Thermal modernisation of public utilities in Inowrocław II stage – Primary School No. 8 (Q2699140)
Jump to navigation
Jump to search
Project Q2699140 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of public utilities in Inowrocław II stage – Primary School No. 8 |
Project Q2699140 in Poland |
Statements
2,624,163.23 zloty
0 references
3,087,250.86 zloty
0 references
85.0 percent
0 references
1 April 2020
0 references
31 December 2021
0 references
MIASTO INOWROCŁAW
0 references
Projekt będzie realizowany na terenie miasta Inowrocław.Miasto stanowi ośrodek uzdrowiskowy, turystyczno-rekreacyjny i kulturalny oraz przemysłowy.Istotnym czynnikiem rozwoju są występujące na terenie miasta wody lecznicze, wydobywane od grudnia 2012 r.W mieście zlokalizowany jest zespół uzdrowiskowo-wypoczynkowy położony blisko centrum. Uzdrowisko powstało w związku z występowaniem solanek, wykorzystywanych w leczeniu schorzeń górnych dróg oddechowych, krążenia i innych.Baza sanatoryjna w Inowrocławiu to placówki z szeroką bazą zabiegową i hotelową. W ciągu roku w uzdrowiskowych leczy się i rehabilituje ok. 34 tys. kuracjuszy.Z tego względu miasto powinno spełniać normy jakościowe powietrza dla miejscowości uzdrowiskowych, jednak są przekroczenia poziomów dopuszczalnych (pyłu zawieszonego PM10 i PM2,5) oraz docelowych (w przypadku benzo(α)pirenu w pyle zawieszonym PM10 i ozonu).Należy kontynuować działania mające na celu ograniczanie zanieczyszczeń oraz niskiej emisji.W ramach realizacji projektu zostanie poddany termomodernizacji budynek SP nr 8.Cel gł. zostanie osiągnięty przez realizację robót przyczyniających się do zwiększenia efektywności energetycznej budynku SP 8W ramach projektu zaplanowano działania- ocieplenie ścian zewnętrznych szkoły oraz sali gimnastycznej wraz z pracami towarzyszącymi(wymiana parapetów, rynien, instalacji odgromowej, lamp oświetleniowych na elewacji)- ocieplenie ścian zew. piwnic, stropodachu szkoły,sali gim., stropu nad piwnicą- uzupełnienie pokrycia dachu papą termozgrzewalną oraz remont i malowanie daszków i okapów - wymiana okien w budynku szkoły i sali gimnastycznej- wymiana drzwi- modernizacja instalacji cwu- wymian instalacji co wraz z pracami towarzyszącymi (wymiana drzwi, oświetlenia w pomieszczeniu węzła oraz montaż rozdzielni elektrycznej, skucie i wykonanie nowej posadzki w pomieszczeniu rozdzielacza, demontaż i montaż nowej obudowy na grzejniki, prace rem-odtworzeniowe w pomi. szkoły )- montaż ins. fotowoltaicznej (Polish)
0 references
The project will be implemented in the city of Inowrocław. The city is a spa, tourist, recreation and cultural and industrial center. An important development factor are the healing waters present in the city, which have been extracted since December 2012. In the city there is a spa and recreation complex located close to the center. The spa was established in connection with the presence of brines, used in the treatment of diseases of the upper respiratory tract, circulatory and others. The sanatorium base in Inowrocław is a facility with a wide treatment and hotel base. During the year, the spas are treated and rehabilitated approx. 34 thousand guests. For this reason, the city should meet the air quality standards for spa towns, but there are exceedances of the permissible levels (dust suspended PM10 and PM2.5) and the target (in the case of benzo(α)pyrene in suspended PM10 dust and ozone).The activities to reduce pollution and low emissions should be continued. As part of the project, the project will undergo thermal modernisation of the building SP no. 8. The main objective will be achieved by carrying out works contributing to the energy efficiency of the building in the project. In the framework of the project it is planned to perform activities on the outer walls of the school and the gymnasium with a gymnasium along with the works accompanying the building(s), the installation of the building, the installation of the building, the installation of a new building, the installation of a new building, the installation of a new building, the installation of the building, the installation of the building, the installation of the building and the installation of the building. (English)
7 July 2021
0.9689677227019298
0 references
Le projet sera mis en œuvre dans la ville d’Inowrocław.La ville est un centre thermal, touristique-récréatif et culturel et industriel.Un facteur important de développement sont les eaux médicinales trouvées dans la ville, qui ont été extraites depuis décembre 2012.La ville est située dans un complexe de spa et de loisirs situé à proximité du centre. Le spa a été créé en relation avec la présence de saumure utilisée dans le traitement des maladies des voies respiratoires supérieures, du système circulatoire et d’autres. Au cours de l’année, dans les stations thermales guéries et réhabilitées env. For this reason, the city should meet the air quality standards for spa towns, but exceed the permissible levels (dust suspended PM10 and PM2.5) and target levels (in the case of benzo(α)pyrene in suspended dust PM10 and ozone).Continuous activities should be continued to reduce pollution and low emissions.In the framework of the project, the project will be subject to thermomodernisation of the building SP No 8.The main purpose will be achieved by the installation of works contributing to improving the energy efficiency of the building SP 8In the framework of the project, the renovation of the school’s interiors, the renovation of the school’s walls and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the replacement of the school’s halls, the renovation of the school’s walls and the gymnastics halls, the installation of the building’s ceilings, the facade of the building’s and the facades of the building, the renovation of the school’s walls, the renovation of the building and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the renovation of the school’s house, the renovation of the building and the gym, as well as the installation of the toilets, the installation of the halls of the building, the facilitation of the school’s hall, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the basement of the building’s, the renovation of the school’s bathroom, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s the basement of the building, the renovation of the school, the renovation of the building and the gym, as well as the installation of the building with the roof of the building, the installation of the building, the facade of the school, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s and the facades of the building, the renovation of the school’s-house, as well as the facade of the building, the installation of the building with the roof, the installation of the building’s from the basement, the renovation of the school’s-floor, the renovation of the building and the gym, as well as the installation of the building’s from the roof, the installation of the building’s from the basement, the renovation of the school’s, the renovation of the school’s walls and the gym halls, the installation of the ceilings of the building, the installation of the basement of the building, the renovation of the building’s, the renovation of the school and the gym halls, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s halls, the renovation of the school’s and the gym halls, the installation of the building’s ceilings and the facades of the building, as well as the renovation of the school’s halls, as well as the renovation of the building and the gymnautical halls, the installation of the building with the ceilings, the installation of the building’s and the facades of the building, the renovation of the school, the renovation of the building and the gymnautical halls, the installation of the building with the roof, the installation of the basement and the entrance hall, the renovation of the school’s hall, the toilet and the gym, the installation of the building with the roof, the installation of the basement and the fauvourishment of the building, the renovation of the school’s, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s hall, the bathroom and the gym halls, the installation of the building, the entrance to the building, the facades of the building, the renovation of the school’s halls, the renovation of the school and the gymnautical halls, the installation of the building with the rooftops, the partition of the building, and the target levels (in the case of benzo(α)pyrene-pyrene in the PM10 and ozone-suspended dust pits) should continue to (French)
