Improvement of energy efficiency, coupled with an increase in the share of energy from renewable sources in the city of Racibórz — stage II (Q123976)

From EU Knowledge Graph
Revision as of 22:05, 22 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improvement of energy efficiency, coupled with an increase in the share of energy from renewable sources in the city of Racibórz — stage II
Project in Poland financed by DG Regio

    Statements

    0 references
    1,236,114.98 zloty
    0 references
    296,667.5952 Euro
    13 January 2020
    0 references
    1,765,878.56 zloty
    0 references
    423,810.85 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    20 October 2016
    0 references
    18 December 2020
    0 references
    MIASTO RACIBÓRZ
    0 references
    0 references

    50°5'25.4"N, 18°12'54.4"E
    0 references
    W projekcie przewiduje się budowę instalacji paneli fotowoltaicznych, wymianę oświetlenia na oświetlenie ledowe, termomodernizację dachu oraz przebudowę systemu wentylacji i klimatyzacji, w budynku Urzędu Miasta Racibórz przy ul Króla Stefana Batorego 6 w Raciborzu. Moduły fotowoltaiczne o łącznej mocy 40 kWp i ilości 160 sztuk zostaną zainstalowane na połaci dachowej budynku Urzędu Miasta Racibórz. W ramach wymiany oświetlenia planuje się wymianę łącznie 684 sztuk opraw na oświetlenie LED. W wyniku realizacji inwestycji zapotrzebowanie na energię końcową dla budynku zmniejszy się o 26,93%. (Polish)
    0 references
    The project envisages the construction of the installation of photovoltaic panels, the exchange of lighting for leva lighting, the thermal renovation of the roof and the reconstruction of the ventilation and air conditioning system, in the building of the Racibórz City Hall office at the King Stefan Batore 6 in Racisborz. The solar modules with a combined output of 40 kWp and a quantity of 160 units will be installed in the rooftop of the Racibórz City Hall. In the light of an exchange of lighting, a total of 684 pieces of luminaires shall be replaced on LED lighting. As a result of the investment, the final energy demand for the building will be reduced by 26.93 %. (English)
    0 references

    Identifiers

    RPSL.04.03.02-24-0486/17
    0 references