Investments in renewable energy sources by the Danish Municipality (Q131906)

From EU Knowledge Graph
Revision as of 23:07, 22 June 2020 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Investments in renewable energy sources by the Danish Municipality
Project in Poland financed by DG Regio

    Statements

    0 references
    281,448.6 zloty
    0 references
    67,547.66399999999 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2020
    0 references
    30 June 2020
    0 references
    GMINA DUBENINKI
    0 references

    54°17'20.0"N, 22°33'38.9"E
    0 references
    Inwestycja polega na zakupie i montażu w Gminie Dubeninki systemu pomp ciepła w 5 lokalizacjach, łącznie 24 jednostek o łącznej mocy 139 kW: -OSP Dubieninki, działka nr 87 i dz nr 138/205, obręb Dubeninki: 11 jednostek o łącznej mocy 75,9 kW:3 jednostki o mocy 5,6 kW,1 jednostka o mocy 11,1 kW,4 jednostki o mocy 2,9 kW,2 jednostki o mocy 18,2 kW, 1 jedn. 3,2kW -Linowo, działka nr 33/4, obręb Linowo, 5 jednostek o łącznej mocy 18,1 kW:3 jednostki o mocy 2,9 kW,1 jednostka o mocy 3,8 kW,1 jednostka o mocy jednostkowej 5,6 kW -Żytkiejmy, działka nr 164/2, obręb Żytkiejmy: 5 jednostek o łącznej mocy 30,9 kW:3 jednostki o mocy 2,9 kW,2 jednostki o mocy 11,1 kW -OSP Pluszkiejmy OSP, działka nr 80, obręb Pluszkiejmy: 3 jednostki o łącznej mocy 14,1 kW:2 jednostki o mocy 5,6 kW,1 jednostka o mocy 2,9 kW Pompa ciepła działa na zasadzie transportu ciepła, umożliwia wykorzystanie ciepła o niskiej temp. do wytw. ciepła o wyższej temp.,które można zastosować do przygotowania ciepłej wody użytkowej. Pompa ciepła do swej pracy potrzebuje jedynie en. elektr., która jest przez nią wykorzyst. b. efektywnie. Eliminuje to konieczność podłączania do bud. objętego inwest. inst.gaz. czy innego źródła paliwa stałego czy ciekłego. W związku z tym, jest to inwest. ekolog., bezpieczna i oszczędna. Pompa ciepła planowana do inst. Nie wymaga wykonania odwiertów. Projekt zostanie zakończony w ciągu 1 roku od podpisania um. o dofinansowanie. Projekt spełnia wszystkie warunki brzegowe określone w SzOOP oraz wpisuje się w założenia w SzOOP RPO WiM dla Osi Priorytetowej IV Efektywności energetycznej mające na celu zwiększeniu udziału odnawialnych źródeł energii w ogólnym bilansie energetycznym regionu. (Polish)
    0 references
    The investment consists of buying and installing a system of heat pumps at 5 locations in the municipality of Duisburg, totalling 24 units with a total capacity of 139 kW: — Bosuninger’s case, parcel No 87 and No 138/205, within Danbeinki, 11 units with a total power of 75.9 kW: 3 units with a power of 5.6 kW, 1 unit with a power of 11.1 kW, 4 units with a power of 2.9 kW, 2 units with a power of 18.2 kW, 1 units with 3.2 kW -Linowo, parcel No 33/4, Lino area, 5 units with a total power of 18.1 kW: 3 units with a power of 2.9 kW, 1 unit with a power of 3.8 kW, 1 unit with a unit capacity of 5.6 kW -Żytowe, plot No 164/2, and let the ‘Zitka’: 5 units with a total power of 30.9 kW: 3 units with a power of 2.9 kW, 2 units with a power of 11.1 kW — the TSO Pluskram, plot No 80, wheel Plusada: 3 units with a total power of 14.1 kW: 2 units with a power of 5.6 kW, 1 unit with a power of 2.9 kW Pumped heat pump operating on a heat transfer basis, allows the use of heat with a low temperature to the higher of the temperature that can be used to prepare hot water. The heat pump for its work needs only the usable electricity that it uses. This removes the need for connection to the construction of an investee or other source of solid or liquid fuel. As a result, it is an investment. ecologist., safe and cost-efficient. Heat pump to be applied. No drilling is required. The project will be completed within 1 year after signature of the grant. The project fulfils all the boundary conditions laid down in the SzOOP and is in line with the assumptions made in the ROP WiM for Priority Axis IV Energy Efficiency aiming at increasing the share of renewable energy sources in the overall energy balance of the region. (English)
    0 references

    Identifiers

    RPWM.04.01.00-28-0288/18
    0 references