DEVELOPMENT OF PROVINCIAL ROAD NO 713 BY TOMASZÓW MAZOWIECKI — AND STEP (Q101692)

From EU Knowledge Graph
Revision as of 17:18, 22 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
DEVELOPMENT OF PROVINCIAL ROAD NO 713 BY TOMASZÓW MAZOWIECKI — AND STEP
Project in Poland financed by DG Regio

    Statements

    0 references
    15,351,302.27 zloty
    0 references
    3,684,312.5448 Euro
    13 January 2020
    0 references
    18,060,355.72 zloty
    0 references
    4,334,485.37 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    24 September 2015
    0 references
    31 December 2017
    0 references
    WOJEWÓDZTWO ŁÓDZKIE
    0 references
    0 references

    51°31'10.2"N, 20°2'1.7"E
    0 references
    Zakres Projektu obejmuje: -rozbudowę drogi -rozbiórkę i budowę konstrukcji jezdni, chodników i zjazdów -przebudowę i rozbudowę skrzyżowań wraz z przebudową dróg innych kat. -budowę ronda, zatok autobusowych i postojowych, kan. deszcz., przyłączy zasilania sygn. świetlnej -budowę i przebudowę oświetlenia drog. -remont mostu na rz. Wolbórce -przebudowę sieci: wodociąg., gazowej, teletechn.,elektroenerget., kanaliz. (deszczowej i sanitarnej w tym tłocznej) -rozbiórkę i budowę mostu przez rz. Czarną oraz dojazdów do mostu -przebudowę (umocnienie) koryta rzeki -budowę tymczas. kładki dla pieszych Wydatki zw. z przebudową sieci uzbrojenia terenu kolidującą z inwestycją dla całego Projektu, ujęte są w kat. kosztów Przebudowa infrastruktury technicznej kolidującej z inwestycją. Projekt obejmuje odc. od km 46+654 do km 49+922, ale do wartości wskaźnika produktu dot. długości przebudowanej drogi nie zostały włączone nw. odcinki: 1.47+654 do 47+665,55 (chodnik i branża wodociągowa, koszty niekwal.) 2.48+174 do 48+180 i 48+397 do 48+401 (roboty zw. z wpięciem do kan. deszczowej i nawiązaniem do zrealizowanego odcinka, koszty niekwal.) 3.48+180 do 48+397 (odc. zrealizowany w 2012 r., brak kosztów) 4.48+836 do 48+993 (odc. związany z realizacją kanalizacji deszczowej, koszty kwal.) 5.48+993 do 49+027,40 (remont mostu przez rz. Wolbórkę,koszty niekwal.) 6.49+821,54 do 49+922 (chodniki, zjazdy i zieleńce, koszty niekwal.).Celem realizacji Projektu jest:poprawa warunków technicznych, przepustowości i bezpieczeństwa ruchu kołowego (tranzytowego i lokalnego) i pieszego, dostosowanie nośności drogi do wymagań obowiązujących przepisów oraz poprawa warunków ekologicznych.Realizacja inwestycji służyć będzie mieszkańcom, którzy w celach zawodowych lub rekreacyjnych korzystają z niej, jak i osobom, przybywającym spoza regionu w celach turystycznych bądź biznesowych.Użytkownikami drogi są także przewoźnicy, kierowcy zawodowi,przedsiębiorcy,turyści przejeżdżający DW 713. (Polish)
    0 references
    The scope of the Project includes: Extension of the road to demolition and construction of roads, pavements and exits and upgrading of intersections with alterations to other categories of roads. Construction of a roundabout, bus and bus bays, can. rain., connections for the power station to be built and relighting at the site. Renovation of the bridge on government. Volbórce — network upgrade: water, gas, teletechn., electricity. The demolition of the storm and the construction of a bridge by the government. Black and commuting to the bridge — reconstruction (strengthening) of the river bed -building of the river and the footbridge, the expenditure connected with the construction of a network of arms which is in conflict with the investment for the project as a whole, is covered by the category of the cost of the construction of the technical infrastructure which will be in conflict with the investment. The project covers the distance from km 46 + 654 to km 49 + 922, but to the value of the product indicator on the length of the reconstructed road are not included: 1.47 + 654 to 47 + 665,55 (pavement and water supply, costs of non-acidic.) 2.48 + 174 to 48 + 180 and 48 + 397 to 48 + 401 (works connected with the storm to the canton of rain and the reference to the realised distance, cost of non-acid.) 3.48 + 180 to 48 + 397 (carried out in 2012, no costs) 4.48 + 836 to 48 + 993 (recovered in connection with the storm-water drainage system, cost of accommodation) 5.48 + 993 to 49 + 027,40 (renovation of the bridge by the Government. Wolbórka, costs of non-acidic.) 6.49 + 821,54 to 49 + 922 (pavements, riding and ironing stations, costs of non-accommodation).For the implementation of the project jest:poprawa the technical conditions, capacity and safety of the traffic (transit and local) and pedestrian traffic, the road load capacity adjustment to the requirements of the applicable rules and the improvement of environmental conditions. implementation of the investment will be used for residents who use it for professional or recreational purposes and for persons coming from outside the region for the purpose of tourism or business purposes.User of the road is also used by operators, professional drivers, entrepreneurs, tourists crossing the DW 713. (English)
    0 references

    Identifiers

    RPLD.03.02.01-10-0003/15
    0 references