Modernisation of the eastern DK exit No. 22 in Gorzów Wlkp. on the section from the Siberian roundabout to the city limits (Q85967)

From EU Knowledge Graph
Revision as of 22:24, 12 October 2024 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in pt)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Project Q85967 in Poland
Language Label Description Also known as
English
Modernisation of the eastern DK exit No. 22 in Gorzów Wlkp. on the section from the Siberian roundabout to the city limits
Project Q85967 in Poland

    Statements

    0 references
    49,278,750.8 zloty
    0 references
    10,954,666.3 Euro
    13 January 2020
    0 references
    57,975,000.95 zloty
    0 references
    12,887,842.71 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    23 December 2015
    0 references
    31 December 2023
    0 references
    MIASTO GORZÓW WIELKOPOLSKI
    0 references
    0 references

    52°43'50.2"N, 15°12'38.9"E
    0 references
    Przedmiotowa inwestycja polega na przebudowie ulic Walczaka, Bierzarina i Łukasińskiego w ciągu drogi krajowej nr 22 w Gorzowie Wielkopolskim, na odcinku około 3,6 km. Po zakończeniu realizacji inwestycji cały odcinek objęty projektem będzie drogą dwukierunkową, dwujezdniową, posiadać będzie klasę drogi GP oraz nośność 115kN/oś. (Polish)
    0 references
    This investment consists of reconstruction of Walczaka, Bierzarina and Łukasiński streets within national road No. 22 in Gorzów Wielkopolski, on a stretch of about 3.6 km. After completion of the investment, the entire section covered by the project will be two-way, two-way road, GP road class and load capacity of 115kN/axis. (English)
    14 October 2020
    0.0567216383246636
    0 references
    L’investissement en question consiste en la reconstruction des rues Walczaka, Bierzarina et Łukasińskiego sur la route nationale no 22 à Gorzów Wielkopolski, sur le tronçon d’environ 3,6 km. Une fois l’investissement terminé, toute la section couverte par le projet sera une route bidirectionnelle, elle aura une classe de route GP et une capacité de charge de 115 kN/essieu. (French)
    30 November 2021
    0 references
    Die betreffende Investition besteht in der Rekonstruktion der Straßen Walczaka, Bierzarina und Łukasińskiego innerhalb der Nationalstraße Nr. 22 in Gorzów Wielkopolski, auf dem Abschnitt von etwa 3,6 km. Nach Abschluss der Investition wird der gesamte Teil des Projekts eine zweiseitige, zweiseitige Straße sein, es wird eine Klasse von GP-Straße und eine Tragfähigkeit von 115 kN/Achse haben. (German)
    7 December 2021
    0 references
    De investering in kwestie bestaat uit de wederopbouw van de straten Walczaka, Bierzarina en Łukasińskiego binnen de nationale weg nr. 22 in Gorzów Wielkopolski, op het gedeelte van ongeveer 3,6 km. Na de voltooiing van de investering zal het volledige deel dat door het project wordt bestreken een tweerichtingsweg, tweerichtingsweg, een klasse GP-weg en een laadvermogen van 115kN/as hebben. (Dutch)
    16 December 2021
    0 references
    L'investimento in questione consiste nella ricostruzione delle strade Walczaka, Bierzarina e Łukasińskiego all'interno della strada nazionale n. 22 a Gorzów Wielkopolski, sul tratto di circa 3,6 km. Dopo il completamento dell'investimento, l'intero tratto coperto dal progetto sarà una strada bidirezionale bidirezionale, avrà una classe di strada GP e una capacità di carico di 115kN/asse. (Italian)
    16 January 2022
    0 references
