New sections of the Andalusian rail network for mixed traffic. Section Antequera — Granada: Platform Phase III, Supplies, Track Mounting, Electrification and Facilities (Q3177301)

From EU Knowledge Graph
Revision as of 09:45, 11 October 2024 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in pt)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Project Q3177301 in Spain
Language Label Description Also known as
English
New sections of the Andalusian rail network for mixed traffic. Section Antequera — Granada: Platform Phase III, Supplies, Track Mounting, Electrification and Facilities
Project Q3177301 in Spain

    Statements

    0 references
    0 references
    0 references
    171,441,780.0 Euro
    0 references
    214,302,220.0 Euro
    0 references
    80.0000018665229 percent
    0 references
    1 January 2014
    0 references
    31 December 2023
    0 references
    ADIF-ALTA VELOCIDAD
    0 references
    0 references

    37°32'39.37"N, 4°43'39.90"W
    0 references
    Nuevos tramos de la red ferroviaria de Andalucía para tráfico mixto. Tramo Antequera – Granada: Plataforma Fase III, Suministros, Montaje de vía, Electrificación e Instalaciones_x000D_ _x000D_ Las actuaciones se enmarcan dentro de la construcción de la línea de alta velocidad Antequera – Granada. Los contratos que forman parte de la actuación son:_x000D_ 1. EXPROPIACIONES_x000D_ _x000D_ 2. PLATAFORMA:_x000D_ • Renovación de vía y permeabilidad del trazado en Loja (27 Km)_x000D_ • Accesos a Granada Fase I (2,3 Km)_x000D_ • Construcción de plataforma para centro autotransformación 405.4 (0,16 Km)_x000D_ _x000D_ 3. VÍA_x000D_ • Suministros:_x000D_ - Balasto_x000D_ - Traviesas_x000D_ - Carril_x000D_ - Desvíos_x000D_ - Aparatos de dilatación_x000D_ • Montaje de vía Antequera – Loja (56,1 Km)_x000D_ • Montaje de vía Tocón – Granada ( 32,05 Km)_x000D_ _x000D_ 4. LÍNEA AÉREA DE CONTACTO Y ENERGÍA_x000D_ • Línea aérea de contacto (122 Km de vía única más PAETs y estaciones)_x000D_ • Subestaciones eléctricas de tracción y centros de autotransformación_x000D_ • Telemando de energía_x000D_ _x000D_ 5. INSTALACIONES_x000D_ • Instalaciones de protección civil y seguridad en túneles_x000D_ • Instalaciones y telecomunicaciones de la línea_x000D_ • Modificación DAVINCI_x000D_ Igualmente se contemplan todas las asistencias técnicas (para redacción de estudios y proyectos, control de obras, supervisión, calidad, seguridad y salud), así como las reposiciones de servicios afectados necesarias para realizar las actuaciones contempladas en este proyecto. (Spanish)
    0 references
    New sections of Andalucia Rail Network for mixed traffic. Section Antequera-Granada. Track bed works, Phase III, supplies, track assembly, electrical and signalling facilities. (English)
    0.0028275771737731
    0 references
    Nouveaux tronçons du réseau ferroviaire andalou pour le trafic mixte. Section Antequera — Grenade: Plate-forme Phase III, Fournitures, Montage de la voie, Électrification et Installations_x000D_ _x000D_ Les actions sont encadrées dans la construction de la ligne à grande vitesse Antequera — Grenade. Les contrats qui font partie de l’action sont:_x000D_ 1. EXPROPIATIONS_x000D_ _x000D_ 2. Plate-forme:_x000D_ • Renouvellement de la voie et perméabilité de mise en page à Loja (27 Km)_x000D_ • Accès à Grenade Phase I (2.3 Km)_x000D_ • Construction de plate-forme pour le centre d’autotransformation 405.4 (0.16 Km)_x000D_ _x000D_ 3. VÍA_x000D_ • Fournitures:_x000D_ — Balasto_x000D_ — Sleepers_x000D_ — Lane_x000D_ — Detours_x000D_ — Équipements d’extension_x000D_ • Ensemble de voies Antequera — Loja (56, 1 Km)_x000D_ • Montage de la voie Tocón — Grenade (32.05 Km)_x000D_ _x000D_ Air CONTACT AND ENERGY line_x000D_ • Ligne de contact frontale (122 km de voie simple plus paets et stations)_x000D_ • Sous-stations de puissance et centres d’autotransformation_x000D_ • Télécommande de puissance_x000D_ _x000D_ 5. INSTALACIONES_x000D_ • Installations de protection civile et de sécurité dans les tunnels_x000D_ • Installations et télécommunications de la ligne_x000D_ • Modification DAVINCI_x000D_ De même, toute assistance technique (pour la rédaction d’études et de projets, le contrôle des travaux, la supervision, la qualité, la sécurité et la santé) ainsi que le remplacement des services concernés nécessaires à la réalisation des actions envisagées dans ce projet. (French)
    4 December 2021
    0 references
    Neue Abschnitte des andalusischen Schienennetzes für gemischten Verkehr. Abschnitt Antequera – Granada: Plattform Phase III, Lieferungen, Gleismontage, Elektrifizierung und Installationen_x000D_ _x000D_ Die Aktionen sind innerhalb des Baus der Hochgeschwindigkeitsstrecke Antequera – Granada gerahmt. Die Verträge, die Teil der Aktion sind, sind:_x000D_ 1. EXPROPIATIONEN_x000D_ _x000D_ 2. Plattform:_x000D_ • Gleiserneuerung und Layoutdurchlässigkeit in Loja (27 Km)_x000D_ • Zugang zu Granada Phase I (2.3 Km)_x000D_ • Plattformaufbau für Selbsttransformationszentrum 405.4 (0,16 Km)_x000D_ _x000D_ 3. VÍA_x000D_ • Lieferungen:_x000D_ – Balasto_x000D_ – Sleepers_x000D_ – Lane_x000D_ – Detours_x000D_ – Erweiterungsausrüstung_x000D_ • Gleismontage Antequera – Loja (56, 1 Km)_x000D_ • Gleisbau Tocón – Granada (32.05 Km)_x000D_ _x000D_ 4. Air KONTAKT UND ENERGY line_x000D_ • Oberleitung (122 Km Einzelgleise plus Paets und Stationen)_x000D_ • Umspannwerke und Selbsttransformationszentren_x000D_ • Netzfernbedienung_x000D_ _x000D_ 5. INSTALACIONES_x000D_ • Katastrophenschutz- und Sicherheitsanlagen in Tunneln_x000D_ • Installationen und Telekommunikation der Linie_x000D_ • Änderung DAVINCI_x000D_ Ähnlich alle technische Hilfe (für die Erstellung von Studien und Projekten, die Kontrolle der Arbeiten, Überwachung, Qualität, Sicherheit und Gesundheit) sowie die Ersetzung der für die Durchführung der in diesem Projekt vorgesehenen Maßnahmen erforderlichen Dienste. (German)
    9 December 2021
    0 references
    Nieuwe trajecten van het Andalusische spoorwegnet voor gemengd verkeer. Sectie Antequera — Granada: Platform fase III, Supplies, Track Mounting, Electrificatie en Installaties_x000D_ _x000D_ De acties zijn ingekaderd binnen de aanleg van de hogesnelheidslijn Antequera — Granada. De contracten die deel uitmaken van de actie zijn:_x000D_ 1. EXPROPIATIONS_x000D_ _x000D_ 2. Platform:_x000D_ • Spoorvernieuwing en doorlaatbaarheid van de lay-out in Loja (27 Km)_x000D_ • Toegang tot Granada Fase I (2,3 km)_x000D_ • Platformconstructie voor zelftransformatiecentrum 405.4 (0,16 Km)_x000D_ _x000D_ 3. VÍA_x000D_ • Benodigdheden:_x000D_ — Balasto_x000D_ — Sleepers_x000D_ — Lane_x000D_ — Detours_x000D_ — Uitbreidingsapparatuur_x000D_ • Spoormontage Antequera — Loja (56, 1 Km)_x000D_ • Montage van het spoor Tocón — Granada (32.05 Km)_x000D__x000D 4. Lucht CONTACT EN ENERGIE lijn_x000D_ • bovenleiding (122 km enkelspoor plus