Construction of the sanitary sewerage network in Bełewc, Koletor KP-1 — continuation (Q105589)

From EU Knowledge Graph
Revision as of 18:20, 22 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the sanitary sewerage network in Bełewc, Koletor KP-1 — continuation
Project in Poland financed by DG Regio

    Statements

    0 references
    2,913,780.39 zloty
    0 references
    699,307.2936 Euro
    13 January 2020
    0 references
    4,570,635.91 zloty
    0 references
    1,096,952.62 Euro
    13 January 2020
    0 references
    63.75 percent
    0 references
    24 July 2015
    0 references
    31 December 2020
    0 references
    GMINA BEŁŻEC
    0 references
    Celem głównym projektu jest "Poprawa stanu gospodarki ściekowej na terenie Gminy Bełżec przyczyniająca się do minimalizacji zagrożeń epidemiologicznych oraz zmniejszenie zanieczyszczenia środowiska naturalnego". Realizacja projektu umożliwi poprawę stanu infrastruktury technicznej (kanalizacja) oraz zapobiegnie degradacji środowiska naturalnego, które stanowi podstawę potencjału rozwoju Gminy i wpływa zdecydowanie na podniesienie jakości życia mieszkańców. Grupą docelową, która odniesie bezpośrednie korzyści z realizacji Projektu na poziomie jego realizacji będą: * mieszkańcy miejscowości Bełżec * instytucje oraz organizacje znajdujące się w miejscowości Bełżec * firmy, przedsiębiorcy oraz osoby prowadzące działalność gospodarczą w obrębie miejscowości Bełżec * mieszkańcy Gminy Bełżec, * instytucje oraz organizacje znajdujące się w Gminie Bełżec. Planowane przedsięwzięcie obejmuje: - wykonanie sieci kanalizacji sanitarnej podciśnieniowej z rur PE 90, PE 125, PE 160, PE 225; -wykonanie sieci grawitacyjnej z rur PCV - U -160; - wykonanie przyłączy grawitacyjnych z rur PCV - U -160; - wykonanie studni zbiorczych (zaworowych); - wykonanie studni rewizyjnych, oraz zakup i montaż prasy do odwadniania osadu nadmiernego wraz z linią do higienizacji osadu wapnem. Kanalizacja sanitarna zostanie wykonana na ulicach: Czarnieckiego, Wiejska, Kolejowa, Świerkowa, Jodłowa, Partyzantów, Reja, Piaseckiego, Leśna, Spokojna, Osiedlowa, Wrzosowa. W wyniku realizacji projektu zostaną osiągnięte poniższe wskaźniki rezultatu: 1) liczba dodatkowych osób korzystających z ulepszonego oczyszczania ścieków - 540 osób 2) Przewidywana liczba osób korzystających z ulepszonego oczyszczania ścieków - 540 osób, 3) wybudowana sieć kanalizacyjna o łącznej długości 8949,50 m.4) powierzchnia terenów objęta działaniem zakupionego sprzętu - 1954,21 ha 5) Liczba wspartych stanowisk monitoringiem środowiska - 121 szt.Czarnieckiego (Polish)
    0 references
    The purpose of the project is to ‘improve the state of the wastewater management in the commune of Bełowice in order to minimise the epidemiological risks and reduce pollution of the environment’. The implementation of the project will make it possible to improve the condition of the technical infrastructure (sewage system) and to prevent the degradation of the environment, which is the basis for the development potential of the municipality and contributes decisively to improving the quality of life of the inhabitants. The target group which will benefit directly from the implementation of the project at the level of its implementation will be: * inhabitants of Bełasc * institutions and organisations located in Bełżec *, entrepreneurs and persons carrying out an economic activity in BełżeBec * the inhabitants of Bełżeck Municipality, * institutions and organisations located in the municipality of Bełnac. The project shall consist of the following: — performance of the vacuum sanitary sewerage network from EP 90, PE 125, PE 160, PE 225; Construction of gravity networks from PVC — U — U — 160 pipes; Construction of PVC pipes — U-160 pipes; — performance of (valve) bulk; Construction of inspection wells, and purchase and assembly of a press for the dewatering of the excess sludge, along with a line to hygienise the lime sludge. The sewerage system will be carried out in the streets of: Czarnieckiego, Vienna, Railway, Świerkowa, Jodłowa, Partyzantów, Reja, Piaseczki, Leśna, Speaceful, settled, Wrzosowa. As a result of the project, the following result indicators will be achieved: (1) Number of additional persons benefiting from an improved waste water treatment — 540 persons 2) Repredicted number of persons benefiting from an improved waste water treatment — 540 persons, 3) the constructed sewerage network with a total length of 8 949.50 m.4) the surface area covered by the purchased equipment — 1 954.21 ha 5) Number of environmental monitoring sites supported — 121 Black sheets (English)
    0 references

    Identifiers

    RPLU.06.04.00-06-0010/15
    0 references