    Statements

    0 references
    302,042.24 zloty
    0 references
    72,490.1376 Euro
    13 January 2020
    0 references
    541,585.59 zloty
    0 references
    129,980.54 Euro
    13 January 2020
    0 references
    55.77 percent
    0 references
    29 February 2016
    0 references
    31 December 2017
    0 references
    GMINA GRÓDEK NAD DUNAJCEM
    0 references
    Przedmiotem jest modernizacja energetyczna budynku urzędu gminy Zakres robót: - docieplenie ścian zewnętrznych styropianem 16 cm o współ. ? =0,038 - docieplenie ścian przy gruncie styropianem 5 cm o współ. ?=0,038 - docieplenie stropu pod poddaszem styropianem 23 cm o współ. ?=0,038 - wymiana oświetlenia na energooszczędne - modernizacja kotłowni z nową instalację grzewczą, wodną, pompową w układzie zamkniętym Źródłem ciepła będzie wiszący kocioł kondensacyjny Qnom.=80kW z automatyką, regulacją pogodową Wykorzystanych zostanie część istniejących grzejników spełniających warunki techniczne oraz zostaną zamontowane nowe - grzejniki płytowe o parametrach Tz/Tp=75/60° C z zaworami termostatycznymi z nastawą wstępną oraz głowicą regulacyjną - montaż instalacji solarnej z zasobnikiem o poj. 400 l. 3 kolektorami płaskimi o pow. 6,6 m2 usytuowanymi na dachu budynku Instalacja solarna będzie posiadać m.in. zawór bezpieczeństwa, naczynia przemponowe, pompy, sterowniki i zestaw czujników - montaż instalacji fotowoltaicznej o mocy 11,5 kWp w ilości 46 szt. na konstrukcji wsporczej na dachu budynku z trójfazowym falownikiem o mocy 10kW z optymizerami mocy P300. Na budynku zostaną zastosowane urządzenia do rozliczania ciepła oraz ciepłej wody - prace towarzyszące tj. tynk silikonowy na ścianach,tynk żywiczny na cokole, demontaż oraz ponowny montaż wyposażenia technicznego typu: oświetlenie zewnętrzne, instalacja odgromowa, tablice, kraty, rynny i rury spustowe, częściowa wymiana uszkodzonych rynien i rur spustowych, demontaż obudowy drewnianej pokrytej blendą blaszaną, malowanie dachu i obróbki blacharskie Wykazany zakres prac jest komplementarny do zrealizowanych drobnych prac remontowych, zgodny z technologiami wykonania, jako wariant optymalny W ramach podjętych działań nastąpi poprawa efektywności energetycznej o 62 % zostanie osiągnięta ok 49% wartość redukcji CO2 w stosunku do stanu sprzed realizacji projektu oraz 49% wartość obniżenia emisji pyłów PM10 i2,5 (Polish)
    0 references
    The subject is the energy upgrade of the Municipality of the Municipality’s Building Terms of Reference: Insulation of the outer shell of the 16-cm pin with the joint. ? = 0,038 — insulation of walls on ground 5 cm with a joint. = 0,038 — the insulation of the ceiling under the atropiate of 23 cm in the joint. = 0,038 — replacement of lighting on energy efficient — modernisation of the boiler with a new heating, water and district heating installation will be a Waszven condensing boiler Qnom. = 80 kW of automatic heaters, weather control will use part of the existing radiators complying with the technical conditions and new — plate heaters with the characteristics of Tz/Tp = 75/60 °C with thermostatic valves and the regulatory head — installation of the solar installation with a holding tank. 400. 3 flat panel collectors 6.6 m² located on the roof of the building installation will include, inter alia, a safety valve, diaphragm vessels, pumps, controls and a set of sensors — the installation of a 11,5 kWp photovoltaic installation in a quantity of 46 units on the roof, on the roof of a 10 kW roof, with an optimistic power P300. The building will be used to account for the heat and hot water — the associated work, i.e. a silicone bath on walls, a resin pad on the surface, dismantling and reassembling of the technical equipment of the type: outside lighting, guttering installation, tables, grills, guttering and drainage pipes, partial replacement of damaged guttering and trigger pipes, dismantling of a wooden casing with a bare blush, painting of the roof and the blachard’s demonstrated range of works shall be complementary to the minor refurbishment works carried out in accordance with the performance technologies as the optimal option. as part of the measures taken, the energy efficiency will be improved by 62 % of the reduction in CO2 emissions compared to the pre-project status and 49 % of the reduction in PM10 and 2,5 emissions of particulate matter. (English)
    0 references

    Identifiers

    RPMP.04.03.02-12-0216/16
    0 references