Pavement body construction, Luboměř (Q62182)

From EU Knowledge Graph
Revision as of 23:10, 12 October 2024 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in pt)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Project Q62182 in Czech Republic
Language Label Description Also known as
English
Pavement body construction, Luboměř
Project Q62182 in Czech Republic

    Statements

    0 references
    2,137,739.4 Czech koruna
    0 references
    85,509.58 Euro
    1 October 2020
    0 references
    2,250,252.0 Czech koruna
    0 references
    90,010.08 Euro
    1 October 2020
    0 references
    95 percent
    0 references
    8 March 2015
    0 references
    6 November 2018
    0 references
    30 November 2018
    0 references
    Obec Luboměř
    0 references

    49°40'16.0"N, 17°49'6.6"E
    0 references
    74235
    0 references
    Předkládaný projekt řeší problematiku bezpečnosti chodců v obci Luboměř. V rámci projektu dojde k vybudování nového chodníkového tělesa podél místní komunikace v centru obce. Nový chodník bude mít délku 260,70 m, přičemž v délce cca 177 m nahrazuje stávající nevyhovující chodník, zbývajících 83 m pak bude vybudováno zcela nově. (Czech)
    0 references
    The submitted project addresses the issue of pedestrian safety in the municipality of Luboměř. As part of the project, a new pavement will be built along the local road in the center of the village. The new pavement will have a length of 260.70 m, while in a length of about 177 m it replaces the existing unsatisfactory sidewalk, the remaining 83 m will then be built completely new. (English)
    23 October 2020
    0.0223337338437389
    0 references
    Le projet présenté aborde la question de la sécurité des piétons dans le village de Luboměř. Dans le cadre du projet, une nouvelle passerelle sera construite le long de la route locale au centre du village. Le nouveau trottoir aura une longueur de 260,70 m, avec une longueur d’environ 177 m remplaçant le trottoir insatisfaisant existant, les 83 m restants seront ensuite construits complètement neufs. (French)
    29 November 2021
    0 references
    Das vorgestellte Projekt befasst sich mit dem Thema Fußgängersicherheit im Dorf Luboměř. Im Rahmen des Projekts wird entlang der Ortsstraße im Zentrum des Dorfes eine neue Gehwege errichtet. Der neue Gehweg wird eine Länge von 260,70 m haben, mit einer Länge von ca. 177 m, die den bestehenden unbefriedigenden Bürgersteig ersetzt, die restlichen 83 m werden dann komplett neu gebaut. (German)
    2 December 2021
    0 references
    Het voorgestelde project heeft betrekking op de veiligheid van voetgangers in het dorp Luboměř. In het kader van het project wordt een nieuwe loopbrug gebouwd langs de lokale weg in het centrum van het dorp. De nieuwe trottoir heeft een lengte van 260,70 m, met een lengte van ongeveer 177 m ter vervanging van de bestaande onbevredigende stoep, de resterende 83 m wordt dan volledig nieuw gebouwd. (Dutch)
    13 December 2021
    0 references
    Il progetto presentato affronta la questione della sicurezza dei pedoni nel villaggio di Luboměř. Nell'ambito del progetto, un nuovo corpo passerella sarà costruito lungo la strada locale nel centro del paese. La nuova pavimentazione avrà una lunghezza di 260,70 m, con una lunghezza di circa 177 m sostituendo l'attuale marciapiede insoddisfacente, i restanti 83 m saranno poi costruiti completamente nuovi. (Italian)
    14 January 2022
    0 references