4 December 2021
0 references
Das Projekt wird in der Stadt Inowrocław durchgeführt.Die Stadt ist ein Kurort, Erholungs- und Kultur- und Industriezentrum.Ein bedeutender Entwicklungsfaktor sind medizinische Gewässer in der Stadt, die seit Dezember 2012 extrahiert werden.Die Stadt befindet sich in einem Kur- und Erholungskomplex in der Nähe des Zentrums. Das Kurbad wurde im Zusammenhang mit dem Auftreten von Sole geschaffen, die bei der Behandlung von Erkrankungen der oberen Atemwege, des Kreislaufsystems und anderer verwendet wird.Die Sanatoriumsbasis in Inowrocław ist eine Einrichtung mit einer breiten Behandlungs- und Hotelbasis. Im Laufe des Jahres, in den Kurorten geheilt und saniert ca. For this reason, the city should meet the air quality standards for spa towns, but exceed the permissible levels (dust suspended PM10 and PM2.5) and target levels (in the case of benzo(α)pyrene in suspended dust PM10 and ozone).Continuous activities should be continued to reduce pollution and low emissions.In the framework of the project, the project will be subject to thermomodernisation of the building SP No 8.The main purpose will be achieved by the installation of works contributing to improving the energy efficiency of the building SP 8In the framework of the project, the renovation of the school’s interiors, the renovation of the school’s walls and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the replacement of the school’s halls, the renovation of the school’s walls and the gymnastics halls, the installation of the building’s ceilings, the facade of the building’s and the facades of the building, the renovation of the school’s walls, the renovation of the building and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the renovation of the school’s house, the renovation of the building and the gym, as well as the installation of the toilets, the installation of the halls of the building, the facilitation of the school’s hall, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the basement of the building’s, the renovation of the school’s bathroom, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s the basement of the building, the renovation of the school, the renovation of the building and the gym, as well as the installation of the building with the roof of the building, the installation of the building, the facade of the school, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s and the facades of the building, the renovation of the school’s-house, as well as the facade of the building, the installation of the building with the roof, the installation of the building’s from the basement, the renovation of the school’s-floor, the renovation of the building and the gym, as well as the installation of the building’s from the roof, the installation of the building’s from the basement, the renovation of the school’s, the renovation of the school’s walls and the gym halls, the installation of the ceilings of the building, the installation of the basement of the building, the renovation of the building’s, the renovation of the school and the gym halls, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s halls, the renovation of the school’s and the gym halls, the installation of the building’s ceilings and the facades of the building, as well as the renovation of the school’s halls, as well as the renovation of the building and the gymnautical halls, the installation of the building with the ceilings, the installation of the building’s and the facades of the building, the renovation of the school, the renovation of the building and the gymnautical halls, the installation of the building with the roof, the installation of the basement and the entrance hall, the renovation of the school’s hall, the toilet and the gym, the installation of the building with the roof, the installation of the basement and the fauvourishment of the building, the renovation of the school’s, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s hall, the bathroom and the gym halls, the installation of the building, the entrance to the building, the facades of the building, the renovation of the school’s halls, the renovation of the school and the gymnautical halls, the installation of the building with the rooftops, the partition of the building, and the target levels (in the case of benzo(α)pyrene-pyrene in the PM10 and ozone-suspended dust pits) should continue to (German)
14 December 2021
0 references
Het project zal worden uitgevoerd in de stad Inowrocław.De stad is een kuuroord, toeristische-recreatieve en culturele en industriële centrum.Een belangrijke factor van ontwikkeling zijn geneeskrachtige wateren gevonden in de stad, die zijn gewonnen sinds december 2012.De stad is gelegen in een spa en recreatie complex gelegen dicht bij het centrum. De spa werd gecreëerd in verband met het optreden van pekel gebruikt bij de behandeling van ziekten van de bovenste luchtwegen, bloedsomloop en anderen.De sanatorium basis in Inowrocław is een faciliteit met een brede behandeling en hotel basis. Gedurende het jaar, in de kuuroorden genezen en gerehabiliteerd ca. For this reason, the city should meet the air quality standards for spa towns, but exceed the permissible levels (dust suspended PM10 and PM2.5) and target levels (in the case of benzo(α)pyrene in suspended dust PM10 and ozone).Continuous activities should be continued to reduce pollution and low emissions.In the framework of the project, the project will be subject to thermomodernisation of the building SP No 8.The main purpose will be achieved by the installation of works contributing to improving the energy efficiency of the building SP 8In the framework of the project, the renovation of the school’s interiors, the renovation of the school’s walls and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the replacement of the school’s halls, the renovation of the school’s walls and the gymnastics halls, the installation of the building’s ceilings, the facade of the building’s and the facades of the building, the renovation of the school’s walls, the renovation of the building and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the renovation of the school’s house, the renovation of the building and the gym, as well as the installation of the toilets, the installation of the halls of the building, the facilitation of the school’s hall, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the basement of the building’s, the renovation of the school’s bathroom, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s the basement of the building, the renovation of the school, the renovation of the building and the gym, as well as the installation of the building with the roof of the building, the installation of the building, the facade of the school, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s and the facades of the building, the renovation of the school’s-house, as well as the facade of the building, the installation of the building with the roof, the installation of the building’s from the basement, the renovation of the school’s-floor, the renovation of the building and the gym, as well as the installation of the building’s from the roof, the installation of the building’s from the basement, the renovation of the school’s, the renovation of the school’s walls and the gym halls, the installation of the ceilings of the building, the installation of the basement of the building, the renovation of the building’s, the renovation of the school and the gym halls, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s halls, the renovation of the school’s and the gym halls, the installation of the building’s ceilings and the facades of the building, as well as the renovation of the school’s halls, as well as the renovation of the building and the gymnautical halls, the installation of the building with the ceilings, the installation of the building’s and the facades of the building, the renovation of the school, the renovation of the building and the gymnautical halls, the installation of the building with the roof, the installation of the basement and the entrance hall, the renovation of the school’s hall, the toilet and the gym, the installation of the building with the roof, the installation of the basement and the fauvourishment of the building, the renovation of the school’s, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s hall, the bathroom and the gym halls, the installation of the building, the entrance to the building, the facades of the building, the renovation of the school’s halls, the renovation of the school and the gymnautical halls, the installation of the building with the rooftops, the partition of the building, and the target levels (in the case of benzo(α)pyrene-pyrene in the PM10 and ozone-suspended dust pits) should continue to (Dutch)
