Lviv-Odolanów gas pipeline (Q86096)

From EU Knowledge Graph
Revision as of 22:24, 12 October 2024 by DG Regio (talk | contribs) (‎Set a claim value: summary (P836): O projeto está localizado inteiramente nas voivodias da Wielkopolska e da Baixa Silésia. Oleodutos explorados no território de municípios individuais: Lwówek, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. O projeto prevê a execução dos seguintes projetos: construção do gasoduto Lviv-Odolanów com parâmetros: diâme...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Project Q86096 in Poland
Language Label Description Also known as
English
Lviv-Odolanów gas pipeline
Project Q86096 in Poland

    Statements

    0 references
    0 references
    0 references
    350,770,020.0 zloty
    0 references
    84,184,800.0 Euro
    0 references
    615,386,000.0 zloty
    0 references
    147,692,640.0 Euro
    0 references
    57.0 percent
    0 references
    7 January 2014
    0 references
    31 August 2021
    0 references
    OPERATOR GAZOCIĄGÓW PRZESYŁOWYCH GAZ-SYSTEM S.A.
    0 references
    0 references

    51°37'49.4"N, 17°21'34.6"E
    0 references

    51°31'55.2"N, 17°16'30.7"E
    0 references

    51°46'26.8"N, 16°59'4.6"E
    0 references

    51°45'28.1"N, 17°7'19.2"E
    0 references

    51°45'54.0"N, 16°48'21.6"E
    0 references

    52°13'12.7"N, 16°31'50.2"E
    0 references

    52°13'34.7"N, 16°21'46.1"E
    0 references

    52°9'59.4"N, 16°27'48.6"E
    0 references

    52°5'0.2"N, 16°38'46.0"E
    0 references

    51°57'46.4"N, 16°49'9.5"E
    0 references

    51°42'59.0"N, 17°13'29.3"E
    0 references

    51°36'58.0"N, 17°32'4.2"E
    0 references

    51°38'46.7"N, 17°22'39.4"E
    0 references

    51°51'29.9"N, 16°50'2.0"E
    0 references

    51°54'12.2"N, 16°40'34.3"E
    0 references

    52°21'45.7"N, 16°18'56.2"E
    0 references

    52°26'56.0"N, 16°10'49.4"E
    0 references

    52°18'31.7"N, 16°24'44.6"E
    0 references

    51°34'27.1"N, 17°40'24.6"E
    0 references
    Projekt zlokalizowany jest w całości na obszarze województwa wielkopolskiego i dolnośląskiego. Przebieg gazociągu na terenie poszczególnych gmin: Lwówek, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. W ramach projektu przewiduje się realizację następujących przedsięwzięć: budowa gazociągu Lwówek-Odolanów o parametrach: średnica nominalna:1000 mm, ciśnienie robocze:8,4 MPa, długość gazociągu: etap I Lwówek-Krobia ok. L=113,5 km, etap II Krobia-Odolanów ok. L=54,1 km, przebudowa węzłów gazu: Lwówek, Kotowo, Krobia, Odolanów oraz budowa liniowych zespołów zaporowo-upustowych z układami obejściowymi wraz ze śluzą uniwersalną tłoka inspekcyjnego z infrastrukturą towarzyszącą na terenie WPG Lwówek i WPG Odolanów. (Polish)
    0 references
    The project is located entirely in the Wielkopolska and Lower Silesian Voivodeships. Pipeline run on the territory of individual communes: Lwówek, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. The project envisages the implementation of the following projects: construction of the Lviv-Odolanów pipeline with parameters: nominal diameter: 1000 mm, working pressure: 8,4 MPa, pipeline length: stage I Lwówek-Krobia ok. L=113.5 km, stage II Krobia-Odolanów approx. L=54.1 km, gas nodes reconstruction: Lwówek, Kotowo, Krobia, Odolanów and the construction of linear barrage and outlets with bypass systems together with the universal lock of inspection piston with the infrastructure accompanying the WPG Lwówek and WPG Odolanów. (English)
