Building the environment for Dobczycki reservoir in Dobczyce — phase II (Q112960)

From EU Knowledge Graph
Revision as of 19:58, 22 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Building the environment for Dobczycki reservoir in Dobczyce — phase II
Project in Poland financed by DG Regio

    Statements

    0 references
    4,370,980.23 zloty
    0 references
    1,049,035.2552 Euro
    13 January 2020
    0 references
    6,475,526.33 zloty
    0 references
    1,554,126.32 Euro
    13 January 2020
    0 references
    67.5 percent
    0 references
    2 January 2018
    0 references
    20 March 2021
    0 references
    GMINA DOBCZYCE
    0 references
    Q2514463 (Deleted Item)
    0 references
    Projekt realizowany na terenie gminy Dobczyce, kontynuuje budowę produktu turystycznego opartego o potencjał Zbiornika Dobczyckiego, składa się z następujących zadań:1 Rozbudowa infrastruktury rekreacyjnej korty, które obejmuje budowę 3 kortów tenisowych i ścianki tenisowej oraz przebudowę budynku na zaplecze kortów,2 Modernizacja kąpieliska, które obejmuje wykonanie niecki, lodowiska i obiektu zaplecza z szatnią i SPA.Ograniczenie możliwości wykorzystania Zbiornika Dobczyckiego pod kątem dostępu do jego wód skutkuje tym, iż w chwili obecnej najbardziej zasadne i racjonalne jest bazowanie na krajobrazowej funkcji Zbiornika. Zbiornik stanowi walor, który jest głównym czynnikiem wpływającym na atrakcyjność jego otoczenia, jednak nie może on zostać bezpośrednio wykorzystany na rzecz turystyki i rekreacji. W związku z tym, funkcje, jakie mógłby pełnić Zbiornik i jakich w dużej mierze oczekują turyści odwiedzający obszar, muszą przejąć miejsca położone w jego otoczeniu, w niedalekiej od niego odległości, powiązane z nim przestrzennie i funkcjonalnie. Miejscem tego typu będzie utworzony w ramach projektu kompleks rekreacyjny zlokalizowany w Parku Miejskim w Dobczycach. Położony jest on w niedalekiej odległości od Zbiornika ok. 900 m, dokładniej od miejsca, w którym udostępniona jest korona zapory dla turystów. Kompleks rekreacyjny wraz ze Zbiornikiem szczególnie jego otwartą dla turystów koroną tworzyć będzie najatrakcyjniejszy obszar turystycznorekreacyjnych gminy Dobczyce. Kąpielisko umożliwi kontakt z wodą w bezpośrednim sąsiedztwie zbiornika do którego tafli nie ma dostępu z względu na uwarunkowania prawne. Inwestycja stanowi próbę zaspokojenia oczekiwań turystów w zakresie kąpieli, pływania i plażowania z możliwością których kojarzą się zbiorniki wodne. Rozwiązanie takie wymuszone jest specyfiką Zbiornika.W toku opracowania założeń projektu oraz dokumentacji technicznej dla projektu nie wykorzystano formuły konkursu urbanistycznoarchitektonicznego (Polish)
    0 references
    The project carried out in the commune of Dobczyce, continues the construction of a tourist product based on the potential of the Dobczycki reservoir, consists of the following tasks: 1 Extension of the recreational infrastructure, which includes the construction of 3 tennis courts and tennis walls, as well as the reconstruction of the building for the base facilities, 2 ‘The upgrading of the bathing water’, which includes the performance of the basins, fridges and facilities of the cloakroom and of SPAIONOŁA, which means that it is at present most appropriate and rational to rely on the landscape of the reservoir. The tank is the primary driver for the attractiveness of its surroundings, but it cannot be used directly for tourism and recreation. Therefore, the functions that the collecting society could play and to a large extent look forward to visitors to the site have to take over the locations in its surroundings, in the short distance from it, which is connected to it and functionally linked to it. This type of project will be created as part of the project of a recreational complex located in Dobczyce Municipal Park. It is located in the short distance from the reservoir. 900 m, more precisely from the place where the crown of the dam for tourists is made available. The recreational complex, with a special container open to tourists, will create the most attractive touristic area for the municipality of Dobczyce. The bathing water will be able to come into contact with water in the immediate vicinity of the tank to which the sheet does not have access because of the legal conditions. The investment is an attempt to meet the expectations of bathing, swimming and beach tourists with the possibility of being associated with water bodies. This is necessitated by the fact that the project and the technical documentation for the project have not been used as part of the design of the design and technical documentation of the project. (English)
    0 references

    Identifiers

    RPMP.06.03.03-12-0324/17
    0 references