18 December 2021
0 references
Il progetto sarà realizzato nella città di Inowrocław.La città è un centro termale, turistico-ricreativo e culturale e industriale.Un fattore significativo di sviluppo sono le acque medicinali presenti nella città, che sono state estratte dal dicembre 2012.La città si trova in un complesso termale e ricreativo situato vicino al centro. Il centro termale è stato creato in connessione con l'insorgenza di salamoia utilizzata nel trattamento di malattie delle vie respiratorie superiori, sistema circolatorio e altri.La base di sanatorio a Inowrocław è una struttura con un ampio trattamento e base alberghiera. Durante l'anno, nei resort termali guarito e riabilitato ca. For this reason, the city should meet the air quality standards for spa towns, but exceed the permissible levels (dust suspended PM10 and PM2.5) and target levels (in the case of benzo(α)pyrene in suspended dust PM10 and ozone).Continuous activities should be continued to reduce pollution and low emissions.In the framework of the project, the project will be subject to thermomodernisation of the building SP No 8.The main purpose will be achieved by the installation of works contributing to improving the energy efficiency of the building SP 8In the framework of the project, the renovation of the school’s interiors, the renovation of the school’s walls and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the replacement of the school’s halls, the renovation of the school’s walls and the gymnastics halls, the installation of the building’s ceilings, the facade of the building’s and the facades of the building, the renovation of the school’s walls, the renovation of the building and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the renovation of the school’s house, the renovation of the building and the gym, as well as the installation of the toilets, the installation of the halls of the building, the facilitation of the school’s hall, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the basement of the building’s, the renovation of the school’s bathroom, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s the basement of the building, the renovation of the school, the renovation of the building and the gym, as well as the installation of the building with the roof of the building, the installation of the building, the facade of the school, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s and the facades of the building, the renovation of the school’s-house, as well as the facade of the building, the installation of the building with the roof, the installation of the building’s from the basement, the renovation of the school’s-floor, the renovation of the building and the gym, as well as the installation of the building’s from the roof, the installation of the building’s from the basement, the renovation of the school’s, the renovation of the school’s walls and the gym halls, the installation of the ceilings of the building, the installation of the basement of the building, the renovation of the building’s, the renovation of the school and the gym halls, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s halls, the renovation of the school’s and the gym halls, the installation of the building’s ceilings and the facades of the building, as well as the renovation of the school’s halls, as well as the renovation of the building and the gymnautical halls, the installation of the building with the ceilings, the installation of the building’s and the facades of the building, the renovation of the school, the renovation of the building and the gymnautical halls, the installation of the building with the roof, the installation of the basement and the entrance hall, the renovation of the school’s hall, the toilet and the gym, the installation of the building with the roof, the installation of the basement and the fauvourishment of the building, the renovation of the school’s, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s hall, the bathroom and the gym halls, the installation of the building, the entrance to the building, the facades of the building, the renovation of the school’s halls, the renovation of the school and the gymnautical halls, the installation of the building with the rooftops, the partition of the building, and the target levels (in the case of benzo(α)pyrene-pyrene in the PM10 and ozone-suspended dust pits) should continue to (Italian)
15 January 2022
0 references
El proyecto se implementará en la ciudad de Inowrocław.La ciudad es un balneario, centro turístico-recreativo y cultural e industrial.Un factor importante de desarrollo son las aguas medicinales que se encuentran en la ciudad, que se han extraído desde diciembre de 2012. La ciudad se encuentra en un complejo de spa y recreación ubicado cerca del centro. El spa fue creado en relación con la aparición de salmuera utilizada en el tratamiento de enfermedades del tracto respiratorio superior, sistema circulatorio y otros.La base del sanatorio en Inowrocław es una instalación con un amplio tratamiento y base hotelera. Durante el año, en los balnearios se curaron y rehabilitaron aprox. For this reason, the city should meet the air quality standards for spa towns, but exceed the permissible levels (dust suspended PM10 and PM2.5) and target levels (in the case of benzo(α)pyrene in suspended dust PM10 and ozone).Continuous activities should be continued to reduce pollution and low emissions.In the framework of the project, the project will be subject to thermomodernisation of the building SP No 8.The main purpose will be achieved by the installation of works contributing to improving the energy efficiency of the building SP 8In the framework of the project, the renovation of the school’s interiors, the renovation of the school’s walls and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the replacement of the school’s halls, the renovation of the school’s walls and the gymnastics halls, the installation of the building’s ceilings, the facade of the building’s and the facades of the building, the renovation of the school’s walls, the renovation of the building and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the renovation of the school’s house, the renovation of the building and the gym, as well as the installation of the toilets, the installation of the halls of the building, the facilitation of the school’s hall, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the basement of the building’s, the renovation of the school’s bathroom, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s the basement of the building, the renovation of the school, the renovation of the building and the gym, as well as the installation of the building with the roof of the building, the installation of the building, the facade of the school, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s and the facades of the building, the renovation of the school’s-house, as well as the facade of the building, the installation of the building with the roof, the installation of the building’s from the basement, the renovation of the school’s-floor, the renovation of the building and the gym, as well as the installation of the building’s from the roof, the installation of the building’s from the basement, the renovation of the school’s, the renovation of the school’s walls and the gym halls, the installation of the ceilings of the building, the installation of the basement of the building, the renovation of the building’s, the renovation of the school and the gym halls, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s halls, the renovation of the school’s and the gym halls, the installation of the building’s ceilings and the facades of the building, as well as the renovation of the school’s halls, as well as the renovation of the building and the gymnautical halls, the installation of the building with the ceilings, the installation of the building’s and the facades of the building, the renovation of the school, the renovation of the building and the gymnautical halls, the installation of the building with the roof, the installation of the basement and the entrance hall, the renovation of the school’s hall, the toilet and the gym, the installation of the building with the roof, the installation of the basement and the fauvourishment of the building, the renovation of the school’s, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s hall, the bathroom and the gym halls, the installation of the building, the entrance to the building, the facades of the building, the renovation of the school’s halls, the renovation of the school and the gymnautical halls, the installation of the building with the rooftops, the partition of the building, and the target levels (in the case of benzo(α)pyrene-pyrene in the PM10 and ozone-suspended dust pits) should continue to (Spanish)
