Increase in the energy efficiency of a building belonging to the Institute of Horticulture in Skierniewice (Q84532)

From EU Knowledge Graph
Revision as of 14:12, 22 June 2020 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Increase in the energy efficiency of a building belonging to the Institute of Horticulture in Skierniewice
Project in Poland financed by DG Regio

    Statements

    0 references
    1,819,074.51 zloty
    0 references
    436,577.8824 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    24 January 2018
    0 references
    31 December 2020
    0 references
    INSTYTUT OGRODNICTWA
    0 references
    0 references
    Budynek - Gmach Główny Instytutu Ogrodnictwa, którego kompleksowa termomodernizacja jest przedmiotem projektu, zlokalizowany jest w Skierniewicach, województwo łódzkie, powiat skierniewicki, gmina Miasto Skierniewice, przy ul. Pomologicznej 18, na działce nr 629/2, obręb 5. CELE PROJEKTU Celem projektu jest poprawa efektywności energetycznej budynku: Gmach Główny, należącego do Instytutu Ogrodnictwa. Cele szczegółowe: • Komfort termiczny w budynkach • Możliwie najwyższa neutralność środowiskowa budynków • Poprawa stanu środowiska, w tym spadek emisji zanieczyszczenia • Zgodność stanu infrastruktury z obowiązującymi wymogami formalno-prawnymi z zakresu ochrony środowiska Potrzeby/zidentyfikowane braki, którym odpowiadają cele Projektu: • zmniejszenie emisji do atmosfery szkodliwych gazów, w tym CO2, • poprawa komfortu korzystania z budynku przez pracowników • zapewnienie pełnej zgodności stanu infrastruktury z aktualnymi wymogami formalno-prawnymi z zakresu ochrony środowiska naturalnego, Projekt zakłada przeprowadzenie prac, pozwalających na zwiększenie efektywności energetycznej budynku, a tym samym przyczyniających się do zrealizowania wszystkich ww celów. Zostały one podzielone na pięć powiązanych ze sobą zadań: 1. Przygotowanie dokumentacji: dokumentacja techniczna do dofinansowania, studium wykonalności, dokumentacja przetargowa, dokumentacja projektowa, inwentaryzacja przyrodnicza. 2. Roboty budowlane w tym: docieplenie ścian zewnętrznych, stropodachu wentylowanego/niewentylowanego, wymiana ścian murowanych z lukfserów szklanych na fasady oszklone, wymiana drzwi zewn., montaż/modernizacja wentylacji mechanicznej, modernizacja instalacji c.o., modernizacja oświetlenia, montaż instalacji PV. 3. Zarządzanie procesem inwestycyjnym - nadzór inwestorski. 4. Audyt energetyczny ex post. 5. działania informacyjne i promocyjne. Realizacja ww zakresu projektu przyczyni się m.in. do oszczędności energii, zmniejszenia emisji CO2. (Polish)
    0 references
    The building — the Central Garden Institute, whose comprehensive thermal modernisation is the subject of the project, is located in Skierniewice, the Łódzkie region, the district of Skierniewice, the city of Skierniewice, at ul.Pomology 18, on plot No 629/2, area 5.The project aims to improve the energy efficiency of the building:The Central Garden Unit, belonging to the Institute of Horticulture.Specific objectives:• Thermal integration in buildings• The highest environmental neutrality of buildings• Possible environmental neutrality of buildings• Improvement of the state of the environment, including reduction of pollution emissions• Conformity of the condition of the infrastructure with the applicable environmental formal requirements/shortcomings which correspond to the objectives of the project:• reducing atmospheric emissions of harmful gases, including CO2,• improvement of the comfort of the use of the building by staff• ensuring that the status of the infrastructure is fully compatible with the current formal environmental legal requirements, the project is to carry out the work to increase the energy efficiency of the building and thus contribute to the achievement of all objectives.They are divided into five interrelated tasks:1.Preparation of documentation:technical documentation for funding, feasibility study, tender documentation, design documentation, nature inventory.2.Construction work of which:insulation of external walls, ventilated/unventilated walls, replacement of walls of glass from glass to facades, replacement of doors, installation/modernisation of mechanical ventilation, modernisation of the lighting system, modernisation of lighting, installation of PV.3.Investment management — investor supervision.4.Ex-post Energy Audit.5. information and promotion measures.Implementation of the project will contribute, inter alia, to energy savings, CO2 emissions reductions. (English)
    0 references

    Identifiers

    POIS.01.03.01-00-0051/17
    0 references