Thermo-modernisation of public utilities in the municipality of Pawłosów (Q118719)

From EU Knowledge Graph
Revision as of 20:57, 22 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermo-modernisation of public utilities in the municipality of Pawłosów
Project in Poland financed by DG Regio

    Statements

    0 references
    362,555.48 zloty
    0 references
    87,013.3152 Euro
    13 January 2020
    0 references
    426,535.93 zloty
    0 references
    102,368.62 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    30 December 2014
    0 references
    31 December 2017
    0 references
    GMINA PAWŁOSIÓW
    0 references
    Celem projektu jest poprawa czystości powietrza w gm. Pawłosiów poprzez redukcję zanieczyszczeń do atmosfery i zwiększenie efektywności energetycznej budynków. Projekt dot. modernizacji energetycznej wraz z wymianą oświetlenia 4 budynków użyteczności publicznej w gm. Pawłosiów. W budynku szkoły filialnej w Kidałowicach zaplanowano: izolację ścian i stropu poddasza, modernizację systemu CO-wymianę kotła gazowego i CWU-montaż pompy ciepła, wymianę oświetlenia w budynku na energooszczędne, odtworzenie odbojów z kostki brukowej. W budynku szkoły filialnej w Ożańsku- izolację ścian i stropu poddasza, modernizację systemu CO-wymianę kotła gazowego i CWU-montaż pompy ciepła, wymianę oświetlenia w budynku na energooszczędne. W budynku remizy strażackiej w Cieszacinie Wielkim - izolację ścian i stropu poddasza, wymianę okien na nowe - 13 szt., wymianę bram garażowych na nowe - 2 szt., modernizację systemu CO-wymianę kotła gazowego i CWU-montaż pompy ciepła, wymianę oświetlenia w budynku na energooszczędne, odtworzenie odbojów z kostki brukowej, wykonanie ścian kolankowych wraz z ociepleniem, wykonanie nowego dachu. W budynku remizy strażackiej w Tywoni - docieplenie ścian i stropu poddasza, zamurowanie nieużywanej bramy wjazdowej z dociepleniem powstałej ściany styropianem, modernizację systemu CO-wymianę kotła gazowego, wymianę oświetlenia w budynku na energooszczędne, wymianę pokrycia dachu. Wszystkie budynki po realizacji projektu spełnią wymóg uzyskania głębokiej termomodernizacji poprzez spełnienie wymagań izolacyjności cieplnej przegród oraz wyposażenia technicznego budynku podlegającego przebudowie, obowiązującego od 2021 r. oraz zostanie zmniejszone zapotrzebowanie na zużycie energii - w budynku: szkoły filialnej w Kidałowicach o 64,07%, szkoły filialnej w Ożańsku o 55,02%, remizy strażackiej w Cieszacinie Wlk. o 52,89% ,remizy strażackiej w Tywoni o 60,62%. Roczna redukcja ekwiwalentu CO2 dla projektu:59,66 t/rok. Roczna oszczędność e. finalnej:257,14 MWh (Polish)
    0 references
    The aim of the project is to improve the quality of air in the city of Pawłosides by reducing atmospheric pollution and improving the energy efficiency of buildings. Energy modernisation project with the replacement of 4 public buildings in the city of Pawłosów. The following are scheduled in the building of the Kidalowice school building: insulation of walls and costumes, modernisation of the CO-replacement of the gas boiler and CWU-installation of a heat pump, replacement of lighting in the building for energy efficient, restoration of pavers. In the Ofrog building, insulation of walls and costumes, modernisation of the system CO-replacement of the gas boiler and CWU-installation of the heat pump, replacement of lighting in the building by energy efficient buildings. The firefighter’s outfit, in Cieszyn, the wall and floor insulation of the walls and ceilings, the replacement of windows to new 13 units, the replacement of garage doors into new 2 units, the modernisation of the system of CO-replacement of the gas boiler and the CWU-installation of a heat pump, the replacement of lighting in the building on energy efficient, the reconstruction of ankles, the execution of knee walls, the execution of new roof walls, and the construction of a new roof. In the fire-fighter’s building in Tywi — insulation of walls and costumes, mourning the unused gate with a cooling wall, modernisation of the system CO-replacement of the gas boiler, replacement of lighting in the building on energy efficient, replacement of roof covering. All buildings following the project will undergo deep thermal modernisation by meeting the requirements of the thermal insulation requirements for partitions and technical equipment of the building subject to the refurbishment, in force since 2021, and will reduce the need for energy consumption — in the building: secondary school in Kidalowice by 64.07 %, Ożajsk secondary school, 55.02 % fire fighter in Cieszyn, 52.89 %. Annual reduction of CO2 equivalent for projektu:59,66 t/year. Annual saving e. finalnej:257,14 MWh (English)
    0 references

    Identifiers

    RPPK.03.02.00-18-0093/16
    0 references