19 January 2022
0 references
Projektet vil blive gennemført i byen Inowrocław.Byen er en spa, turist-rekreativ og kulturel og industriel centrum.En væsentlig faktor for udvikling er medicinske farvande findes i byen, som er blevet udvundet siden december 2012. Byen er beliggende i en spa og rekreativt kompleks beliggende tæt på centrum. Spaen blev skabt i forbindelse med forekomsten af saltlage, der anvendes til behandling af sygdomme i de øvre luftveje, kredsløbssystemet og andre.Sanatorium basen i Inowrocław er en facilitet med en bred behandling og hotel base. I løbet af året, i spa resorts helbredt og rehabiliteret ca. For this reason, the city should meet the air quality standards for spa towns, but exceed the permissible levels (dust suspended PM10 and PM2.5) and target levels (in the case of benzo(α)pyrene in suspended dust PM10 and ozone).Continuous activities should be continued to reduce pollution and low emissions.In the framework of the project, the project will be subject to thermomodernisation of the building SP No 8.The main purpose will be achieved by the installation of works contributing to improving the energy efficiency of the building SP 8In the framework of the project, the renovation of the school’s interiors, the renovation of the school’s walls and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the replacement of the school’s halls, the renovation of the school’s walls and the gymnastics halls, the installation of the building’s ceilings, the facade of the building’s and the facades of the building, the renovation of the school’s walls, the renovation of the building and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the renovation of the school’s house, the renovation of the building and the gym, as well as the installation of the toilets, the installation of the halls of the building, the facilitation of the school’s hall, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the basement of the building’s, the renovation of the school’s bathroom, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s the basement of the building, the renovation of the school, the renovation of the building and the gym, as well as the installation of the building with the roof of the building, the installation of the building, the facade of the school, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s and the facades of the building, the renovation of the school’s-house, as well as the facade of the building, the installation of the building with the roof, the installation of the building’s from the basement, the renovation of the school’s-floor, the renovation of the building and the gym, as well as the installation of the building’s from the roof, the installation of the building’s from the basement, the renovation of the school’s, the renovation of the school’s walls and the gym halls, the installation of the ceilings of the building, the installation of the basement of the building, the renovation of the building’s, the renovation of the school and the gym halls, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s halls, the renovation of the school’s and the gym halls, the installation of the building’s ceilings and the facades of the building, as well as the renovation of the school’s halls, as well as the renovation of the building and the gymnautical halls, the installation of the building with the ceilings, the installation of the building’s and the facades of the building, the renovation of the school, the renovation of the building and the gymnautical halls, the installation of the building with the roof, the installation of the basement and the entrance hall, the renovation of the school’s hall, the toilet and the gym, the installation of the building with the roof, the installation of the basement and the fauvourishment of the building, the renovation of the school’s, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s hall, the bathroom and the gym halls, the installation of the building, the entrance to the building, the facades of the building, the renovation of the school’s halls, the renovation of the school and the gymnautical halls, the installation of the building with the rooftops, the partition of the building, and the target levels (in the case of benzo(α)pyrene-pyrene in the PM10 and ozone-suspended dust pits) should continue to (Danish)
10 July 2022
0 references
Το έργο θα υλοποιηθεί στην πόλη του Inowrocław.Η πόλη είναι ένα σπα, τουριστικό-ψυχαγωγικό και πολιτιστικό και βιομηχανικό κέντρο.Ένας σημαντικός παράγοντας ανάπτυξης είναι τα ιατρικά νερά που βρίσκονται στην πόλη, τα οποία έχουν εξαχθεί από τον Δεκέμβριο του 2012. Η πόλη βρίσκεται σε ένα συγκρότημα σπα και αναψυχής που βρίσκεται κοντά στο κέντρο. Το σπα δημιουργήθηκε σε σχέση με την εμφάνιση άλμης που χρησιμοποιείται στη θεραπεία ασθενειών της ανώτερης αναπνευστικής οδού, του κυκλοφορικού συστήματος και άλλων.Η βάση σανατόριου στο Inowrocław είναι μια εγκατάσταση με ευρεία θεραπεία και ξενοδοχειακή βάση. Κατά τη διάρκεια του έτους, στα κέντρα σπα θεραπεύτηκαν και αποκαταστάθηκαν περίπου. For this reason, the city should meet the air quality standards for spa towns, but exceed the permissible levels (dust suspended PM10 and PM2.5) and target levels (in the case of benzo(α)pyrene in suspended dust PM10 and ozone).Continuous activities should be continued to reduce pollution and low emissions.In the framework of the project, the project will be subject to thermomodernisation of the building SP No 8.The main purpose will be achieved by the installation of works contributing to improving the energy efficiency of the building SP 8In the framework of the project, the renovation of the school’s interiors, the renovation of the school’s walls and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the replacement of the school’s halls, the renovation of the school’s walls and the gymnastics halls, the installation of the building’s ceilings, the facade of the building’s and the facades of the building, the renovation of the school’s walls, the renovation of the building and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the renovation of the school’s house, the renovation of the building and the gym, as well as the installation of the toilets, the installation of the halls of the building, the facilitation of the school’s hall, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the basement of the building’s, the renovation of the school’s bathroom, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s the basement of the building, the renovation of the school, the renovation of the building and the gym, as well as the installation of the building with the roof of the building, the installation of the building, the facade of the school, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s and the facades of the building, the renovation of the school’s-house, as well as the facade of the building, the installation of the building with the roof, the installation of the building’s from the basement, the renovation of the school’s-floor, the renovation of the building and the gym, as well as the installation of the building’s from the roof, the installation of the building’s from the basement, the renovation of the school’s, the renovation of the school’s walls and the gym halls, the installation of the ceilings of the building, the installation of the basement of the building, the renovation of the building’s, the renovation of the school and the