To provide access to broadband internet in the area of a fibre-optic technology in the area of Chodzież district. (Q86895)

From EU Knowledge Graph
Revision as of 15:06, 22 June 2020 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
To provide access to broadband internet in the area of a fibre-optic technology in the area of Chodzież district.
Project in Poland financed by DG Regio

    Statements

    0 references
    3,534,529.7 zloty
    0 references
    848,287.128 Euro
    13 January 2020
    0 references
    59.11 percent
    0 references
    29 February 2016
    0 references
    30 June 2018
    0 references
    ASTA-NET SPÓŁKA AKCYJNA
    0 references
    0 references

    52°53'27.2"N, 16°59'1.0"E
    0 references

    52°59'42.0"N, 16°55'11.6"E
    0 references

    53°2'39.5"N, 16°47'26.2"E
    0 references

    52°58'23.9"N, 17°5'41.6"E
    0 references

    53°1'46.2"N, 17°7'23.9"E
    0 references
    Projekt będzie realizowany na obszarze POPC01_301161 (woj. wielkopolskie, pow. chodzieski), na którym zidentyfikowano 2114 gosp. dom., które nie posiadają dostępu do Internetu NGA. Dla powyższego obszaru wyznaczono min. liczbę przyłączy jakie należy wykonać w ramach projektu na poziomie 1136 szt. oraz „Liczbę placówek eduk. i placówek służby zdrowia do podłączenia na obszarze interwencji” w ilości 1 szt. Maksymalna kwota dofi. projektu wynosi 3.537.013,00 zł, a intensywność wsparcia - 60% wyd. kwalifik. W ramach planowanej inwestycji Wnioskodawca: - wybuduje sieć o długości 55,87 km, - obejmie zasięgiem sieci 1356 gosp. dom., - obejmie zasięgiem sieci 1 placówkę edukacyjną / placówkę służby zdrowia,- utworzy 2 węzły dostęp. sieci. Projekt będzie realizowany przez 24 miesiące – od 01.07.2016 r. do 30.06.2018 r. Zaplanowane prace podzielono na 7 zadań. Zadanie 1 i 2 będą realizowane przed rozpoczęciem projektu i obejmą: - przygot. dokument. niezbędnej do złożenia wniosku o dofin.,- wybór wykonawcy. Dobierając technologię budowy sieci, wykonawca brał pod uwagę:- wydajność,- niezawodność,- skalowalność i komplementarność,- koszty eksploatacji,- funkcjonalność i łatwość zarządzania.Wskazane czynniki zadecydowały o wyborze technologii FTTH, jako technologii, która zostanie wykorzystana do budowy przedmiotowej sieci. Projekt będzie realizowany w trybie „zaprojektuj i wybuduj” - wszystkie prace projektowe, budowlane i instalacyjne zostaną zlecone wyłonionemu w ramach zbierania ofert wykonawcy.W celu prawidłowej realizacji projektu powstanie „Zespół projektowy”, którego zadaniem będzie:-monit. przebiegu realizacji inwestycji zgodnie z harmonogr.,- dokonywanie odbiorów prac,-rozliczanie projektu.W skład zespołu projektowego wejdą pracownicy:- Wnioskodawcy - 4 os.- firmy ARVADO Consulting – 1 os. (Polish)
    0 references
    The project will be implemented in the area of POP01_301161 (Wielkopolskie province, poważieski) where 2114 households have been identified and which do not have access to the NGA Internet.For this area, there is a minimum number of connections to be attached as part of the project at level 1136 and “Number of education establishments and health facilities to be connected to the area of intervention” in a quantity of 1.The maximum amount of the project is PLN 3.537.013,00 and the aid intensity is 60 %.As part of the proposed investment, the applicant:The 55,87-km network will be built up, covering the network of 1356 households, and will cover the networks of 1 educational institutions/health services, — create 2 network access points.The project will run for 24 months — from 01.07.2016 to 30.06.2018, the planned work is divided into 7 tasks.Activities 1 and 2 will be carried out before the start of the project and will include:The documentation needed to submit a request for a copy, — the choice of the contractor.In the selection of network technology, the contractor took into consideration: efficiency, — reliability, — scalability and complementarity, — operating costs, functionality and manageability. the factors identified have led to the choice of FTTH as the technology that will be used for the construction of the network in question.The project will be carried out in the ‘projection and demolition’ mode — all design, construction and installation works will be contracted out in the framework of the project collection. in order to ensure that the project is implemented correctly, a “project team” will be set up with a view to monitoring the implementation of the investment in accordance with the harmonogr., to carry out the works, and to account for the project. the design team will be composed of the staff: — Applicant — 4 os.- ARVADO consulting — 1 persons. (English)
    0 references

    Identifiers

    POPC.01.01.00-30-0275/16
    0 references