Reconstruction and extension of the building at ul. Silent 4 in Nowogrodziec, including management of the site for the establishment of a social assistance facility and a plant for the reimbursement of medicinal products (Q96011)
Jump to navigation
Jump to search
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction and extension of the building at ul. Silent 4 in Nowogrodziec, including management of the site for the establishment of a social assistance facility and a plant for the reimbursement of medicinal products |
Project in Poland financed by DG Regio |
Statements
1,177,598.51 zloty
0 references
1,385,410.01 zloty
0 references
85.0 percent
0 references
15 December 2016
0 references
31 October 2019
0 references
GMINA NOWOGRODZIEC
0 references
Projekt będzie polegał na przebudowie i rozbudowie istn. obiektu dawnego Szpitala św. Józefa w N-cu przy ul. Cichej 4 w Nowogrodźcu (dz. nr 493/2 obr.4 Nowogrodziec) w celu przystosowania obiektu do nowych funkcji. W wyniku podjętych działań w budynku mają powstać 3 niezależne od siebie (organizacyjnie, funkcjonalnie i przestrzennie) placówki związane ze świadczeniem usług społecznych dla mieszkańców. Będą to: Dom Pomocy Społecznej dla osób starszych (zarząd MGOPS), Dom Opieki Specjalistycznej(zarząd SPZOZ), Zakład Rehabilitacji Leczniczej(zarząd PZOZ). Przedmiotem niniejszego projektu jest utworzenie i wyposażenie Domu Pomocy Społecznej położonego na parterze, I i II piętrze w płn-wsch. cz. budynku oraz Zakładu Rehabilitacji Leczniczej położony na parterze w płd-wsch. cz. budynku. Powierzchnia użytkowa całego budynku wynosi 2072,59 m2 (DPS: 468,97 m2, ZRL: 152,84 m2, DOS: 602,50 m2, części wspólne 848,28 m2). Koszty kwalifikowane części wspólnych oraz zagospodarowania (zieleń i dr. archtekt.) wyliczono w oparciu wskaźnik powierzchni użytkowej poszczególnych placówek (zgodnie z załączoną do wniosku metodologią). Koszty utworzenia i wyposażenia ZRL wraz z jego cz. wsp. oraz część zakresu zagosp. terenu i całość podatku VAT są w projekcie niekwalifikowane. Utworz. i wyposaż. DOS jest przedmiotem odrębnego wniosku o dofinansowanie. W ramach działań projektowych przewidziano: • przygot. dokument. projekt., • wykon. prac w ramach modernizacji budynku(cz. budowlana) wraz z zagosp. terenu, • wykon. prac instalacyjnych (elektr. i sanit.), • działania w zakresie termomodernizacji, • zakup wyposażenia DPS i ZRL, • dostos. obiektu do potrzeb osób niepełnospr., • usługi nadzoru inwest., • zapewnienie działań promocyjnych i inform. na rzecz takiego przystosowania obiektu, by mógła w nim działać placówka spełniająca standardy zgodnie z ustawą z dnia 12.03.2004 r. o pomocy społ.(Dz.U. z 2016r. poz.930) oraz Rozp. Min. Pracy i Polit. Społ. z dnia 23.08.2012 r. w sprawie d (Polish)
0 references
The project will consist of the reconstruction and extension of the legacy of the former St.’s Old Hospital. Józef, at ul. Silent 4 in Nowogrodziec (Doc. no 493/2 ring. 4 Nowogrodziec) in order to adapt the facility to the new functions. As a result of the action taken, the building is expected to be 3 independent (organisationally, functionally and spatially) of the institutions involved in the provision of social services to the inhabitants. It will be: Senior Social Welfare House (MGOPS Board), House of Special Care (SPZOZ), Zaklad Rehabilitnicza (PZOZ). The purpose of this project is to set up and equip the Farm Social Assistance House located on the ground floor, I and II on the floor of the section of the building and a plant for the Rehabilitation of Medicines located on the ground floor on the ground floor of the building. The usable surface area of the whole building is 2 072.59 m² (DPS: 468.97 m², zRL: 152.84 m², DOS: 602.50 m², parts 848.28 m²). The eligible costs of the common and management parts (green and Dr) are calculated on the basis of the floor area of each establishment (according to the methodology annexed to the application). The costs of setting up and equipping the RLs together with their part of the area and part of the area of the area and total VAT are not eligible. Building and equipping. The dos shall be the subject of a separate grant application. The following are foreseen as part of the project activities: The design. for the documentation of the project.,• the work to be carried out as part of the modernisation of the building (construction part) together with the site of the site,• the construction of the site,• completion of installation work (electrons and site.),• thermomodernisation measures,• purchase of equipment of DPS and zRL,• to adapt the facility to the needs of disabled persons;• surveillance services.,• provision of promotional activities and information. for the facility to be able to operate the facility meeting the standards in accordance with the Social Assistance Act of 12.03.2004 (Journal of Laws 2016, item 930) and Regulation (EC) No 1612/68. Minutes of work and polyt. The Social Committee of 23.08.2012 in Case D (English)
0 references
Identifiers
RPDS.06.01.01-02-0022/17
0 references