gym halls, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s halls, the renovation of the school’s and the gym halls, the installation of the building’s ceilings and the facades of the building, as well as the renovation of the school’s halls, as well as the renovation of the building and the gymnautical halls, the installation of the building with the ceilings, the installation of the building’s and the facades of the building, the renovation of the school, the renovation of the building and the gymnautical halls, the installation of the building with the roof, the installation of the basement and the entrance hall, the renovation of the school’s hall, the toilet and the gym, the installation of the building with the roof, the installation of the basement and the fauvourishment of the building, the renovation of the school’s, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s hall, the bathroom and the gym halls, the installation of the building, the entrance to the building, the facades of the building, the renovation of the school’s halls, the renovation of the school and the gymnautical halls, the installation of the building with the rooftops, the partition of the building, and the target levels (in the case of benzo(α)pyrene-pyrene in the PM10 and ozone-suspended dust pits) should continue to (Greek)
10 July 2022
0 references
Projekt će se provoditi u gradu Inowrocław.Grad je lječilište, turističko-rekreativno i kulturno i industrijsko središte.Značajan čimbenik razvoja su ljekovite vode koje se nalaze u gradu, koje su ekstrahirane od prosinca 2012. Grad se nalazi u spa i rekreacijskom kompleksu smještenom u neposrednoj blizini centra. Lječilište je stvoreno u vezi s pojavom salamure koja se koristi u liječenju bolesti gornjih dišnih puteva, krvožilnog sustava i drugih.Sanatorij baza u Inowrocław je objekt sa širokim tretmanom i hotelskom bazom. Tijekom godine, u lječilištima izliječena i rehabilitirana cca. For this reason, the city should meet the air quality standards for spa towns, but exceed the permissible levels (dust suspended PM10 and PM2.5) and target levels (in the case of benzo(α)pyrene in suspended dust PM10 and ozone).Continuous activities should be continued to reduce pollution and low emissions.In the framework of the project, the project will be subject to thermomodernisation of the building SP No 8.The main purpose will be achieved by the installation of works contributing to improving the energy efficiency of the building SP 8In the framework of the project, the renovation of the school’s interiors, the renovation of the school’s walls and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the replacement of the school’s halls, the renovation of the school’s walls and the gymnastics halls, the installation of the building’s ceilings, the facade of the building’s and the facades of the building, the renovation of the school’s walls, the renovation of the building and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the renovation of the school’s house, the renovation of the building and the gym, as well as the installation of the toilets, the installation of the halls of the building, the facilitation of the school’s hall, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the basement of the building’s, the renovation of the school’s bathroom, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s the basement of the building, the renovation of the school, the renovation of the building and the gym, as well as the installation of the building with the roof of the building, the installation of the building, the facade of the school, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s and the facades of the building, the renovation of the school’s-house, as well as the facade of the building, the installation of the building with the roof, the installation of the building’s from the basement, the renovation of the school’s-floor, the renovation of the building and the gym, as well as the installation of the building’s from the roof, the installation of the building’s from the basement, the renovation of the school’s, the renovation of the school’s walls and the gym halls, the installation of the ceilings of the building, the installation of the basement of the building, the renovation of the building’s, the renovation of the school and the gym halls, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s halls, the renovation of the school’s and the gym halls, the installation of the building’s ceilings and the facades of the building, as well as the renovation of the school’s halls, as well as the renovation of the building and the gymnautical halls, the installation of the building with the ceilings, the installation of the building’s and the facades of the building, the renovation of the school, the renovation of the building and the gymnautical halls, the installation of the building with the roof, the installation of the basement and the entrance hall, the renovation of the school’s hall, the toilet and the gym, the installation of the building with the roof, the installation of the basement and the fauvourishment of the building, the renovation of the school’s, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s hall, the bathroom and the gym halls, the installation of the building, the entrance to the building, the facades of the building, the renovation of the school’s halls, the renovation of the school and the gymnautical halls, the installation of the building with the rooftops, the partition of the building, and the target levels (in the case of benzo(α)pyrene-pyrene in the PM10 and ozone-suspended dust pits) should continue to (Croatian)
10 July 2022
0 references
Proiectul va fi implementat în orașul Inowrocław.Orașul este un centru spa, turistic-recreativ și cultural și industrial.Un factor semnificativ de dezvoltare sunt apele medicinale găsite în oraș, care au fost extrase din decembrie 2012. Orașul este situat într-un complex spa și de recreere situat aproape de centru. Spa-ul a fost creat în legătură cu apariția saramurii utilizate în tratamentul bolilor tractului respirator superior, sistemului circulator și altele.Baza sanatoriului din Inowrocław este o facilitate cu un tratament larg și o bază de hotel. Pe parcursul anului, în stațiunile balneare s-au vindecat și s-au reabilitat aprox. For this reason, the city should meet the air quality standards for spa towns, but exceed the permissible levels (dust suspended PM10 and PM2.5) and target levels (in the case of benzo(α)pyrene in suspended dust PM10 and ozone).Continuous activities should be continued to reduce pollution and low emissions.In the framework of the project, the project will be subject to thermomodernisation of the building SP No 8.The main purpose will be achieved by the installation of works contributing to improving the energy efficiency of the building SP 8In the framework of the project, the renovation of the school’s interiors, the renovation of the school’s walls and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the replacement of the school’s halls, the renovation of the school’s walls and the gymnastics halls, the installation of the building’s ceilings, the facade of the building’s and the facades of the building, the renovation of the school’s walls, the renovation of the building and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the renovation of the school’s house, the renovation of the building and the gym, as well as the installation of the toilets, the installation of the halls of the building, the facilitation of the school’s hall, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the basement of the building’s, the renovation of the school’s bathroom, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s the basement of the building, the renovation of the school, the renovation of the building and the gym, as well as the installation of the building with the roof of the building, the installation of the building, the facade of the school, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s and the facades of the building, the renovation of the school’s-house, as well as the facade of the building, the installation of the building with the roof, the installation of the building’s from the basement, the renovation of the school’s-floor, the renovation of the building and the gym, as well as the installation of the building’s from the roof, the installation