Reconstruction and retrofitting of the rural community at the same time as the construction of an access road for the length of 80 mb with a pavement and a car park before the site (Q98858)

From EU Knowledge Graph
Revision as of 16:48, 22 June 2020 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction and retrofitting of the rural community at the same time as the construction of an access road for the length of 80 mb with a pavement and a car park before the site
Project in Poland financed by DG Regio

    Statements

    0 references
    250,375.0 zloty
    0 references
    60,090.0 Euro
    13 January 2020
    0 references
    77.37 percent
    0 references
    27 April 2018
    0 references
    31 December 2018
    0 references
    GMINA ŁUBIANKA
    0 references
    Zakresem przedmiotowego projektu jest przebudowa i doposażenie świetlicy wiejskiej w Przecznie wraz z przebudową drogi dojazdowej z chodnikiem i parkingiem przed obiektem. Działanie te realizowane będzie w związku z opracowaniem Lokalnego Programu Rewitalizacji dla Gminy Łubianka, który wskazuje obszar miejscowości Przeczno jako obszar wymagający działań rewitalizacyjnych. Projekt infrastrukturalny pozwoli na realizację szeregu działań o charakterze "miękkim", które będą miały wpływ na rewitalizację społeczno - gospodarczą miejscowości co jest celem głównym działania. W ramach prac infrastrukturalnych zaplanowano następujące prace:- wykonanie prac niezbędnych do położenia gładzi oraz położenie gładzi i wykonanie malowania ścian wewnątrz obiektu,- przeprowadzenie prac termomodernizacyjnych polegających na rozprowadzenie nowej instalacji elektrycznej w tym również nowego oświetleniaenergooszczędnego typu LED,- przebudowie podlegać będzie instalacja centralnego ogrzewania wraz z wymianą źródła ciepła,,- przeprowadzona zostanie termomodernizacja budynku polegająca na dociepleniu ścian oraz wymianie stolarki okiennej i drzwiowej, która będzie miała wpływ na koszty jego utrzymania oraz realizację celów środowiskowych (zmniejszanie emisji gazów cieplarnianych),- zakupione zostanie wyposażenie niezbędne do funkcjonowania świetlicy typu stoły, krzesła, komputery, infrastruktura do odbioru internetu itp.- wykonana zostanie przebudowa drogi dojazdowej wraz z parkingiem oraz niezbędną instalacją kanalizacji deszczowej z odprowadzeniem wód opadowo-roztopowych z powierzchni drogi do gruntu,Cały budynek będzie w pełni przystosowany do potrzeb osób niepełnosprawnych. W czasie prac przebudowy obiektu zlikwidowane zostaną bariery architektoniczne, wykonany zostanie parking dla osób niepełnosprawnych wykorzystywany będzie dotychczasowy podjazd dla osób niepełnosprawnych. (Polish)
    0 references
    The scope of this project is the renovation and retrofitting of the rural community at the same time as the construction of an access road with a walkway and a car park in front of the site. This will be done in connection with the development of a Local Revitality Programme for the Municipality of Łubianka, which identifies the area of the village to be repopulated as an area for regeneration. The infrastructure project will allow the implementation of a number of measures of a “soft” nature which will have an impact on the social regeneration of the economic locality, which is the main objective of the action. In the context of infrastructure work, the following works are planned: the completion of the works necessary for the plaice and the position of the plaice and and the operation of the walls of the wall inside the facility. the refurbishment of the new electrical installation including the replacement of the new electrical installation of the LED, the refurbishment of a central heating installation with the replacement of the heat source will be carried out. the refurbishment of the building to operate the wall and the replacement of window and door frames with an impact on the environmental objectives (reduction of greenhouse gas emissions) will be carried out. the equipment necessary for the construction of an access centre along with the car park will be carried out and the necessary installation of the storm water drainage system with the discharge of rainwater drainage from the road surface to the ground, the building will be fully adapted to the needs of persons with disabilities. At the time of the reconstruction work, the architectural barriers will be dismantled and a car park will be implemented for disabled people. (English)
    0 references

    Identifiers

    RPKP.07.01.00-04-0012/18
    0 references