    14 October 2020
    0.6669238490238963
    0 references
    Le projet est entièrement situé dans les voïvodies de Wielkopolska et Dolnośląskie. L’itinéraire du gazoduc sur le territoire des municipalités individuelles: Lviv, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. Le projet prévoit les projets suivants: construction du gazoduc Lviv-Odolanów avec paramètres: diamètre nominalna:1000 mm, pression: MPa, longueur du pipeline de gaz: étape I Lviv-Krobia env. L=113,5 km, étape II Krobia-Odolanów env. L=44,1 km, reconstruction de hubs gaziers: Lviv, Kotowo, Krobia, Odolanów et construction de barrages linéaires avec systèmes de contournement ainsi qu’une serrure universelle de piston d’inspection avec infrastructure d’accompagnement dans les zones de WPG Lwówek et WPG Odolanów. (French)
    30 November 2021
    0 references
    Das Projekt befindet sich vollständig in den Woiwodschaften Wielkopolska und Dolnośląskie. Die Route der Pipeline auf dem Gebiet der einzelnen Gemeinden: Lviv, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. Das Projekt sieht folgende Projekte vor: Bau der Gaspipeline Lviv-Odolanów mit Parametern: nominalna:1000 mm, Druck robocze:8,4 MPa, Gasleitungslänge: Etappe I Lviv-Krobia ca. L=113,5 km, Etappe II Krobia-Odolanów ca. L=44,1 km, Rekonstruktion von Gasknotenpunkten: Lviv, Kotowo, Krobia, Odolanów und Bau von Lineardämmen mit Bypasssystemen zusammen mit einer universellen Sperre von Inspektionskolben mit begleitender Infrastruktur im Bereich WPG Lwówek und WPG Odolanów. (German)
    7 December 2021
    0 references
    Het project bevindt zich volledig in de voivodships Wielkopolska en Dolnośląskie. De route van de pijpleiding op het grondgebied van afzonderlijke gemeenten: Lviv, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. Het project voorziet in de volgende projecten: bouw van de Lviv-Odolanów gaspijpleiding met parameters: diameter nominalna:1000 mm, drukgrootte: 20 mm MPa, lengte van de gaspijpleiding: etappe I Lviv-Krobia ca. L=113,5 km, etappe II Krobia-Odolanów ca. L=44,1 km, reconstructie van gasnaven: Lviv, Kotowo, Krobia, Odolanów en bouw van lineaire dammen met bypasssystemen samen met een universele sluis van inspectiezuiger met bijbehorende infrastructuur op het gebied van WPG Lwówek en WPG Odolanów. (Dutch)
    16 December 2021
    0 references
    Il progetto si trova interamente nei voivodati di Wielkopolska e Dolnośląskie. L'itinerario del gasdotto sul territorio dei singoli comuni: Lviv, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. Il progetto prevede i seguenti progetti: costruzione del gasdotto Lviv-Odolanów con parametri: diametro di nominalna:1000 mm, pressione robocze:8,4 MPa, lunghezza della conduttura del gas: stadio I Lviv-Krobia ca. L=113,5 km, tappa II Krobia-Odolanów ca. L=44,1 km, ricostruzione dei mozzi del gas: Lviv, Kotowo, Krobia, Odolanów e costruzione di dighe lineari con sistemi di bypass insieme a una serratura universale del pistone di ispezione con infrastrutture di accompagnamento nella zona di WPG Lwówek e WPG Odolanów. (Italian)
    16 January 2022
    0 references
