Industrial research and development towards the creation of a system for obtaining energy from the nature forces affecting the components (facades) of glass. (Q107931)

From EU Knowledge Graph
Revision as of 18:39, 22 June 2020 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Industrial research and development towards the creation of a system for obtaining energy from the nature forces affecting the components (facades) of glass.
Project in Poland financed by DG Regio

    Statements

    0 references
    331,999.59 zloty
    0 references
    79,679.9016 Euro
    13 January 2020
    0 references
    74.99 percent
    0 references
    1 October 2016
    0 references
    30 September 2018
    0 references
    BERNARD WIŚNIEWSKI
    0 references
    0 references

    52°14'1.3"N, 21°4'17.0"E
    0 references
    Celem projektu jest przeprowadzenie prac B+R na podstawie konceptu Wnioskodawcy „Membranowego systemu pozyskiwania energii elektrycznej” zgłoszonego do objęcia prawem patentowym. Wnioskodawca od lat prowadzi badania nad wykorzystaniem sił natury celem pozyskania energii z fasad szklanych wystawionych na działanie wiatru, słońca. Istotą wynalazku, będącego genezą projektu jest system do pozyskiwania energii opierający się na wykorzystaniu sił oddziałujących na płaskie powierzchnie. Bezpośrednim i głównym czynnikiem wzbudzającym jest energia wiatru. Dzięki niemu odkształcenia przegrody przekazywane są na elementy w postaci prądnic tulejowych. Membrana (zewnętrzna warstwa) ma za zadanie być zawsze w trybie aktywnym i generuje prąd bez względu na pory dnia czy roku. Niniejszy projekt obejmuje realizację 3 etapów: 1. Badania Przemysłowe: Opracowanie prototypu laboratoryjnego, 2.Badania Przemysłowe: Opracowanie Modelu linii technologicznej do produkcji produktu 3.Prace Rozwojowe: Prototyp w warunkach zbliżonych do rzeczywistych. Celem rynkowym projektu jest wykorzystanie sił działających na ściany osłonowe i przegrody szklane bądź analogiczne poprzez wspomnianą metodę mocowania elementów wypełniających. Projekt będzie realizowany przy współudziale podwykonawcy Jednostki Naukowej. Dokonano wstępnego wyboru wykonawcy oraz podpisano wstępne warunkowe porozumienie z Politechniką Warszawską. Czas trwania projektu przewidziano na okres 24 miesięcy. Zakończenie projektu nastąpi przygotowaniem modelu demonstracyjnego przetestowanego w warunkach rzeczywistych oraz przygotowaniem specyfika podzespołów produktu wraz z opracowanie linii produkcyjnej do zespolenia szkła, ogniw, podzespołów współpracujących. W rok po zakończeniu badań wnioskodawca chce wprowadzić na rynek innowacyjny produkt tj. licencja na produkcję układu do pozyskiwania energii w oparciu o siły natury wraz z linią produkcyjną do zespolenia szkła, ogniw, podzespołów współpracujących i linii montażowej. (Polish)
    0 references
    The objective of the project is to carry out the R & D work on the basis of the Applicant’s “membrane scheme” for patent law. The applicant has for years been conducting research into the use of physical forces to extract energy from glass facades exposed to wind, sun. The essence of the invention, which is the genesis of the project, is a power generating system based on the use of forces affecting flat surfaces. Wind power is the direct and main driver of the wind. As a result of this, the deformation of the division is passed on by means of sleeves. The membrane (outer layer) is always to be in active mode and generate current regardless of the time of day or year. This project covers the implementation of 3 steps: 1. Industrial research: Development of a laboratory prototype, 2.Industrial study: Development of model production line for product 3.Development work: A prototype in conditions similar to actual ones. The market objective of the project is the use of forces acting on curtain walls and glass partitions or by analogy through this method of fixing the filling elements. The project will be implemented with the participation of the Scientific Unit subcontractor. An initial selection of the contractor was made and a provisional conditional agreement was signed with Warsaw University of Technology. The duration of the project is 24 months. The completion of the project will be the preparation of a demonstration model tested in real terms and the preparation of the specificity of the product components together with the production of a production line for fusion of the glass, cells, the cooperating components. One year after the study, the applicant wishes to place on the market an innovative product, i.e. a licence to produce an energy system based on the forces of nature including the manufacturing line for fusion of the glass, the cells, the cooperating components and the assembly line. (English)
    0 references

    Identifiers

    RPMA.01.02.00-14-5772/16