Construction of the second metro line with the purchase of rolling stock — Stage III (Q86095)

From EU Knowledge Graph
Revision as of 14:50, 22 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the second metro line with the purchase of rolling stock — Stage III
Project in Poland financed by DG Regio

    Statements

    0 references
    1,952,151,513.23 zloty
    0 references
    468,516,363.1752 Euro
    13 January 2020
    0 references
    2,797,470,976.16 zloty
    0 references
    671,393,034.28 Euro
    13 January 2020
    0 references
    69.78 percent
    0 references
    1 January 2015
    0 references
    31 December 2022
    0 references
    MIASTO STOŁECZNE WARSZAWA
    0 references
    0 references
    0 references

    52°14'1.3"N, 21°4'17.0"E
    0 references
    Projekt zlokalizowany jest na terenie m.st. W-wy, woj. mazowieckie w dzielnicach: Wola i Bemowo (odc. zachodni), Targówek (odc. wschodni-północny). Projekt znajduje się na jednym z głównych ciągów komunikacyjnych miasta, łączy centrum ze skupiskami miejsc pracy i osiedlami mieszkaniowymi. Na Projekt składają się: Podprojekt A – rozbudowa II linii metra o 2 stacje w kier. zachodnim i 3 stacje w kier. wschodnim-północnym, Podprojekt B – zakup 17 szt. taboru. W ramach realizacji odcinka zachodniego wykonane zostaną: - 2 stacje: C5 - która będzie usytuowana pod ul. Górczewską w rejonie centrum handlowego, C4, która będzie usytuowana pod ul. Górczewską, w rejonie skrzyżowania z ul. Powstańców Śląskich, w sąsiedztwie Ratusza Dzielnicy Bemowo wraz z torami odstawczymi. - wentylatornia szlakowa: V5. - 2 tunele szlakowe: D6, D5. - komora demontażowa przy torach odstawczych stacji C6. W ramach realizacji odcinka wschodniego-północnego wykonane zostaną: - 3 stacje: C19, która będzie zlokalizowana w centrum osiedla Zacisze, pod ul. Figara, po południowej stronie skrzyżowania z ul. Rolanda, C20, która będzie usytuowana pod ul. Kondratowicza w rejonie skrzyżowania z ul. Malborską, w sąsiedztwie ratusza dzielnicy Targówek, C21, która będzie usytuowana pod ul. Kondratowicza w rejonie skrzyżowania z ul. Rembielińską. - 3 wentylatornie szlakowe: V19, V20, V21. - 3 tunele szlakowe: D19, D20, D21. - komory demontażowe przy budowanych stacjach. Postęp rzeczowy wskaźnika produktu – całkowita długość nowych lub zmodernizowanych linii tramwajowych i linii metra: 2019-2021 – 0 km, 2022 – 6 km. Zakupiony zostanie tabor – 17 szt. do obsługi I i II linii metra (uzupełnienie inwentarza MW oraz wymiana wyeksploatowanego taboru serii 81), części zamienne, stanowiska, narzędzia i oprogramowanie do obsługi, serwisu i diagnostyki pociągów. Postęp rzeczowy wskaźnika produktu pn. liczba zakupionych jednostek taboru pasażerskiego (...): 2017-2021 - 0, 2022-17. (Polish)
    0 references
    The project is located in the metropolitan area of W-wa, Mazowieckie Province in the following districts:The will and Bymowo (Zachodni), Targówek (East-North).The project is one of the city’s main transport lines and connects the centre with job centres and housing.The project consists of:Sub-project A — extension of metro lines by 2 stations in the west and 3 stations in the northern and northern regions, sub-project B — purchase of 17 rolling stock.In the context of the completion of the west stretch, the following shall be carried out:2 stations:C5 — which will be located at ul.Górczewska in the area of the shopping centre, C4, which is to be located at ul.Górczewska, in the intersection area of the ul.Powstańców Śląskie, in the vicinity of the Bymo District of Bemowo, together with the running tracks.— plain line fan:V5.— 2 main tunnels:D6, D5.— the dismantling chamber of the centre tracks of the C6 station.The following will be carried out as part of the implementation of the North and Eastern section:3 stations:C19, which will be located at the centre of the settlements, at ul.Figara, on the south side of the junction with ul.Roland, C20, to be located at ul.Kondratowicz in the intersection area of the ul.Malborska, in the vicinity of the town hall of Targówek, C21, which will be located at ul.Kondratowicz in the intersection area of the ul.Rembilińska.— 3 plain fan fans:V19, V20, V21.— 3 main tunnels:D19, D20, D21.— dismantling chambers of the built stations.Tangible progress of the product indicator — total length of new or improved tram and metro lines:2019-2021-0 km, 2022-6 km.The rolling stock will be purchased — 17 items to handle I and II metro lines (replenishment of MW and replacement of the exploited rolling stock of the 81 series), spare parts, posts, tools and software for the operation, servicing and diagnosis of trains.Tangible progress in the product indicator: the number of units of passenger rolling stock purchased (...):2017-2021-0, 2022-17. (English)
    0 references

    Identifiers

    POIS.06.01.00-00-0048/17
    0 references
    4357