Improvement of air quality by modernising the boiler space in the municipality of Opinnarra Górna — stage II (Q109114)

From EU Knowledge Graph
Revision as of 19:11, 22 June 2020 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improvement of air quality by modernising the boiler space in the municipality of Opinnarra Górna — stage II
Project in Poland financed by DG Regio

    Statements

    0 references
    1,015,008.8 zloty
    0 references
    243,602.112 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    20 June 2018
    0 references
    31 December 2019
    0 references
    GMINA OPINOGÓRA GÓRNA
    0 references

    52°54'13.7"N, 20°42'51.5"E
    0 references
    Projekt pt. „Poprawa jakości powietrza poprzez modernizację kotłowni na terenie gminy Opinogóra Górna – etap II” dotyczy wymiany czynnika grzewczego (kotłów, pieców, urządzeń grzewczych) w gospodarstwach domowych na źródła ciepła spalające biomasę, zgazowujące drewno lub wykorzystujące paliwa gazowe. Dodatkowo projekt dotyczy również inwestycji w odnawialne źródła energii (OZE) z zakresu systemów fotowoltaicznych (energia elektryczna), kolektorów słonecznych i powietrznych pomp ciepła przeznaczonych na cele ciepłej wody użytkowej. Na cele projektu została zebrana grupa docelowa odbiorców końcowych w procesie przeprowadzonej rekrutacji (zgodnie z załącznikiem numer 19a do wniosku o dofinansowanie). Zostały wykonane wizje lokalne na nieruchomościach (gospodarstwa domowe) zgłoszonych do projektu, czego efektem są uzyskane świadectwa energetyczne. Planowana inwestycja obejmuję modernizację 45 budynków mieszkalnych w zakresie wymiany urządzeń grzewczych, ponadto w 22 budynkach (łącznie 26 systemów) powstanie również infrastruktura OZE, składająca się z: - Instalacji fotowoltaicznych w systemie on-grid (16 systemów łącznie) - Instalacji kolektorów słonecznych (4 systemów łącznie) - Instalację powietrznych pomp ciepła (6 systemów łącznie) Rezultatem projektu będzie m.in. redukcja emisji CO2 w wysokości 252,62 ton CO2/rok co daje 61,79% w odniesieniu do stanu obecnego. Emisja pyłów PM10 zostanie zredukowana o wartość 209,46 kg/rok co daje 78,80% w odniesieniu do stanu obecnego. Na tle gminy Opinogóra Górna redukcja emisji pyłów PM10 przyniesie rezultat w postaci obniżenia emisji o 1,29% w stosunku do całej gminy (załącznik numer 19c). Projekt realizowany jest na terenie gminy Opinogóra Górna, która liczy 6021 mieszkańców (stan na rok 2016). Planowana inwestycja nie jest projektem rewitalizacyjnym. Inwestycja będzie realizowana w trybie "Zaprojektuj i Wybuduj". (Polish)
    0 references
    Project: “Improvement of air quality through modernisation of boiler rooms in the municipality of Opinnarra Górna — stage II” refers to the replacement of a heating factor (boilers, furnaces, heating appliances) in households for heat sources that burn biomass, gasification of wood or using gaseous fuels. In addition, the project also covers investments in renewable energy sources (RES) from solar photovoltaic (electricity), solar collectors and heat pumps for domestic hot water. The target audience of the project was collected for the project in the selection process (in accordance with Annex 19a to the funding application). Local visions have been carried out on the real estate (households) declared for the project, resulting in the resulting energy certificates. The planned investment involves modernisation of 45 residential buildings for the replacement of heating equipment, and in addition, in 22 buildings (26 systems in total), the RES infrastructure will also be built, consisting of: — On-grid solar photovoltaic (16 systems combined) — solar collectors’ systems (4 systems combined) — Air heat pump system (6 systems combined), the project will, inter alia, reduce CO2 emissions of 252,62 tonnes CO2/rok, corresponding to 61.79 % of the current situation. PM10 emissions will be reduced by 209.46 kg/year, representing 78.80 % of the current situation. Against the background of the municipality of Opinnira Górna, the reduction of PM10 emissions will result in a reduction in emissions of 1.29 % in relation to the entire municipality (Annex number 19c). The project is being implemented in the municipality of Opinborra Górna, which has a population of 6021 (as of 2016). The planned investment is not a regeneration project. The investment will be made using the “Design and demolition” mode. (English)
    0 references

    Identifiers

    RPMA.04.03.01-14-B080/18
    0 references