    El proyecto se encuentra íntegramente en los voivodatos de Wielkopolska y Dolnośląskie. La ruta del gasoducto en el territorio de cada municipio: Lviv, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. El proyecto prevé los siguientes proyectos: construcción del gasoducto Lviv-Odolanów con parámetros: diámetro de nominalna:1000 mm, presión robocze:8,4 MPa, longitud del gasoducto: etapa I Lviv-Krobia aprox. L=113,5 km, etapa II Krobia-Odolanów aprox. L=44,1 km, reconstrucción de cubos de gas: Lviv, Kotowo, Krobia, Odolanów y construcción de presas lineales con sistemas de derivación junto con una cerradura universal de pistón de inspección con infraestructura de acompañamiento en la zona de WPG Lwówek y WPG Odolanów. (Spanish)
    19 January 2022
    0 references
    Projektet er udelukkende beliggende i Wielkopolska og Dolnośląskie voivodships. Rørledningens rute på de enkelte kommuners område: Lviv, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. Projektet omfatter følgende projekter: anlæg af gasledningen Lviv-Odolanów med parametre: diameter nominalna:1000 mm, tryk robocze:8,4 MPa, gasledning længde: etape I Lviv-Krobia ca. L=113,5 km, etape II Krobia-Odolanów ca. L=44,1 km, rekonstruktion af gasknudepunkter: Lviv, Kotowo, Krobia, Odolanów og opførelse af lineære dæmninger med bypasssystemer sammen med en universel sluse af inspektionsstempel med tilhørende infrastruktur inden for WPG Lwówek og WPG Odolanów. (Danish)
    26 July 2022
    0 references
    Το έργο βρίσκεται εξ ολοκλήρου στα βοϊβοδάτα Wielkopolska και Dolnośląskie. Η διαδρομή του αγωγού στο έδαφος μεμονωμένων δήμων: Lviv, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. Το σχέδιο προβλέπει τα ακόλουθα έργα: κατασκευή του αγωγού φυσικού αερίου Lviv-Odolanów με παραμέτρους: διάμετρος διαμέτρων: 500 mm, πίεση: 3 mm MPa, μήκος σωληνώσεων αερίου: στάδιο I Lviv-Krobia περίπου. L=113,5 km, στάδιο II Krobia-Odolanów περίπου. L=44,1 km, ανακατασκευή κόμβων αερίου: Lviv, Kotowo, Krobia, Odolanów και κατασκευή γραμμικών φραγμάτων με συστήματα παράκαμψης μαζί με καθολική κλειδαριά του εμβόλου επιθεώρησης με συνοδευτική υποδομή στην περιοχή WPG Lwówek και WPG Odolanów. (Greek)
    26 July 2022
    0 references
    Projekt se u cijelosti nalazi u vojvodstvima Wielkopolska i Dolnośląskie. Trasa plinovoda na području pojedinih općina: Lviv, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. Projektom su predviđeni sljedeći projekti: izgradnja plinovoda Lviv-Odolanów s parametrima: promjer: 5 mm, tlak: 5 mm, MPa, duljina plinovoda: stadij I Lviv-Krobia cca. L=113,5 km, faza II Krobia-Odolanów cca. L = 44,1 km, rekonstrukcija plinskih čvorišta: Lviv, Kotowo, Krobia, Odolanów i izgradnja linearnih brana sa sustavima zaobilaznice zajedno s univerzalnom bravom ispitnog klipa s pratećom infrastrukturom na području WPG Lwówek i WPG Odolanów. (Croatian)
    26 July 2022
    0 references
    Proiectul este situat în întregime în voievodatele Wielkopolska și Dolnośląskie. Traseul conductei pe teritoriul municipalităților individuale: Lviv, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. Proiectul prevede următoarele proiecte: construcția conductei de gaz Lviv-Odolanów cu parametri: diametru nominalna:1000 mm, presiune robocze:8,4 MPa, lungimea conductei de gaz: etapa I Lviv-Krobia aprox. L=113,5 km, etapa II Krobia-Odolanów aprox. L=44,1 km, reconstrucția nodurilor de gaz: Lviv, Kotowo, Krobia, Odolanów și construirea de baraje liniare cu sisteme de ocolire, împreună cu o blocare universală a pistonului de inspecție cu infrastructura de însoțire în zona WPG Lwówek și WPG Odolanów. (Romanian)
