Creating the conditions for reconciling professional and family life, social integration and the development of physical culture of the inhabitants of the regeneration area by conversion of infrastructure to the villages of Homrzyska, Żeleźnikov Mala and Zhanaozen (Q114474)
Jump to navigation
Jump to search
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Creating the conditions for reconciling professional and family life, social integration and the development of physical culture of the inhabitants of the regeneration area by conversion of infrastructure to the villages of Homrzyska, Żeleźnikov Mala and Zhanaozen |
Project in Poland financed by DG Regio |
Statements
2,490,628.14 zloty
0 references
3,831,735.93 zloty
0 references
65.0 percent
0 references
1 December 2017
0 references
30 November 2020
0 references
GMINA NAWOJOWA
0 references
W ramach Projektu przewidziano: 1. Plac zabaw z siłownią w plenerze w HomrzyskachPrzebudowa boiska sportowego na plac zabaw z siłownią terenową poprzez budowę obiektów małej architektury w miejscu publicznym tj.: urządzeń siłowych typu fitness oraz urządzeń do zabaw dla dzieci, a także urządzeniem nawierzchni bezpiecznych oraz ogrodzenie części placu. Nawierzchnia z SBR płyty z gumowego prasowanego, czarnego granulatu SBR łączonego poliuretanem.2. . Przebudowa budynku usługowego na punkt przedszkolny i świetlicę środowiskową na działce ewidencyjnej nr 195 w miejscowości Żeleźnikowa Mała powierzchnia zabudowy 208,00 m2 powierzchnia użytkowa 310,3 m2 Projektowany budynek jest niepodpiwniczony o rzucie w kształcie zbliżonym do prostokąta, dach dwuspadowy o konstrukcji drewnianej, kryty blachodachówką. Budynek będzie wyposażony w następujące instalacje wewnętrzne: centralne ogrzewanie w oparciu o kotłownię gazową instalacja elektryczna, instalacja wodnokanalizacyjna. wentylacja grawitacyjna3. Przebudowę z rozbudową szkoły o salę gimnastyczną z zapleczem sportowym wraz z i infrastrukturą techniczną w Żeleźnikowej Wielkiej. powierzchnia zabudowy po rozbudowie 921,50 m2 powierzchnia użytkowa części rozbudowywanej 551,30 m2 Budynek będzie wyposażony w następujące instalacje wew. instalacja: wodociągowa, kanalizacji sanit., wentylacja grawitacyjna, c.o. część w oparciu o własną kotłownię, instal. elektr. wewnętrzna.c W zadaniu: Zarządzanie projektem następujący pracownicy Wnioskodawcy będą zaangaż. w realiz. Projektu: Prac. Gminy Koordyn. proj., zarząd. i nadzór w proj. Prac. ds. zam. publ. i drog. kontakt z IZ, uzgadn. zmian, sprawozd. i monit. proj., promocja, wn. o płatność, Prac. Ref. Inw., Budow. i Ochr. środ. przygot. postęp. o udzielenie zam. publ., przeprow. przetargu, odbiory, kontakt z Wykonawcą i Inspekt. nadzoru; Prac. Ref. Finans.budż. obsługa fina. projektu, utrzym. płynności, kontrola dok. ksieg. (Polish)
0 references
The project provides for: 1. A playground with an actuator in Homrzyskecha Reconstruction of a sports field in a playground with a ground floor playing field, through the construction of street furniture in a public place, i.e.: fitness devices and playground equipment for children, as well as a safe surface and a fence in the part of the square. Pavement from a SBR plate of compressed rubber, black grain, black SBR, combined with polyurethane ar.2. THIS IS THE CASE. The renovation of the service building into the pre-school centre and the community centre on the cadastral parcel No 195 in the Żeleźnik village was a surface area of 208.00 m² of surface area of 310.3 m². the proposed building is not ‘podpiwek’ with a rectangular shape in the shape of a wooden structure, covered by a walking frame. The building will be equipped with the following internal installations: district heating based on gas boiler electrical installation, installation of electrical drainage and gravity ventilation 3. The construction of a gym with a gym with the sports facilities with and with the technical infrastructure in Żeleźnik Wielkie in built-up areas after the extension of 921.50 m² of the surface area of the building area being expanded 551.30 m². the building will be equipped with the following installations: water supply, sanitation., gravitational ventilation, c.o. part based on own boiler, installation. Project management will be carried out by the following staff members. Fiche: The work. The municipalities of Coordination and Control in Proj. Working Officer for Public Procurement and Public Works. contact with MA, amendment, report and reminder, promotion, request for payment, Work. Procedure for granting invitations to tender, tendering procedures, contacting the Contractor and the Inspection Service; The work. Ref. finance construction. (English)
0 references
Identifiers
RPMP.11.02.00-12-0846/17
0 references