CONSTRUCTION OF PROSUMER MICRO-INSTALLATIONS USING RENEWABLE ENERGY SOURCES IN THE MUNICIPALITY OF SPARIA (Q101795)

From EU Knowledge Graph
Revision as of 17:20, 22 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
CONSTRUCTION OF PROSUMER MICRO-INSTALLATIONS USING RENEWABLE ENERGY SOURCES IN THE MUNICIPALITY OF SPARIA
Project in Poland financed by DG Regio

    Statements

    0 references
    787,368.94 zloty
    0 references
    188,968.54559999998 Euro
    13 January 2020
    0 references
    996,669.55 zloty
    0 references
    239,200.69 Euro
    13 January 2020
    0 references
    79.0 percent
    0 references
    20 September 2016
    0 references
    30 November 2018
    0 references
    GMINA SŁUPIA
    0 references
    0 references

    51°51'20.9"N, 19°58'5.5"E
    0 references
    Beneficjentem projektu jest Jednostka Samorządu Terytorialnego – Gmina Słupia. Celem głównym projektu jest: Zwiększenie produkcji energii ze źródeł odnawialnych i zmniejszenie wykorzystania konwencjonalnych źródeł energii na terenie gminy Słupia, skutkujące poprawą stanu środowiska naturalnego w wyniku redukcji emisji zanieczyszczeń do atmosfery. Grupą docelową projektu są wszyscy mieszkańcy gminy Słupia, oraz pośrednio mieszkańcy regionu łódzkiego. Zakres rzeczowy projektu obejmuje: ? Instalacja pompy ciepła na potrzeby c.o. i c.w.u. – 1 budynek mieszkalny, moc grzewcza: min. 8,9 kW. ? Instalacje fotowoltaiczne – budynki mieszkalne, instalacja o mocy 3,08 kWp; liczba budynków.:10; instalacja o mocy 4,2 kWp; liczba budynków: 9; instalacja o mocy 5,04 kWp; liczba budynków: 9; instalacja o mocy 6,16 kWp; liczba budynków: 2; instalacja o mocy 9,8 kWp; liczba budynków: 1. Instalacje posadowione na dachu: 28 budynków. Instalacje posadowione na gruncie: 3 budynki ? Instalacje fotowoltaiczne – budynki gospodarcze, instalacja o mocy 3,08 kWp; liczba budynków.: 3; instalacja o mocy 4,2 kWp; liczba budynków: 1; instalacja o mocy 5,04 kWp; liczba budynków: 2; instalacja o mocy 7 kWp; liczba budynków: 1. Instalacje posadowione na dachu: 7 budynków. ? Instalacje fotowoltaiczne – budynki użyteczności publicznej; instalacja o mocy 4,2 kWp; liczba budynków.: 1; instalacja o mocy 20,16 kWp; liczba budynków: 2; instalacja o mocy 14,56 kWp; liczba budynków: 1.Instalacje posadowione na dachu: 3 budynki. Instalacje posadowione na gruncie: 1 budynek. Lokalizacja projektu obejmuje miejscowości: Słupia, Zagórze, Modła, Krosnowa, Nowa Krosnowa, Gzów, Wólka-Nazdroje, Winna Góra, Podłęcze, Marianów, Bonarów. Dzięki realizacji projektu redukcja emisji CO2 zostanie osiągnięta na poziomie 92,67%. (Polish)
    0 references
    The beneficiary of the project is the Local Government. The main aim of the project is: Increasing the production of renewable energy and reducing the use of conventional energy sources in the municipality of Sparpia resulting in the improvement of the environment as a result of the reduction of atmospheric emissions. The target group of the project is all of the inhabitants of the municipality of Slypia and, indirectly, the residents of the Łódzkie region. The scope of the project includes: ? Installation of heat pump for residential heating and hot water — 1 residential building, heating capacity: min. 8.9 kW. ? Photovoltaic installations — residential buildings, 3,08 kWp installation; number of buildings: 10; 4,2 kWp installation; number of buildings: 9; 5,04 kWp installation; number of buildings: 9; 6,16 kWp installation; number of buildings: 2; 9,8 kWp installation; number of buildings: 1. Roof flooring installations: 28 buildings. Installations on the ground: 3 buildings? Photovoltaic installations — economic buildings, 3,08 kWp installation; number of buildings: 3; 4,2 kWp installation; number of buildings: 1; 5,04 kWp installation; number of buildings: 2; 7 kWp installation; number of buildings: 1. Roof flooring installations: 7 buildings. ? Photovoltaic installations — buildings of general interest; 4,2 kWp installation; number of buildings: 1; 20,16 kWp installation; number of buildings: 2; 14,56 kWp installation; number of buildings: 1.roof installations: 3 buildings. Installations on the ground: 1 building. The location of the project includes: Słupia, Zóra, Moła, Krosno, Nowa Krośna, gach, Wólka-Napodroje, must Góra, Podgórze, Marians, Bonares. The project will achieve a 92.67 % reduction in CO2 emissions. (English)
    0 references

    Identifiers

    RPLD.04.01.02-10-0105/16
    0 references