Renewable energy in the municipality of Ulan-Mallorca — installation of photovoltaic installations (Q104713)

From EU Knowledge Graph
Revision as of 17:54, 22 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Renewable energy in the municipality of Ulan-Mallorca — installation of photovoltaic installations
Project in Poland financed by DG Regio

    Statements

    0 references
    1,338,910.32 zloty
    0 references
    321,338.4768 Euro
    13 January 2020
    0 references
    1,575,188.62 zloty
    0 references
    378,045.27 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 March 2016
    0 references
    31 May 2020
    0 references
    GMINA ULAN-MAJORAT
    0 references
    Projekt (P.) zlokalizowany na ter. woj. lubelskiego, w pow. radzyńskim, w gm. Ulan-Majorat(GU).Teren P. obejmuje 18 miejscowości w GU. Zakres P. zakłada instalację 152 szt. zestawów fotowoltaicznych w obiektach prywatnych do wytwarzania energii elektrycznej o łącznej mocy 0,31MW. P. przewiduje również zaprojektowanie i wykonanie portalu internetowego, który będzie pełnił funkcje edukacyjne, promocyjne oraz oferował usługi on-line. Łączna liczba mieszkańców GU korzystających (GRUPA DOCELOWA) z efektów realizacji P. wyniesie ok.700 w 152 obiektach. Instalacje, będące przez cały okres trwałości (5lat) własnością GU, będą usytuowane na budynkach stanowiących własność osób prywat., z którymi GU. podpisała umowy użyczenia. GŁÓWNYM CELEM P. jest zwiększenie stosowania OZE na terenie GU. Cele szczegół.: CEL 1: Upowszechnienie technologii wytwarzania czystej energii wśród mieszk. poprzez powszechny montaż OZE na terenie gminy [152 szt. o łącznej mocy 0,31MW w 2018r.,produkcja 353,09 MWhe w 2019r.].; CEL 2: Redukcja zanieczyszczeń powietrza atmosferycznego poprzez zmniejsz. emisji związków szkodliwych dzięki zwiększ. udziału energii ze źródeł odnawialnych [36,02 t. ekwiwalentu CO2 / rok od 2019r.].CEL 3: Zmniejsz. obciążeń finansowych społeczności lokalnej wynikających z opłat za energię dzięki utworzeniu indywidualnych instalacji wykorzystujących OZE [152 instalacji od 2018r.]. (Polish)
    0 references
    Project (P) located in the territory of Lubelskie Province, in the county of Ulan-Majorat (GU).Teren P. comprises 18 localities in the GU. The scope of P. envisages the installation of 152 PV units in private facilities for electricity generation with a total capacity of 0.31 MW. P. also provides for the design and execution of an online portal that will serve as educational, promotional and online services. The total population of the GU of the users (GRUPA DOCELWA) with the results of the implementation of Ms P. will amount to 700 in 152 sites. Installations which are owned by the GU during its lifetime (5 years) will be located on buildings owned by people at the stage of privatisation with which GU. has signed loan agreements. The main purpose of CELEM P. is to increase the use of RES in the GU area. Specific objectives: OBJECTIVE 1: The diffusion of clean energy technologies to the residential sector through the widespread installation of RES in the municipality [152 with a total capacity of 0.31 MW in 2018, production of 353,09 MWhe in 2019]; OBJECTIVE 2: Reduction of emissions of ambient air by reducing the emission of harmful compounds by increasing the share of energy from renewable sources [36.02 t CO2/rok since 2019].Objective 3: Minority of the financial burden of local communities resulting from the energy levy due to the creation of individual RES installations [152 installations since 2018]. (English)
    0 references

    Identifiers

    RPLU.04.01.00-06-0103/16
    0 references