    26 July 2022
    0 references
    Projekt sa nachádza výlučne vo Wielkopolskej a Dolnośląskie vojvodstvách. Trasa plynovodu na území jednotlivých obcí: Ľvov, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. Projekt predpokladá tieto projekty: výstavba plynovodu Lviv – Odolanów s parametrami: priemer priemeru nominalna:1000 mm, tlakové robocze:8,4 MPa, dĺžka plynového potrubia: fáza I Lviv-Krobia cca. L=113,5 km, 2. etapa Krobia-Odolanów cca. L=44,1 km, rekonštrukcia plynových uzlov: Ľvov, Kotowo, Krobia, Odolanów a výstavba lineárnych priehrad s obchvatovými systémami spolu s univerzálnou zámkou inšpekčného piestu so sprievodnou infraštruktúrou v oblasti WPG Lwówek a WPG Odolanów. (Slovak)
    26 July 2022
    0 references
    Il-proġett jinsab kollu kemm hu fil-voivodships Wielkopolska u Dolnośląskie. Ir-rotta tal-pipeline fit-territorju ta’ muniċipalitajiet individwali: Lviv, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. Il-proġett jipprevedi l-proġetti li ġejjin: kostruzzjoni tal-pipeline tal-gass Lviv-Odolanów b’parametri: dijametru ta ' nominalna:1000 mm, pressjoni robocze:8,4 MPa, it-tul tal-pipeline tal-gass: stadju I bejn wieħed u ieħor Lviv-Krobia. L=113.5 km, stadju II ta’ Krobia-Odolanów madwar. L=44.1 km, rikostruzzjoni ta’ ċentri tal-gass: Lviv, Kotowo, Krobia, Odolanów u l-kostruzzjoni ta’ digi lineari b’sistemi ta’ bypass flimkien ma’ lock universali ta’ pistun ta’ spezzjoni b’infrastruttura li takkumpanjaha fiż-żona ta’ WPG Lwówek u WPG Odolanów. (Maltese)
    26 July 2022
    0 references
    O projeto está localizado inteiramente nas voivodias da Wielkopolska e da Baixa Silésia. Oleodutos explorados no território de municípios individuais: Lwówek, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. O projeto prevê a execução dos seguintes projetos: construção do gasoduto Lviv-Odolanów com parâmetros: diâmetro nominal: 1000 mm, pressão de serviço: 8,4 MPa, comprimento da conduta: fase I Lwówek-Krobia ok. L=113,5 km, fase II Krobia-Odolanów aprox. L=54,1 km, reconstrução dos nós de gás: Lwówek, Kotowo, Krobia, Odolanów e a construção de barragens e saídas lineares com sistemas de derivação, juntamente com a fechadura universal do pistão de inspeção com a infraestrutura que acompanha o WPG Lwówek e o WPG Odolanów. (Portuguese)
    26 July 2022
    0 references
    Hanke sijaitsee kokonaan Wielkopolskan ja Dolnośląskien voivodikunnissa. Putkijohdon reitti yksittäisten kuntien alueella: Lviv, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. Hankkeessa suunnitellaan seuraavia hankkeita: Lviv-Odolanów-kaasuputken rakentaminen parametreineen: halkaisija: 100 mm, paine robocze:8,4 MPa, kaasuputken pituus: vaihe I Lviv-Krobia n. L=113,5 km, vaihe II Krobia-Odolanów noin. L=44,1 km, kaasukeskittymien jälleenrakentaminen: Lviv, Kotowo, Krobia, Odolanów ja lineaaripatojen rakentaminen ohitusjärjestelmillä sekä yleinen tarkastusmäntä ja siihen liittyvä infrastruktuuri WPG Lwówekin ja WPG Odolanówin alueella. (Finnish)
    26 July 2022
    0 references
