Improving the energy efficiency of the production plant of the firm ‘Crimea’, Jan Plata, in Podhale (Q112179)

From EU Knowledge Graph
Revision as of 19:45, 22 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improving the energy efficiency of the production plant of the firm ‘Crimea’, Jan Plata, in Podhale
Project in Poland financed by DG Regio

    Statements

    0 references
    1,343,423.02 zloty
    0 references
    322,421.5248 Euro
    13 January 2020
    0 references
    2,000,282.93 zloty
    0 references
    480,067.9 Euro
    13 January 2020
    0 references
    67.16 percent
    0 references
    19 July 2019
    0 references
    19 July 2021
    0 references
    FIRMA PRODUKCYJNO-HANDLOWO-USŁUGOWA "KRYSZTAŁ" JAN PLATA
    0 references
    0 references
    Przedmiotem projektu jest termomodernizacja zakładu w Podegrodziu 210. Planuje się wykonanie:1.Termomodernizacji zakładu poprzez: ocieplenie stropów i ścian zewnętrznych w 3 halach, docieplenie ściany między halami, wymianę bramy, okien i drzwi zewnętrznych w hali nieodnowionej na nowe, szczelne z niskim współczynnikiem przenikania ciepła zamiana Wentylacja grawitacyjna na Wentylacja z odzyskiem, wymianę bramy w hali odnowionej na nową, szczelną z niskim współczynnikiem przenikania ciepła zamiana Wentylacja grawitacyjna na Wentylacja z odzyskiem, wymianę bramy i okien w małej hali na nowe, szczelne z niskim współczynnikiem przenikania ciepła zamiana Wentylacja grawitacyjna na Wentylacja z odzyskiem, modernizację systemu c.w.u. zakup i montaż nowych elektrycznych podgrzewaczy.2. Montaż instalacji fotowoltaicznej wraz z inteligentnym systemem zarządzania energią do wytwarzania energii elektrycznej na potrzeby własne zakładu liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE wyniesie 154 szt., a moc zainstalowanej w projekcie energii elektrycznej urządzeń z OZE wyniesie 0,039 MWe. Roczna produkcja energii 36,2 MWhrok.3. Wykonanie audytu expost.Wykonanie wszystkich proponowanych usprawnień spowoduje redukcję zużycia energii końcowej o 1511,47 GJrok. W wyniku realizacji projektu nastąpi 65,46 wzrost efektywności energetycznej budynków zakładu oszczędność energii końcowej w stosunku do stanu przed realizacją projektu.Oszczędność energii cieplnej wyniesie 1385,18 GJrok, a oszczędność energii elektrycznej wyniesie 35,08 MWhrok.Realizacja projektu wpłynie na redukcję emisji CO2 o 48,61 tj. 134,61 Mgrok i SO2 o 71,32 kgrok, NOx o 187,69 kgrok i CO o 22,52 kgrok. W wyniku realizacji projektu nastąpi również obniżenie emisji pyłów o 67,57 kgrok.Modernizacja instalacji c.u.w. wpłynie na oszczędność wody w przedsiębiorstwie.Koszt realizacji projektu to 2 002 782,93 zł netto, a 2 463 423,00 zł brutto. (Polish)
    0 references
    The project is a thermal renovation of the plant in Podbegnative 210. A wykonanie:1.Termomodernizacji establishment is planned by: insulation of floors and walls in 3 halls, insulation of walls between the halls, replacement of gates, doors and exterior doors in a hall not renewed to new, leakproof with the replacement of the gravity by the conversion of gravity into the recovery with recovery, replacement of gates in a hall with a new low heat transfer coefficient, the replacement of the gravitational only with recovery, replacement of gates and windows in a small arena to new, leakproof with the replacement of the gravity for the recovery, modernisation of the service hot water system. purchase and installation of new electric heating appliances.2. The installation of a photovoltaic installation with a smart power management system for the production of electricity for the plant’s own needs will be 154 units, and the power installed in the electricity project for RES equipment will be 0,039 MWe. Annual energy production 36,2 MWhyear.3. Performance of all proposed improvements will lead to a reduction in final energy consumption by 1511,47 years. As a result of the project, there will be a 65,46 increase in the energy efficiency of the buildings of the plant compared to the state before project implementation. the thermal energy savings will be 1385,18 GYyear, and the electricity savings will be 35,08 MWhrok.Implementation of the project will contribute to the reduction of CO2 emissions by 48,61: 134,61 Mgr and SO2 by 71,32 kg1, NOx by 187,69 kg1 and CO by 22.52 kg/year. The project will also result in a reduction in the emissions of particulate matter by 67,57 of the subject of the modernisation of the heating system. this will affect water efficiency within the company. the cost of the project will be PLN 2 002 782,93 net and PLN 2 463 423,00 gross. (English)
    0 references

    Identifiers

    RPMP.04.02.00-12-0475/18
    0 references