of the building’s from the basement, the renovation of the school’s, the renovation of the school’s walls and the gym halls, the installation of the ceilings of the building, the installation of the basement of the building, the renovation of the building’s, the renovation of the school and the gym halls, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s halls, the renovation of the school’s and the gym halls, the installation of the building’s ceilings and the facades of the building, as well as the renovation of the school’s halls, as well as the renovation of the building and the gymnautical halls, the installation of the building with the ceilings, the installation of the building’s and the facades of the building, the renovation of the school, the renovation of the building and the gymnautical halls, the installation of the building with the roof, the installation of the basement and the entrance hall, the renovation of the school’s hall, the toilet and the gym, the installation of the building with the roof, the installation of the basement and the fauvourishment of the building, the renovation of the school’s, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s hall, the bathroom and the gym halls, the installation of the building, the entrance to the building, the facades of the building, the renovation of the school’s halls, the renovation of the school and the gymnautical halls, the installation of the building with the rooftops, the partition of the building, and the target levels (in the case of benzo(α)pyrene-pyrene in the PM10 and ozone-suspended dust pits) should continue to (Romanian)
10 July 2022
0 references
Projekt bude realizovaný v meste Inowrocław.Mesto je kúpeľné, turistické-rekreačné a kultúrne a priemyselné centrum.Hlavným faktorom rozvoja sú liečivé vody nachádzajúce sa v meste, ktoré boli extrahované od decembra 2012.Mesto sa nachádza v kúpeľnom a rekreačnom komplexe, ktorý sa nachádza v blízkosti centra. Kúpele boli vytvorené v súvislosti s výskytom soľného roztoku používaného pri liečbe ochorení horných dýchacích ciest, obehového systému a ďalších.Základňa sanatória v Inowrocław je zariadenie so širokou liečbou a hotelovou základňou. Počas roka sa v kúpeľných strediskách uzdravili a rehabilitovali cca. For this reason, the city should meet the air quality standards for spa towns, but exceed the permissible levels (dust suspended PM10 and PM2.5) and target levels (in the case of benzo(α)pyrene in suspended dust PM10 and ozone).Continuous activities should be continued to reduce pollution and low emissions.In the framework of the project, the project will be subject to thermomodernisation of the building SP No 8.The main purpose will be achieved by the installation of works contributing to improving the energy efficiency of the building SP 8In the framework of the project, the renovation of the school’s interiors, the renovation of the school’s walls and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the replacement of the school’s halls, the renovation of the school’s walls and the gymnastics halls, the installation of the building’s ceilings, the facade of the building’s and the facades of the building, the renovation of the school’s walls, the renovation of the building and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the renovation of the school’s house, the renovation of the building and the gym, as well as the installation of the toilets, the installation of the halls of the building, the facilitation of the school’s hall, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the basement of the building’s, the renovation of the school’s bathroom, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s the basement of the building, the renovation of the school, the renovation of the building and the gym, as well as the installation of the building with the roof of the building, the installation of the building, the facade of the school, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s and the facades of the building, the renovation of the school’s-house, as well as the facade of the building, the installation of the building with the roof, the installation of the building’s from the basement, the renovation of the school’s-floor, the renovation of the building and the gym, as well as the installation of the building’s from the roof, the installation of the building’s from the basement, the renovation of the school’s, the renovation of the school’s walls and the gym halls, the installation of the ceilings of the building, the installation of the basement of the building, the renovation of the building’s, the renovation of the school and the gym halls, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s halls, the renovation of the school’s and the gym halls, the installation of the building’s ceilings and the facades of the building, as well as the renovation of the school’s halls, as well as the renovation of the building and the gymnautical halls, the installation of the building with the ceilings, the installation of the building’s and the facades of the building, the renovation of the school, the renovation of the building and the gymnautical halls, the installation of the building with the roof, the installation of the basement and the entrance hall, the renovation of the school’s hall, the toilet and the gym, the installation of the building with the roof, the installation of the basement and the fauvourishment of the building, the renovation of the school’s, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s hall, the bathroom and the gym halls, the installation of the building, the entrance to the building, the facades of the building, the renovation of the school’s halls, the renovation of the school and the gymnautical halls, the installation of the building with the rooftops, the partition of the building, and the target levels (in the case of benzo(α)pyrene-pyrene in the PM10 and ozone-suspended dust pits) should continue to (Slovak)
10 July 2022
0 references
Il-proġett se jiġi implimentat fil-belt ta ‘Inowrocław.Il-belt hija spa, ċentru turistiku-rikreazzjoni u kulturali u industrijali.A fattur sinifikanti ta ‘żvilupp huma ilmijiet mediċinali misjuba fil-belt, li ġew estratti minn Diċembru 2012.Il-belt tinsab fi spa u rikreazzjoni kumpless li jinsab qrib iċ-ċentru. L-ispa nħolqot b’rabta mal-okkorrenza ta’ salmura użata fit-trattament ta’ mard tal-passaġġ respiratorju ta’ fuq, tas-sistema ċirkolatorja u ta’ oħrajn. Matul is-sena, fil-resorts spa fieqet u riabilitati madwar. For this reason, the city should meet the air quality standards for spa towns, but exceed the permissible levels (dust suspended PM10 and PM2.5) and target levels (in the case of benzo(α)pyrene in suspended dust PM10 and ozone).Continuous activities should be continued to reduce pollution and low emissions.In the framework of the project, the project will be subject to thermomodernisation of the building SP No 8.The main purpose will be achieved by the installation of works contributing to improving the energy efficiency of the building SP 8In the framework of the project, the renovation of the school’s interiors, the renovation of the school’s walls and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the replacement of the school’s halls, the renovation of the school’s walls and the gymnastics halls, the installation of the building’s ceilings, the facade of the building’s and the facades of the building, the renovation of the school’s walls, the renovation of the building and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the renovation of the school’s house, the renovation of the building and the gym, as well as the installation of the toilets, the installation of the halls of the building, the facilitation of the school’s hall, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the basement of the building’s, the renovation of the school’s bathroom, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s the basement of the building, the renovation of the school, the renovation of the building and the gym, as well as the installation of the building with the roof of the building, the installation of the building, the facade of the school, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s and the facades of the building, the renovation of the school’s-house, as well as the facade of the building, the installation of the building with the roof, the