“An installation of the renewable energy source using only agricultural biogas, i.e. gas obtained by the methanisation process of agricultural raw materials, by-products of agriculture, liquid or solid animal excrements, by-products, wastes or residues from the processing of agricultural products or forest biomass collected from other land (Q137827)

From EU Knowledge Graph
Revision as of 00:19, 23 June 2020 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
“An installation of the renewable energy source using only agricultural biogas, i.e. gas obtained by the methanisation process of agricultural raw materials, by-products of agriculture, liquid or solid animal excrements, by-products, wastes or residues from the processing of agricultural products or forest biomass collected from other land
Project in Poland financed by DG Regio

    Statements

    0 references
    9,985,293.2 zloty
    0 references
    2,396,470.368 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    14 September 2018
    0 references
    31 December 2019
    0 references
    WIND GRUPA ADJ SP. Z O.O.
    0 references
    0 references
    W ramach realizacji projektu Wnioskodawca WIND GRUPA ADJ Sp. z o.o. wybudować instalację odnawialnych źródeł energii – biogazownię o mocy 0,8 MW. Inwestycja jest zlokalizowana w gminie Sławoborze, obręb Stare Ślepce, działka nr 8. Wnioskodawca posiada prawo do dysponowania nieruchomością na okres realizacji oraz trwałości projektu – umowa dzierżawy. Ponadto należy wskazać, że Wnioskodawca posiada komplet dokumentów niezbędnych do realizacji inwestycji (dokumentację środowiskową oraz pozwolenie na budowę). Jednocześnie mając na uwadze konieczność wykazania środków niezbędnych do realizacji projektu Wnioskodawca uzyskał promesę kredytową . Realizacja przedmiotowej inwestycji została wpisana do Planu Gospodarki Niskoemisyjnej Gminy Sławoborze. Okres realizacji inwestycji został określony: 01.08.2017 – 30.03.2019 r. W ramach projektu zostało przewidziane 1 Zadanie Budowa instalacji OZE – Biogazownia. (Polish)
    0 references
    As part of the project, the Applicant WIND GRUPA adj Sp. z o.o. constructed the installation of renewable energy sources, a biogas plant with a capacity of 0.8 MW. The investment is located in the municipality of Sławoborze, Hoe Stare Ślece, plot No 8. The applicant shall have the right to dispose of the real estate for the duration and the durability of the project — lease contract. In addition, it should be noted that the applicant has a complete set of documents necessary for the implementation of the investment (environmental documentation and planning permission). At the same time, in view of the need to demonstrate the measures needed to implement the project, the applicant has obtained a Stand-By Arrangement (SBA). The implementation of the investment in question has been included in the Plan of the Low Emission Municipality of Sławobor. The period of implementation of the investment is defined as follows: 01.08.2017-30.03.2019. the project has foreseen 1 — Construction of a renewable installation — a biogas plant. (English)
    0 references

    Identifiers

    RPZP.02.10.00-32-B253/17
    0 references