    Projekt se v celoti nahaja v vojvodstvu Wielkopolska in Dolnośląskie. Pot plinovoda na ozemlju posameznih občin: Lviv, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. Projekt predvideva naslednje projekte: gradnja plinovoda Lviv-Odolanów s parametri: premer nominalna:1000 mm, tlak robocze:8,4 MPa, dolžina plinovoda: faza I Lviv-Krobia pribl. L=113,5 km, faza II Krobia-Odolanów pribl. L=44,1 km, rekonstrukcija plinskih vozlišč: Lviv, Kotowo, Krobia, Odolanów in gradnja linearnih jezov z obvodnimi sistemi skupaj z univerzalno ključavnico inšpekcijskega bata s spremljajočo infrastrukturo na območju WPG Lwówek in WPG Odolanów. (Slovenian)
    26 July 2022
    0 references
    Projekt se nachází výhradně ve Wielkopolské a Dolnośląskie voivodships. Trasa plynovodu na území jednotlivých obcí: Lviv, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. Projekt předpokládá následující projekty: výstavba plynovodu Lvov-Odolanów s parametry: průměr nominalna:1000 mm, tlak robocze:8,4 MPa, délka plynovodu: etapa I Lviv-Krobia cca. L=113,5 km, etapa II Krobia-Odolanów cca. L=44,1 km, rekonstrukce plynových nábojů: Lvov, Kotowo, Krobia, Odolanów a konstrukce lineárních přehrad s obtokovými systémy spolu s univerzálním zámkem kontrolního pístu s doprovodnou infrastrukturou v oblasti WPG Lwówek a WPG Odolanów. (Czech)
    26 July 2022
    0 references
    Projektas vykdomas tik Wielkopolska ir Dolnośląskie vaivadijose. Vamzdyno maršrutas atskirų savivaldybių teritorijoje: Lvovas, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. Projekte numatyti šie projektai: Lvovo-Odolanovo dujotiekio tiesimas su parametrais: skersmuo: 1 mm, slėgis: 1 000 mm, slėgis: 12 mm, dujotiekio ilgis: I etapas Lvov-Krobia apytikslis. L=113,5 km, II etapas Krobia-Odolanów. L=44,1 km, dujų mazgų rekonstrukcija: Lvovas, Kotovas, Krobija, Odolanów ir linijinių užtvankų su aplinkkelio sistemomis statyba kartu su universaliu tikrinimo stūmoklio užraktu su susijusia infrastruktūra WPG Lwówek ir WPG Odolanów rajone. (Lithuanian)
    26 July 2022
    0 references
    Projekts pilnībā atrodas Wielkopolska un Dolnośląskie vojevodistē. Cauruļvada maršruts atsevišķu pašvaldību teritorijā: Lviv, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. Projektā ir paredzēti šādi projekti: Lviv-Odolanów gāzes cauruļvada būvniecība ar parametriem: diametrs nominalna:1000 mm, spiediens robocze:8,4 MPa, gāzes cauruļvada garums: I posms Lviv-Krobia apm. L=113,5 km, II posms Krobia-Odolanów apm. L=44,1 km, gāzes mezglu rekonstrukcija: Lviv, Kotowo, Krobia, Odolanów un lineāro dambju būvniecība ar apvedceļa sistēmām kopā ar universālu pārbaudes virzuļa slēdzeni ar pievienoto infrastruktūru WPG Lwówek un WPG Odolanów teritorijā. (Latvian)
    26 July 2022
    0 references
    Проектът се намира изцяло във воеводствата Wielkopolska и Dolnośląskie. Маршрутът на газопровода на територията на отделните общини: Lviv, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. Проектът предвижда следните проекти: изграждане на газопровода Лвов-Одоланов с параметри: диаметър на диаметъра: мм, налягане Следваща: Дължина на газопровода: етап I Lviv-Krobia прибл. L=113,5 km, етап II Krobia-Odolanów прибл. L=44,1 km, реконструкция на газови хъбове: Lviv, Kotowo, Krobia, Odolanów и изграждане на линейни язовири с обходни системи, заедно с универсално заключване на инспекционното бутало с придружаваща инфраструктура в района на WPG Lwówek и WPG Odolanów. (Bulgarian)
    26 July 2022
    0 references