installation of the building’s from the basement, the renovation of the school’s-floor, the renovation of the building and the gym, as well as the installation of the building’s from the roof, the installation of the building’s from the basement, the renovation of the school’s, the renovation of the school’s walls and the gym halls, the installation of the ceilings of the building, the installation of the basement of the building, the renovation of the building’s, the renovation of the school and the gym halls, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s halls, the renovation of the school’s and the gym halls, the installation of the building’s ceilings and the facades of the building, as well as the renovation of the school’s halls, as well as the renovation of the building and the gymnautical halls, the installation of the building with the ceilings, the installation of the building’s and the facades of the building, the renovation of the school, the renovation of the building and the gymnautical halls, the installation of the building with the roof, the installation of the basement and the entrance hall, the renovation of the school’s hall, the toilet and the gym, the installation of the building with the roof, the installation of the basement and the fauvourishment of the building, the renovation of the school’s, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s hall, the bathroom and the gym halls, the installation of the building, the entrance to the building, the facades of the building, the renovation of the school’s halls, the renovation of the school and the gymnautical halls, the installation of the building with the rooftops, the partition of the building, and the target levels (in the case of benzo(α)pyrene-pyrene in the PM10 and ozone-suspended dust pits) should continue to (Maltese)
10 July 2022
0 references
O projeto será executado na cidade de Inowrocław. A cidade é um spa, centro turístico, recreativo e cultural e industrial. Um importante fator de desenvolvimento são as águas curativas presentes na cidade, que têm sido extraídas desde dezembro de 2012. Na cidade há um spa e complexo de recreação localizado perto do centro. O spa foi estabelecido em relação à presença de salmouras, utilizadas no tratamento de doenças do trato respiratório superior, circulatório e outros. A base do sanatório em Inowrocław é uma instalação com uma ampla base de tratamento e hotel. Durante o ano, os spas são tratados e reabilitados aprox. 34 mil hóspedes. Por este motivo, a cidade deve cumprir as normas de qualidade do ar para as cidades termais, mas existem excedências dos níveis admissíveis (poeiras em suspensão PM10 e PM2,5) e do objetivo (no caso do benzo(α)pireno em poeiras e ozono PM10 em suspensão). As atividades destinadas a reduzir a poluição e as baixas emissões devem ser prosseguidas. No âmbito do projeto, o projeto será objeto de modernização térmica do edifício SP n.o 8. O principal objetivo será alcançado através da realização de obras que contribuam para a eficiência energética do edifício no projeto. No âmbito do projeto, está prevista a realização de atividades nas paredes exteriores da escola e do ginásio com um ginásio, juntamente com as obras que acompanham o(s) edifício(s), a instalação do edifício, a instalação do edifício, a instalação de um novo edifício, a instalação de um novo edifício, a instalação de um novo edifício, a instalação do edifício, a instalação do edifício, a instalação do edifício, a instalação do edifício e a instalação do edifício. (Portuguese)
10 July 2022
0 references
Hanke toteutetaan kaupungissa Inowrocław.Kaupunki on spa, turisti-recreational ja kulttuurinen ja teollinen keskus.Tärkeä tekijä kehitystä ovat lääkevesiä löytyy kaupungista, joka on louhittu joulukuusta 2012.Kaupunki sijaitsee spa ja virkistys monimutkainen sijaitsee lähellä keskustaa. Kylpylä luotiin ylempien hengitysteiden, verenkiertoelinten ja muiden sairauksien hoitoon käytettävän suolaveden esiintymisen yhteydessä.Inowrocławin parantolapohja on laajahoito- ja hotellipohja. Vuoden aikana kylpyläkeskuksissa parannettiin ja kunnostettiin noin. For this reason, the city should meet the air quality standards for spa towns, but exceed the permissible levels (dust suspended PM10 and PM2.5) and target levels (in the case of benzo(α)pyrene in suspended dust PM10 and ozone).Continuous activities should be continued to reduce pollution and low emissions.In the framework of the project, the project will be subject to thermomodernisation of the building SP No 8.The main purpose will be achieved by the installation of works contributing to improving the energy efficiency of the building SP 8In the framework of the project, the renovation of the school’s interiors, the renovation of the school’s walls and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the replacement of the school’s halls, the renovation of the school’s walls and the gymnastics halls, the installation of the building’s ceilings, the facade of the building’s and the facades of the building, the renovation of the school’s walls, the renovation of the building and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the renovation of the school’s house, the renovation of the building and the gym, as well as the installation of the toilets, the installation of the halls of the building, the facilitation of the school’s hall, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the basement of the building’s, the renovation of the school’s bathroom, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s the basement of the building, the renovation of the school, the renovation of the building and the gym, as well as the installation of the building with the roof of the building, the installation of the building, the facade of the school, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s and the facades of the building, the renovation of the school’s-house, as well as the facade of the building, the installation of the building with the roof, the installation of the building’s from the basement, the renovation of the school’s-floor, the renovation of the building and the gym, as well as the installation of the building’s from the roof, the installation of the building’s from the basement, the renovation of the school’s, the renovation of the school’s walls and the gym halls, the installation of the ceilings of the building, the installation of the basement of the building, the renovation of the building’s, the renovation of the school and the gym halls, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s halls, the renovation of the school’s and the gym halls, the installation of the building’s ceilings and the facades of the building, as well as the renovation of the school’s halls, as well as the renovation of the building and the gymnautical halls, the installation of the building with the ceilings, the installation of the building’s and the facades of the building, the renovation of the school, the renovation of the building and the gymnautical halls, the installation of the building with the roof, the installation of the basement and the entrance hall, the renovation of the school’s hall, the toilet and the gym, the installation of the building with the roof, the installation of the basement and the fauvourishment of the building, the renovation of the school’s, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s hall, the bathroom and the gym halls, the installation of the building, the entrance to the building, the facades of the building, the renovation of the school’s halls, the renovation of the school and the gymnautical halls, the installation of the building with the rooftops, the partition of the building, and the target levels (in the case of benzo(α)pyrene-pyrene in the PM10 and ozone-suspended dust pits) should continue to (Finnish)
10 July 2022
0 references