    La inversión en cuestión consiste en la reconstrucción de las calles Walczaka, Bierzarina y Łukasińskiego dentro de la carretera nacional n.º 22 en Gorzów Wielkopolski, en un tramo de unos 3,6 km. Después de la finalización de la inversión, toda la sección cubierta por el proyecto será una carretera bidireccional, tendrá una clase de carretera GP y una capacidad de carga de 115kN/eje. (Spanish)
    19 January 2022
    0 references
    Den pågældende investering består i genopbygningen af gaderne Walczaka, Bierzarina og Łukasińskiego inden for nationalvej nr. 22 i Gorzów Wielkopolski på en strækning på ca. 3,6 km. Efter afslutningen af investeringen vil hele den del, der er omfattet af projektet, være en tovejsvej, den vil have en klasse GP-vej og en lastkapacitet på 115 kN/aksel. (Danish)
    26 July 2022
    0 references
    Η εν λόγω επένδυση συνίσταται στην ανακατασκευή των οδών Walczaka, Bierzarina και Łukasińskiego εντός της εθνικής οδού αριθ. 22 στο Gorzów Wielkopolski, στο τμήμα περίπου 3,6 χιλιομέτρων. Μετά την ολοκλήρωση της επένδυσης, ολόκληρο το τμήμα που καλύπτεται από το έργο θα είναι μια αμφίδρομη οδός, θα έχει μια κατηγορία δρόμου GP και χωρητικότητας 115kN/άξονα. (Greek)
    26 July 2022
    0 references
    Predmetno ulaganje sastoji se od rekonstrukcije ulica Walczaka, Bierzarina i Łukasińskiego unutar nacionalne ceste br. 22 u Gorzówu Wielkopolskom, na dionici od oko 3,6 km. Nakon završetka investicije, cijela dionica obuhvaćena projektom bit će dvosmjerna, dvosmjerna cesta, imat će klasu GP ceste i nosivost 115kN/osovine. (Croatian)
    26 July 2022
    0 references
    Investiția în cauză constă în reconstrucția străzilor Walczaka, Bierzarina și Łukasińskiego în cadrul drumului național nr. 22 din Gorzów Wielkopolski, pe tronsonul de aproximativ 3,6 km. După finalizarea investiției, întreaga secțiune acoperită de proiect va fi un drum bidirecțional, cu două sensuri, va avea o clasă de drum GP și o capacitate de încărcare de 115kN/axă. (Romanian)
    26 July 2022
    0 references
    Predmetná investícia pozostáva z rekonštrukcie ulíc Walczaka, Bierzarina a Łukasińskiego v rámci štátnej cesty č. 22 v Gorzów Wielkopolski na úseku asi 3,6 km. Po dokončení investície bude celý úsek, na ktorý sa projekt vzťahuje, obojsmerná, obojsmerná cesta, bude mať triedu ciest GP a nosnosť 115 kN/nápravu. (Slovak)
    26 July 2022
    0 references
    L-investiment inkwistjoni jikkonsisti fir-rikostruzzjoni tat-toroq Walczaka, Bierzarina u Łukasińskiego fit-triq nazzjonali Nru 22 f’Gorzów Wielkopolski, fuq is-sezzjoni ta’ madwar 3.6 km. Wara t-tlestija tal-investiment, is-sezzjoni kollha koperta mill-proġett se tkun triq bidirezzjonali, bidirezzjonali, se jkollha klassi ta’ triq GP u kapaċità ta’ tagħbija ta’ 115kN/fus. (Maltese)
    26 July 2022
    0 references
    Este investimento consiste na reconstrução das ruas Walczaka, Bierzarina e Łukasiński na estrada nacional n.o 22 em Gorzów Wielkopolski, num troço de cerca de 3,6 km. Após a conclusão do investimento, toda a secção abrangida pelo projeto será bidirecional, bidirecional, classe de estrada GP e capacidade de carga de 115kN/eixo. (Portuguese)
    26 July 2022
    0 references
    Kyseessä oleva investointi koostuu Walczakan, Bierzarinan ja Łukasińskiegon katujen jälleenrakentamisesta Gorzów Wielkopolskin maantien nro 22 varrella noin 3,6 kilometrin päähän. Investoinnin päätyttyä koko hankkeen kattama osa on kaksisuuntainen, kaksisuuntainen tie, jossa on GP-tieluokka ja kantavuus 115 kN/akseli. (Finnish)
    26 July 2022
    0 references
