Thermo-modernisation of a home with a PV installation (Q114908)

From EU Knowledge Graph
Revision as of 20:10, 22 June 2020 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermo-modernisation of a home with a PV installation
Project in Poland financed by DG Regio

    Statements

    0 references
    223,038.76 zloty
    0 references
    53,529.3024 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    2 July 2017
    0 references
    30 March 2019
    0 references
    "BISKUPIA KOPA S.C. RYSZARD LEŚNIEWSKI, DARIUSZ KACPRZYŃSKI"
    0 references
    0 references
    Przedmiotem projektu jest termomodernizacja budynku schroniska "Biskupa Kopa" w Jarnołtówku. Celem projektu jest obniżenie zużycia energii w termomodernizowanym budynku schroniska. ZBudynek jest przeznaczony do kompleksowej termomodernizacji. Projekt przewiduje komponent termomodernizacyjny, zarządzania energią oraz edukacyjny. W wyniku realizacji projektu nie jest planowana zmiana przeznaczenia budynku. Na podstawie analizy zakres przedsięwzięcia przewiduje ocieplenie dachu, stropu pod poddaszem nieogrzewanym, wymianę starej stolarki okiennej i drzwiowej, wymiana źródła ciepła na nowe z montażem nowej instalacji z izolacją montażem zaworów termostatycznych i montaż paneli PV na potrzeby energetyczne budynku. (Polish)
    0 references
    The project is a thermo-modernisation of the ‘Biskupa kapa’ hostel in Jarnołówki. The aim of the project is to reduce energy consumption in a shelter thermomodernised building of a shelter. The Building is destined for a comprehensive thermal refurbishment. The project includes a thermal modernisation component, a energy management component and an educational component. As a result of the project, a change of the destination of the building is not planned. On the basis of the analysis, the scope of the project involves the insulation of the roof, the ceiling on the non-heated screen, the replacement of the old window and door frames, the replacement of the heat source into a new installation with insulated assembly of thermostatic valves and the installation of the PV panels for the energy needs of the building. (English)
    0 references

    Identifiers

    RPOP.03.04.00-16-0009/16
    0 references