    El proyecto presentado aborda la cuestión de la seguridad de los peatones en el pueblo de Luboměř. Como parte del proyecto, se construirá un nuevo cuerpo de pasarela a lo largo de la carretera local en el centro del pueblo. El nuevo pavimento tendrá una longitud de 260,70 m, con una longitud de unos 177 m reemplazando la acera insatisfactoria existente, los 83 m restantes se construirán completamente nuevos. (Spanish)
    15 January 2022
    0 references
    Det indsendte projekt omhandler spørgsmålet om fodgængersikkerhed i Luboměř kommune. Som en del af projektet vil der blive bygget en ny fortovet langs den lokale vej i centrum af landsbyen. Den nye fortovet vil have en længde på 260,70 m, mens den i en længde på ca. 177 m erstatter den eksisterende utilfredsstillende fortov, de resterende 83 m vil derefter blive bygget helt nye. (Danish)
    24 July 2022
    0 references
    Το υποβληθέν σχέδιο αφορά το ζήτημα της ασφάλειας των πεζών στον δήμο Luboměř. Στο πλαίσιο του έργου θα κατασκευαστεί ένα νέο πεζοδρόμιο κατά μήκος του τοπικού δρόμου στο κέντρο του χωριού. Το νέο πεζοδρόμιο θα έχει μήκος 260,70 m, ενώ σε μήκος περίπου 177 m θα αντικαταστήσει το υπάρχον μη ικανοποιητικό πεζοδρόμιο, τα υπόλοιπα 83 μέτρα θα χτιστούν στη συνέχεια εντελώς νέα. (Greek)
    24 July 2022
    0 references
    Podneseni projekt bavi se pitanjem sigurnosti pješaka u općini Luboměř. U sklopu projekta izgradit će se novi pločnik uz lokalnu cestu u središtu sela. Novi pločnik duljine 260,70 m, dok će u dužini od oko 177 m zamijeniti postojeći nezadovoljavajući pločnik, preostalih 83 m bit će izgrađeno potpuno novo. (Croatian)
    24 July 2022
    0 references
    Proiectul prezentat abordează problema siguranței pietonilor în municipalitatea Luboměř. Ca parte a proiectului, va fi construit un nou trotuar de-a lungul drumului local din centrul satului. Noul trotuar va avea o lungime de 260,70 m, în timp ce într-o lungime de aproximativ 177 m înlocuiește trotuarul nesatisfăcător existent, restul de 83 m va fi apoi construit complet nou. (Romanian)
    24 July 2022
    0 references
    Predložený projekt sa zaoberá otázkou bezpečnosti chodcov v obci Luboměř. V rámci projektu bude vybudovaná nová dlažba pozdĺž miestnej cesty v centre obce. Nová dlažba bude mať dĺžku 260,70 m, zatiaľ čo v dĺžke asi 177 m nahradí existujúci neuspokojivý chodník, zvyšných 83 m bude postavený úplne nový. (Slovak)
    24 July 2022
    0 references
    Il-proġett ippreżentat jindirizza l-kwistjoni tas-sikurezza tal-persuni mexjin fil-muniċipalità ta’ Luboměř. Bħala parti mill-proġett, se jinbena bankina ġdida tul it-triq lokali fiċ-ċentru tar-raħal. Il-bankina l-ġdida se jkollha tul ta’ 260.70 m, filwaqt li f’tul ta’ madwar 177 m tieħu post il-bankalk mhux sodisfaċenti eżistenti, it-83 m li jifdal imbagħad jinbnew kompletament ġodda. (Maltese)
    24 July 2022
    0 references
    O projeto apresentado aborda a questão da segurança dos peões no município de Luboměř. Como parte do projeto, um novo pavimento será construído ao longo da estrada local no centro da aldeia. O novo pavimento terá um comprimento de 260,70 m, enquanto em um comprimento de cerca de 177 m substitui a calçada insatisfatória existente, os 83 m restantes serão construídos completamente novos. (Portuguese)
    24 July 2022
    0 references
    Toimitetussa hankkeessa käsitellään jalankulkijoiden turvallisuutta Luboměřin kunnassa. Osana hanketta rakennetaan uusi jalkakäytävä kylän keskustassa sijaitsevalle paikalliselle tielle. Uuden jalkakäytävän pituus on 260,70 m, kun taas noin 177 metrin pituinen se korvaa nykyisen epätyydyttävän jalkakäytävän ja loput 83 metriä rakennetaan täysin uusiksi. (Finnish)
