Construction of the installation of renewable energy sources at the Higher Regional Seminar of the priest in Koszalin (Q137792)

From EU Knowledge Graph
Revision as of 00:18, 23 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the installation of renewable energy sources at the Higher Regional Seminar of the priest in Koszalin
Project in Poland financed by DG Regio

    Statements

    0 references
    459,497.25 zloty
    0 references
    110,279.34 Euro
    13 January 2020
    0 references
    540,585.0 zloty
    0 references
    129,740.4 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    17 May 2018
    0 references
    12 October 2018
    0 references
    WYŻSZE SEMINARIUM DUCHOWNE DIECEZJI KOSZALIŃSKO-KOŁOBRZESKIEJ
    0 references
    0 references
    Przedmiotem projekt jest budowa 2 nadachowych instalacji fotowoltaicznych oraz 2 pomp ciepła typu powietrze- woda na potrzeby Wyższego Seminarium Duchownego w Koszalinie (WSD). Inwestycja zlokalizowana jest w Koszalinie. Projekt usytuowany jest na obszarach miejskich, na terenie gminy Miasto Koszalin, położonej w północnej cz. woj. zach-pom. Projekt ma charakter stacjonarny. We wskazanej wyżej lokalizacji zostanie zamontowany system modułów fotowoltaicznych, który wytwarzać będzie energię elektryczną pod wpływem promieniowania słonecznego oraz zamontowane zostaną pompy ciepła. W ramach realizacji projektu przewiduje się montaż źródeł OZE dla 2 budynków Wnioskodawcy: 1. Budynek auli WSD - wybudowanie systemu modułów PV o mocy 39,73 kWp na dachu obiektu oraz montaż pompy ciepła o mocy 29,30 kW dla celów c.w.u; 2. Budynek edukacyjno- sportowo - administracyjny WSD– wybudowanie systemu modułów PV o mocy 23,49 kWp na dachu budynku oraz montaż pompy ciepła o mocy 20,30 kW dla celów c.w.u. Dla obu budynków istnieją odrębne przyłącza energetyczne, stąd obie instalacje PV traktowane są jako odrębne, niezależne jednostki wytwarzania energii elektrycznej. Projektowane pompy ciepła są kompletnymi urządzeniami, gotowymi do pracy po podłączeniu. Instalacje zostaną podłączone odpowiednio do sieci elektrycznej oraz do wewnętrznej instalacji ciepłowniczej budynków. Energia elektryczna wytwarzana przez zaprojektowany system mikroinstalacji przewidziana jest do zasilania istniejących obiektów. Jej wytworzenie przyczyni się do zredukowania zużycia w ogólnym bilansie energetycznym nieruchomości Wnioskodawcy, tym samym zredukowania kosztów zakupu energii konwencjonalnej od miejscowego Operatora Energetycznego. Realizacja projektu jest komplementarna z istniejącą infrastrukturą. Etapy realizacji: 1) przygotowanie dokumentacji 2)wybór wykonawcy 3) montaż instalacji PV oraz pomp ciepła 4)odbiór inwestycji i promocja, rozliczenie projektu. (Polish)
    0 references
    The project consists of the construction of 2 superachways of photovoltaic installations and 2 air- water heat pumps for the purposes of the Higher Regional Seminar of the clergy in Koszalin (WSD). The investment is located in Koszalin. The project is located in urban areas within the municipality of the municipality of Koszalin, located in the north of the Dobra region. The project is stationary. In the location indicated above, a solar module system will be installed to generate electricity under solar radiation and a heat pump will be installed. The project foresees the installation of RES sources for the 2 Applicant buildings: 1. WSD Building — Construction of a 39,73kWp PV module on the roof of the facility and installation of a 29.30 kW heat pump for hot water; 2. A building — sport — administrative building — WSD-building — building a system of 23,49kWp units on the roof of a building and installation of a heat pump with a power of 20.30 kW for hot service water. for both buildings, separate energy connections are available, hence both PV installations are treated as separate independent power generation units. The heat pumps designed are complete equipment, ready to be attached to the work after being connected. The installations will be connected to the electricity network and to the internal district heating installation. The electricity produced by the micro-installation system designed to supply the existing facilities. Its creation will contribute to the reduction of consumption in the overall energy balance of the Applicant’s real estate, thereby reducing the costs of purchasing conventional energy from the local energy operator. The implementation of the project is complementary to existing infrastructure. Implementation steps: (1) preparation of documentation 2) selection of contractor 3) installation of PV and heat pumps 4) acceptance of investments and promotion, bill clearance) (English)
    0 references

    Identifiers

    RPZP.02.10.00-32-B157/17
    0 references