    A projekt teljes egészében Wielkopolska és Dolnośląskie vajdaságban található. A csővezeték útvonala az egyes települések területén: Lviv, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. A projekt a következő projekteket irányozza elő: Lviv-Odolanów gázvezeték építése paraméterekkel: átmérő: 50 mm, nyomás: 120 MPa, gázvezeték hossza: 1. szakasz Lviv-Krobia kb. L=113,5 km, II. szakasz Krobia-Odolanów kb. L=44,1 km, gázellátó központok rekonstrukciója: Lviv, Kotowo, Krobia, Odolanów és lineáris gátak megkerülési rendszerekkel, valamint univerzális ellenőrző dugattyú építése a WPG Lwówek és a WPG Odolanów területén kísérő infrastruktúrával. (Hungarian)
    26 July 2022
    0 references
    Tá an tionscadal lonnaithe go hiomlán in voivodships Wielkopolska agus Dolnoślţskie. Bealach na píblíne ar chríoch bardas aonair: Lviv, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. Foráiltear do na tionscadail seo a leanas sa tionscadal: píblíne gáis Lviv-Odolanów a thógáil le paraiméadair: trastomhas: 100 mm, brú: 1000 % MPa, fad píblíne gáis: céim I Lviv-Krobia thart. L=113.5 km, céim II Krobia-Odolanów thart. L=44.1 km, atógáil moil gháis: Lviv, Kotowo, Krobia, Odolanów agus tógáil dambaí líneacha le córais sheachbhóthar mar aon le glas uilíoch loine iniúchta le bonneagar tionlacain i réimse WPG Lwówek agus WPG Odolanów. (Irish)
    26 July 2022
    0 references
    Projektet ligger helt och hållet i Wielkopolska och Dolnośląskie voivodships. Rörledningens sträckning på enskilda kommuners territorium: Lviv, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. Projektet omfattar följande projekt: byggandet av gasledningen Lviv-Odolanów med parametrar: diameter nominalna:1000 mm, tryck robocze:8,4 MPa, gasledningslängd: steg I Lviv-Krobia ca. L=113,5 km, steg II Krobia-Odolanów ca. L=44,1 km, återuppbyggnad av gasnav: Lviv, Kotowo, Krobia, Odolanów och konstruktion av linjära dammar med bypasssystem tillsammans med ett universellt lås av inspektionskolv med tillhörande infrastruktur i området WPG Lwówek och WPG Odolanów. (Swedish)
    26 July 2022
    0 references
    Projekt asub täielikult Wielkopolska ja Dolnośląskie vojevoodkonnas. Torujuhtme marsruut üksikute omavalitsusüksuste territooriumil: Lviv, Kuślin, Opalenica, Grodzisk Wielkopolski, Granowo, Kamieniec, Kościan, Krzywiń, Osieczna, Krzemieniewo, Poniec, Krobia, Pępowo, Kobylin, Zduny, Sulmierzyce, Odolanów, Cieszków, Milicz. Projektiga nähakse ette järgmised projektid: Lviv-Odolanówi gaasijuhtme ehitamine parameetritega: läbimõõt nominalna:1000 mm, rõhk robocze:8,4 MPa, gaasitoru pikkus: i etapp Lviv-Krobia umbes. L=113,5 km, II etapp Krobia-Odolanów u. L=44,1 km, gaasisõlmede rekonstrueerimine: Lviv, Kotowo, Krobia, Odolanów ja möödasõidusüsteemidega lineaarsete tammide ehitamine koos universaalse kontrollkolvi lukuga koos sellega kaasneva infrastruktuuriga WPG Lwóweki ja WPG Odolanówi piirkonnas. (Estonian)
    26 July 2022
    0 references
    WOJ.: DOLNOŚLĄSKIE, POW.: milicki
    0 references
    WOJ.: WIELKOPOLSKIE, POW.: gostyński
    0 references
    WOJ.: WIELKOPOLSKIE, POW.: grodziski
    0 references
    WOJ.: WIELKOPOLSKIE, POW.: kościański
    0 references
    WOJ.: WIELKOPOLSKIE, POW.: krotoszyński
    0 references
    WOJ.: WIELKOPOLSKIE, POW.: leszczyński
    0 references
    WOJ.: WIELKOPOLSKIE, POW.: nowotomyski
    0 references
    WOJ.: WIELKOPOLSKIE, POW.: ostrowski
    0 references
    13 December 2023
    0 references

    Identifiers

    POIS.07.01.00-00-0001/15
    0 references
    4209
    0 references
    2016PL16RFMP007
    0 references