    Zadevna naložba zajema obnovo ulic Walczaka, Bierzarina in Łukasińskiego na nacionalni cesti št. 22 v Gorzówu Wielkopolskem na odseku približno 3,6 km. Po zaključku naložbe bo celoten odsek, ki ga bo zajemal projekt, dvosmerna, dvosmerna cesta, ki bo imela razred GP ceste in nosilnost 115 kN/os. (Slovenian)
    26 July 2022
    0 references
    Dotčená investice spočívá v rekonstrukci ulic Walczaka, Bierzarina a Łukasińskiego v rámci státní silnice č. 22 v Gorzów Wielkopolski na úseku asi 3,6 km. Po dokončení investice bude celý úsek zahrnutý do projektu obousměrnou obousměrnou silnicí, bude mít třídu GP silnice a nosnost 115kN/nápravu. (Czech)
    26 July 2022
    0 references
    Aptariamą investiciją sudaro Valčakos, Bierzarinos ir Lukasińskiego gatvių rekonstravimas šalies keliu Nr. 22 Gorzów Wielkopolski maždaug 3,6 km ruože. Užbaigus investicijas, visa projekto atkarpa bus dvipusis, dvipusis kelias, jame bus GP kelio klasė ir 115 kN/ašies keliamoji galia. (Lithuanian)
    26 July 2022
    0 references
    Attiecīgais ieguldījums ietver Walczaka, Bierzarina un Łukasińskiego ielu rekonstrukciju valsts autoceļa Nr. 22 ietvaros Gorzów Wielkopolski rajonā aptuveni 3,6 km garumā. Pēc ieguldījuma pabeigšanas viss projekta posms būs divvirzienu divvirzienu ceļš, tam būs GP ceļa klase un kravnesība 115kN/ass. (Latvian)
    26 July 2022
    0 references
    Въпросната инвестиция се състои в реконструкция на улици Walczaka, Bierzarina и Łukasińskiego в рамките на национален път № 22 в Gorzów Wielkopolski, в участъка от около 3,6 км. След приключване на инвестицията целият участък, обхванат от проекта, ще бъде двупосочен двупосочен път, ще има клас GP път и товароносимост 115kN/ос. (Bulgarian)
    26 July 2022
    0 references
    A szóban forgó beruházás a Walczaka, Bierzarina és Łukasińskiego utcák rekonstrukcióját foglalja magában a Gorzów Wielkopolski 22. számú nemzeti útszakaszon, körülbelül 3,6 km-es szakaszon. A beruházás befejezése után a projekt által lefedett teljes szakasz egy kétirányú, kétirányú út lesz, GP útosztálya és 115kN/tengely teherbírása lesz. (Hungarian)
    26 July 2022
    0 references
    Is éard atá san infheistíocht atá i gceist ná sráideanna Walczaka, Bierzarina agus Łukasińskiego a atógáil laistigh den bhóthar náisiúnta Uimh. 22 in Gorzów Wielkopolski, ar an gcuid de thart ar 3.6 km. Tar éis an infheistíocht a chríochnú, beidh an chuid iomlán atá clúdaithe ag an tionscadal ina bhóthar dhá bhealach, dhá bhealach, beidh aicme bóthair GP aige agus acmhainn ualaigh 115kN/acastóir. (Irish)
    26 July 2022
    0 references
    Investeringen i fråga består i återuppbyggnaden av gatorna Walczaka, Bierzarina och Łukasińskiego inom riksväg 22 i Gorzów Wielkopolski, på en sträcka på cirka 3,6 km. Efter slutförandet av investeringen kommer hela den del som omfattas av projektet att vara en tvåvägs, tvåvägsväg, den kommer att ha en klass av GP-väg och en lastkapacitet på 115 kN/axel. (Swedish)
    26 July 2022
    0 references
    Kõnealune investeering seisneb Walczaka, Bierzarina ja Łukasińskiego tänavate rekonstrueerimises Gorzów Wielkopolski riigimaantee nr 22 ulatuses umbes 3,6 km pikkusel lõigul. Pärast investeeringu lõpuleviimist on kogu projektiga hõlmatud osa kahesuunaline kahesuunaline tee, millel on GP-maantee klass ja kandevõime 115 kN/telg. (Estonian)
    26 July 2022
    0 references
    WOJ.: LUBUSKIE, POW.: Gorzów Wielkopolski
    0 references
    13 December 2023
    0 references

    Identifiers

    POIS.04.02.00-00-0040/16
    0 references