    24 July 2022
    0 references
    Przedstawiony projekt dotyczy kwestii bezpieczeństwa pieszych w gminie Luboměř. W ramach projektu wybudowany zostanie nowy chodnik wzdłuż lokalnej drogi w centrum wsi. Nowy chodnik będzie miał długość 260,70 m, podczas gdy na długości około 177 m zastępuje istniejący niezadowalający chodnik, pozostałe 83 m zostanie zbudowane całkowicie nowe. (Polish)
    24 July 2022
    0 references
    Predloženi projekt obravnava vprašanje varnosti pešcev v občini Luboměř. V okviru projekta bo ob lokalni cesti v središču vasi zgrajen nov pločnik. Novi pločnik bo imel dolžino 260,70 m, medtem ko bo v dolžini približno 177 m nadomestil obstoječo nezadovoljivo pločnik, preostalih 83 m pa bo zgrajen popolnoma nov. (Slovenian)
    24 July 2022
    0 references
    Pateiktame projekte sprendžiamas pėsčiųjų saugos Luboměř savivaldybėje klausimas. Kaip projekto dalis bus pastatytas naujas šaligatvis palei vietinį kelią kaimo centre. Naujasis grindinys bus 260,70 m ilgio, o apie 177 m ilgio jis pakeičia esamą nepatenkinamą šaligatvio, likusi 83 m bus pastatytas visiškai naujas. (Lithuanian)
    24 July 2022
    0 references
    Iesniegtais projekts pievēršas gājēju drošības jautājumam Luboměř pašvaldībā. Projekta ietvaros pa vietējo ceļu ciema centrā tiks uzbūvēta jauna bruģis. Jaunā seguma garums būs 260,70 m, bet aptuveni 177 m garumā tas aizvieto esošo neapmierinošo ietvi, atlikušie 83 m pēc tam tiks uzbūvēti pilnīgi jauni. (Latvian)
    24 July 2022
    0 references
    Представеният проект разглежда въпроса за безопасността на пешеходците в община Luboměř. Като част от проекта ще бъде изградена нова настилка по протежение на местния път в центъра на селото. Новата настилка ще бъде с дължина 260,70 m, а с дължина около 177 m замества съществуващия незадоволителен тротоар, а останалите 83 м ще бъдат изградени напълно нови. (Bulgarian)
    24 July 2022
    0 references
    A benyújtott projekt a gyalogosok biztonságának kérdésével foglalkozik Luboměř településen. A projekt részeként új burkolatot építenek a falu központjában található helyi út mentén. Az új burkolat hossza 260,70 m, míg körülbelül 177 m hosszú, a meglévő nem kielégítő járdát helyettesíti, a fennmaradó 83 m-t teljesen újjáépítik. (Hungarian)
    24 July 2022
    0 references
    Tugann an tionscadal a cuireadh isteach aghaidh ar cheist na sábháilteachta coisithe i bhardas Luboměř. Mar chuid den tionscadal, tógfar pábháil nua feadh an bhóthair áitiúil i lár an tsráidbhaile. Beidh fad 260.70 m ag an gcosán nua, agus ar feadh thart ar 177 m, tagann sé in ionad an chosáin mhíshásúil atá ann faoi láthair, tógfar an 83 m eile go hiomlán nua. (Irish)
    24 July 2022
    0 references
    I det inlämnade projektet behandlas frågan om fotgängarsäkerhet i kommunen Luboměř. Som en del av projektet kommer en ny trottoar att byggas längs den lokala vägen i centrum av byn. Den nya trottoaren kommer att ha en längd på 260,70 m, medan den på en längd av cirka 177 m ersätter den befintliga otillfredsställande trottoaren, medan de återstående 83 m kommer att byggas helt nya. (Swedish)
    24 July 2022
    0 references
    Esitatud projekt käsitleb jalakäijate ohutust Luboměři vallas. Projekti raames ehitatakse küla keskele kohalikule teele uus kõnnitee. Uus kõnnitee pikkus on 260,70 m, samas kui umbes 177 m see asendab olemasolevat mitterahuldavat kõnniteed, ülejäänud 83 m ehitatakse siis täiesti uus. (Estonian)
    24 July 2022
    0 references
    6 July 2023
    0 references

    Identifiers

    CZ.06.4.59/0.0/0.0/16_038/0005361
    0 references