paets en stations)_x000D_ • Onderstations en zelftransformatiecentra_x000D_ • Vermogen afstandsbediening_x000D_ _x000D_ 5. INSTALACIONES_x000D_ • Civiele beschermings- en veiligheidsinstallaties in tunnels_x000D_ • Installaties en telecommunicatie van de lijn_x000D_ • Wijziging DAVINCI_x000D_ Evenzo alle technische bijstand (voor het opstellen van studies en projecten, controle van werken, toezicht, kwaliteit, veiligheid en gezondheid) en de vervanging van de betrokken diensten die nodig zijn voor de uitvoering van de in dit project beoogde acties. (Dutch)
    17 December 2021
    0 references
    Nuovi tratti della rete ferroviaria andalusa per il traffico misto. Sezione Antequera — Granada: Piattaforma Fase III, Forniture, Montaggio binario, Elettrificazione e Installazioni_x000D_ _x000D_ Le azioni sono inquadrate nella costruzione della linea ad alta velocità Antequera — Granada. I contratti che fanno parte dell'azione sono:_x000D_ 1. EXPROPIATIONS_x000D_ _x000D_ 2. Piattaforma:_x000D_ • Aggiornamento della pista e permeabilità del layout a Loja (27 Km)_x000D_ • Accesso a Granada Fase I (2.3 Km)_x000D_ • Costruzione della piattaforma per centro di autotrasformazione 405.4 (0,16 Km)_x000D_ _x000D_ 3. VÍA_x000D_ • Forniture:_x000D_ — Balasto_x000D_ — Passerelle_x000D_ — Lane_x000D_ — Detours_x000D_ — Attrezzature di espansione_x000D_ • Montaggio binario Antequera — Loja (56, 1 Km)_x000D_ • Montaggio pista Tocón — Granada (32.05 Km)_x000D_ _x000D_ 4. Air CONTACT AND ENERGY line_x000D_ • Linea di contatto aerea (122 Km di binario singolo più paet e stazioni)_x000D_ • Sottostazioni di alimentazione e centri di autotrasformazione_x000D_ • Controllo remoto di alimentazione_x000D_ _x000D_ 5. INSTALACIONES_x000D_ • Impianti di protezione civile e di sicurezza nelle gallerie_x000D_ • Impianti e telecomunicazioni della linea_x000D_ • Modifica DAVINCI_x000D_ Analogamente, tutta l'assistenza tecnica (per l'elaborazione di studi e progetti, il controllo dei lavori, la supervisione, la qualità, la sicurezza e la salute) nonché la sostituzione dei servizi interessati necessari per realizzare le azioni previste nel presente progetto. (Italian)
    16 January 2022
    0 references
    Andaluusia raudteevõrgustiku uued lõigud segaliikluseks. Antequera-Granada sektsioon. Raudteevoodi ehitustööd, III etapp, varustus, rööbastee montaaž, elektri- ja signalisatsiooniseadmed. (Estonian)
    4 August 2022
    0 references
    Naujos Andalūzijos geležinkelių tinklo atkarpos mišriam eismui. Skyrius Antequera-Granada. Bėgių lovų darbai, III etapas, reikmenys, bėgių surinkimas, elektros ir signalizacijos įrenginiai. (Lithuanian)
    4 August 2022
    0 references
    Novi dijelovi željezničke mreže Andalucia za mješoviti promet. Odsjek Antequera-Granada. Radovi na gusjenicama, faza III., potrošni materijal, sklop kolosijeka, električni i signalno-sigurnosni uređaji. (Croatian)
    4 August 2022
    0 references
    Νέα τμήματα του σιδηροδρομικού δικτύου της Ανδαλουσίας για μεικτή κυκλοφορία. Τμήμα Antequera-Granada. Εργασίες κρεβατιών τροχιάς, φάση III, προμήθειες, συναρμολόγηση τροχιάς, ηλεκτρικές εγκαταστάσεις και εγκαταστάσεις σηματοδότησης. (Greek)
    4 August 2022
    0 references
    Nové úseky železničnej siete Andalúzie pre zmiešanú dopravu. Sekcia Antequera-Granada. Traťové práce, fáza III, dodávky, montáž koľaje, elektrické a signalizačné zariadenia. (Slovak)
    4 August 2022
    0 references
