-265 i byen Legnica — L-265. Som en del af opgave 2 vil der være: 1,1 km moderniseret mellemspændingsnet til RES Task 3 — Bygge- og modernisering af SN-nettet i Strachowice — L-263. Som en del af opgaven vil køreledning SN 3xBLL- T- 70 mm², kabellinje SN 3xRUHAKXS1x120/25 mm² og køreledning SN GREENPAS 70 mm² blive bygget. 20/0,4kV R-263-42 pole transformer station vil også blive moderniseret. Luftledningen SN AFL-6 3x35 mm², med et mindre trådtværsnit, vil blive demonteret. 2,43 km moderniseret mellemspændingsnet til RESTask 4 — Modernisering af SN-nettet i Prochowice — L-262. SN kabellinje på type 3xXRUHAKXS 1x120/25 mm² vil blive moderniseret.Som en del af opgave 4 powstanie:0,59 km moderniseret medium-spænding elnet til RES. Opgave 5 — Opførelse og modernisering af SN-nettet i Prochowice kommune — L-261. SN kabellinje vil blive moderniseret og bygget på type 3xXRUHAKXS 1x120/25 mm².Som en del af opgave 5 powstanie:0,78 km nybygget medium spænding elnet til RES, 1,06 km moderniseret medium-spænding elnet til vedvarende energikilder. Opgave 6. Modernisering af SN og nN netværk i Kwiatkowice — L-268 med opførelse af en 20/0,4kV transformer station (Danish)
    13 August 2022
    0 references
    în cadrul proiectului „Construirea și modernizarea rețelei electrice cu o tensiune de SN și nN care să permită conectarea unităților de producere a energiei electrice din surse regenerabile de energie în municipalitatea Legnica, Legnickie Pole și Prochowice” sunt planificate lucrări de construcție care acoperă 6 sarcini: Sarcina 1 – Construirea rețelei SN în Legnica – LGS Przybków – R275-2-Airport În cadrul sarcinii 1, vor fi create următoarele: 4,74 km de rețea electrică de medie tensiune nou construită pentru RES Sarcina 2 – Modernizarea liniei de cablu SN L-265 în orașul Legnica – L-265. Ca parte a sarcinii 2, vor exista: 1,1 km de rețea electrică de medie tensiune modernizată pentru RES Sarcina 3 – Construirea și modernizarea rețelei SN în Strachowice – L-263. Ca parte a sarcinii, se va construi linia aeriană SN 3xBLL- T-70 mm², linia de cablu SN 3xRUHAKXS1x120/25 mm² și linia aeriană SN GREENPAS 70 mm². Stația de transformare a stâlpilor 20/0,4kV R-263-42 va fi, de asemenea, modernizată. Linia aeriană SN AFL-6 3x35 mm², cu o secțiune transversală mai mică, va fi dezmembrată. 2,43 km de rețea electrică de medie tensiune modernizată pentru RESTask 4 – Modernizarea rețelei SN în Prochowice – L-262. Linia de cablu SN pe tipul 3xXRUHAKXS 1x120/25 mm² va fi modernizată. Sarcina 5 – Construirea și modernizarea rețelei SN în municipiul Prochowice – L-261. Linia de cablu SN va fi modernizată și construită pe tipul 3xXRUHAKXS 1x120/25 mm². Sarcina 6. Modernizarea rețelelor SN și nN în Kwiatkowice – L-268 cu construirea unei stații de transformare 20/0,4kV (Romanian)
    13 August 2022
    0 references
    som en del av projektet ”Uppbyggnad och modernisering av elnätet med en spänning på SN och nN som möjliggör anslutning av elproduktionsenheter från förnybara energikällor i kommunen Legnica, Legnickie Pole och Prochowice” planeras byggnadsarbeten som omfattar 6 uppgifter: Upprättande av SN-nätet i Legnica – LGS Przybków – R275–2-Airport Som en del av uppgift 1 kommer följande att skapas: 4,74 km nybyggt mellanspänningsnät för RES Task 2 – Modernisering av kabelledningen SN L-265 i staden Legnica – L-265. Som en del av uppgift 2 kommer det att finnas: 1,1 km moderniserat medelspänningsnät för RES Task 3 – Bygg och modernisering av SN-nätet i Strachowice – L-263. Som en del av uppgiften kommer luftledning SN 3xBLL- T-70 mm², kabelledning SN 3xRUHAKXS1x120/25 mm² och överliggande linje SN GREENPAS 70 mm² att byggas. Den 20/0,4 kV R-263–42 poltransformatorstationen kommer också att moderniseras. Den överliggande linjen SN AFL-6 3x35 mm², med en mindre tråd tvärsnitt, kommer att demonteras. 2,43 km moderniserat medelspänningsnät för RESTask 4 – Modernisering av SN-nätet i Prochowice – L-262. SN-kabelledningen på typ 3xXRUHAKXS 1x120/25 mm² kommer att moderniseras. Uppgift 5 – Uppbyggnad och modernisering av SN-nätet i kommunen Prochowice – L-261. SN-kabelledningen kommer att moderniseras och byggas på typ 3xXRUHAKXS 1x120/25 mm². Uppgift 6. Modernisering av SN- och NN-näten i Kwiatkowice – L-268 med byggandet av en 20/0,4 kV transformatorstation (Swedish)
    13 August 2022
    0 references
    WOJ.: DOLNOŚLĄSKIE, POW.: Legnica
    0 references
    WOJ.: DOLNOŚLĄSKIE, POW.: legnicki
    0 references
    24 May 2023
    0 references

    Identifiers

    RPDS.03.01.00-02-0121/16
    0 references