    Andalucia Rail Networkin uudet osat sekaliikennettä varten. Osa Antequera-Granada. Ratapenkkityöt, vaihe III, tarvikkeet, radan kokoonpano, sähkö- ja merkinantolaitteet. (Finnish)
    4 August 2022
    0 references
    Nowe odcinki sieci kolejowej Andaluzja dla ruchu mieszanego. Sekcja Antequera-Granada. Prace torowe, faza III, zaopatrzenie, montaż torów, urządzenia elektryczne i sygnalizacyjne. (Polish)
    4 August 2022
    0 references
    Az Andalúzia Vasúthálózat új szakaszai a vegyes forgalom számára. Antequera-Granada részleg. Pályaágyi munkák, III. fázis, kellékek, vágányszerelvény, elektromos és jelzőberendezések. (Hungarian)
    4 August 2022
    0 references
    Nové úseky železniční sítě Andalucia pro smíšenou dopravu. Sekce Antequera-Granada. Práce na kolejích, fáze III, dodávky, montáž kolejí, elektrické a signalizační zařízení. (Czech)
    4 August 2022
    0 references
    Jauni Andalūzijas dzelzceļa tīkla posmi jauktai satiksmei. Nodaļa Antequera-Granada. Sliežu ceļa gultnes darbi, III posms, piederumi, sliežu ceļu montāža, elektriskās un signalizācijas iekārtas. (Latvian)
    4 August 2022
    0 references
    Codanna nua de Líonra Iarnróid Andalucia le haghaidh trácht measctha. Roinn Antequera-Granada. Oibreacha leaba riain, Céim III, soláthairtí, cóimeáil rianta, saoráidí leictreacha agus comharthaíochta. (Irish)
    4 August 2022
    0 references
    Novi odseki železniškega omrežja Andalucia za mešani promet. Oddelek Antequera-Granada. Dela na tirnici, faza III, zaloge, sestavljanje tirov, električne in signalne naprave. (Slovenian)
    4 August 2022
    0 references
    Нови участъци от железопътната мрежа Андалусия за смесен трафик. Отдел Антекера-Гранада. Работи по полагане на коловози, фаза III, консумативи, сглобяване на коловози, електрически и сигнални съоръжения. (Bulgarian)
    4 August 2022
    0 references
    Sezzjonijiet ġodda tan-Netwerk Ferrovjarju ta’ Andalucia għat-traffiku mħallat. Sezzjoni Antequera-Granada. Xogħlijiet fuq is-sodda tal-binarji, Fażi III, provvisti, assemblaġġ tal-binarji, faċilitajiet tal-elettriku u tas-sinjalar. (Maltese)
    4 August 2022
    0 references
    Novos troços da Rede Ferroviária da Andaluzia para tráfego misto. Secção Antequera-Granada. obras no leito da via, fase III, fornecimentos, montagem da via, instalações elétricas e de sinalização. (Portuguese)
    4 August 2022
    0 references
    Nye strækninger af Andalusiens jernbanenet til blandet trafik. Afsnit Antequera-Granada. Baneleje, fase III, forsyninger, spormontering, elektriske og signalanlæg. (Danish)
    4 August 2022
    0 references
    Noi secțiuni ale rețelei feroviare Andalucia pentru traficul mixt. Secțiunea Antequera-Granada. Lucrări de pat de cale ferată, faza III, consumabile, ansamblu de cale ferată, instalații electrice și de semnalizare. (Romanian)
    4 August 2022
    0 references
    Nya sträckor av Andalusiens järnvägsnät för blandad trafik. Sektion Antequera-Granada. Spårbäddsarbeten, fas III, förnödenheter, spårmontering, el- och signalanläggningar. (Swedish)
    4 August 2022
    0 references
    The project will complete the railway link between Antequera and Granada, in southern Spain. (English)
    European Union
    0 references
    Varios Municipios de Andalucía
    0 references
    20 December 2023
    0 references

    Identifiers

    Granada_F3
    0 references
    5188
    0 references
    2017ES16RFMP001
    0 references