Projekt se bo izvajal v mestu Inowrocław.Mesto je zdravilišče, turistično-rekreacijsko ter kulturno in industrijsko središče.Pomemben dejavnik razvoja so zdravilne vode v mestu, ki so bile pridobljene od decembra 2012. Mesto se nahaja v zdraviliškem in rekreacijskem kompleksu, ki se nahaja v bližini centra. Zdravilišče je bilo ustvarjeno v povezavi s pojavom slanice, ki se uporablja pri zdravljenju bolezni zgornjih dihal, cirkulacijskega sistema in drugih.Sanatorium baza v Inowrocław je objekt s širokim zdravljenjem in hotelsko bazo. Med letom so v zdraviliščih zacelili in rehabilitirali pribl. For this reason, the city should meet the air quality standards for spa towns, but exceed the permissible levels (dust suspended PM10 and PM2.5) and target levels (in the case of benzo(α)pyrene in suspended dust PM10 and ozone).Continuous activities should be continued to reduce pollution and low emissions.In the framework of the project, the project will be subject to thermomodernisation of the building SP No 8.The main purpose will be achieved by the installation of works contributing to improving the energy efficiency of the building SP 8In the framework of the project, the renovation of the school’s interiors, the renovation of the school’s walls and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the replacement of the school’s halls, the renovation of the school’s walls and the gymnastics halls, the installation of the building’s ceilings, the facade of the building’s and the facades of the building, the renovation of the school’s walls, the renovation of the building and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the renovation of the school’s house, the renovation of the building and the gym, as well as the installation of the toilets, the installation of the halls of the building, the facilitation of the school’s hall, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the basement of the building’s, the renovation of the school’s bathroom, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s the basement of the building, the renovation of the school, the renovation of the building and the gym, as well as the installation of the building with the roof of the building, the installation of the building, the facade of the school, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s and the facades of the building, the renovation of the school’s-house, as well as the facade of the building, the installation of the building with the roof, the installation of the building’s from the basement, the renovation of the school’s-floor, the renovation of the building and the gym, as well as the installation of the building’s from the roof, the installation of the building’s from the basement, the renovation of the school’s, the renovation of the school’s walls and the gym halls, the installation of the ceilings of the building, the installation of the basement of the building, the renovation of the building’s, the renovation of the school and the gym halls, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s halls, the renovation of the school’s and the gym halls, the installation of the building’s ceilings and the facades of the building, as well as the renovation of the school’s halls, as well as the renovation of the building and the gymnautical halls, the installation of the building with the ceilings, the installation of the building’s and the facades of the building, the renovation of the school, the renovation of the building and the gymnautical halls, the installation of the building with the roof, the installation of the basement and the entrance hall, the renovation of the school’s hall, the toilet and the gym, the installation of the building with the roof, the installation of the basement and the fauvourishment of the building, the renovation of the school’s, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s hall, the bathroom and the gym halls, the installation of the building, the entrance to the building, the facades of the building, the renovation of the school’s halls, the renovation of the school and the gymnautical halls, the installation of the building with the rooftops, the partition of the building, and the target levels (in the case of benzo(α)pyrene-pyrene in the PM10 and ozone-suspended dust pits) should continue to (Slovenian)
10 July 2022
0 references
Projekt bude realizován ve městě Inowrocław.Město je lázeňské, turisticko-rekreační a kulturní a průmyslové centrum.Významným faktorem rozvoje jsou léčivé vody nalezené ve městě, které byly vytěženy od prosince 2012.Město se nachází v lázeňském a rekreačním komplexu, který se nachází v blízkosti centra. Lázně byly vytvořeny v souvislosti s výskytem solanky používané při léčbě onemocnění horních cest dýchacích, oběhového systému a dalších.Sanatorium základna v Inowrocław je zařízení s širokou léčbou a hotelovou základnou. Během roku se v lázeňských střediscích uzdravila a rehabilitovala cca. For this reason, the city should meet the air quality standards for spa towns, but exceed the permissible levels (dust suspended PM10 and PM2.5) and target levels (in the case of benzo(α)pyrene in suspended dust PM10 and ozone).Continuous activities should be continued to reduce pollution and low emissions.In the framework of the project, the project will be subject to thermomodernisation of the building SP No 8.The main purpose will be achieved by the installation of works contributing to improving the energy efficiency of the building SP 8In the framework of the project, the renovation of the school’s interiors, the renovation of the school’s walls and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the replacement of the school’s halls, the renovation of the school’s walls and the gymnastics halls, the installation of the building’s ceilings, the facade of the building’s and the facades of the building, the renovation of the school’s walls, the renovation of the building and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the renovation of the school’s house, the renovation of the building and the gym, as well as the installation of the toilets, the installation of the halls of the building, the facilitation of the school’s hall, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the basement of the building’s, the renovation of the school’s bathroom, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s the basement of the building, the renovation of the school, the renovation of the building and the gym, as well as the installation of the building with the roof of the building, the installation of the building, the facade of the school, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s and the facades of the building, the renovation of the school’s-house, as well as the facade of the building, the installation of the building with the roof, the installation of the building’s from the basement, the renovation of the school’s-floor, the renovation of the building and the gym, as well as the installation of the building’s from the roof, the installation of the building’s from the basement, the renovation of the school’s, the renovation of the school’s walls and the gym halls, the installation of the ceilings of the building, the installation of the basement of the building, the renovation of the building’s, the renovation of the school and the gym halls, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s halls, the renovation of the school’s and the gym halls, the installation of the building’s ceilings and the facades of the building, as well as the renovation of the school’s halls, as well as the renovation of the building and the gymnautical halls, the installation of the building with the ceilings, the installation of the building’s and the facades of the building, the renovation of the school, the renovation of the building and the gymnautical halls, the installation of the building with the roof, the installation of the basement and the entrance hall, the renovation of the school’s hall, the toilet and the gym, the installation of the building with the roof, the installation of the basement and the fauvourishment of the building, the renovation of the school’s, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s hall, the bathroom and the gym halls, the installation of the building, the entrance to the building, the facades of the building, the renovation of the school’s halls, the renovation of the school and the gymnautical halls, the installation of the building with the rooftops, the partition of the building, and the target levels (in the case of benzo(α)pyrene-pyrene in the PM10 and ozone-suspended dust pits) should continue to (Czech)
10 July 2022
0 references
Projektas bus įgyvendintas Inowrocław mieste.Miestas yra SPA centras, turistinis-rekreacinis ir kultūros bei pramonės centras.Svarbus plėtros veiksnys yra medicininiai vandenys, rasti mieste, kuris buvo išgaunamas nuo 2012 m. gruodžio mėn. SPA buvo sukurtas atsižvelgiant į sūrymo, naudojamo viršutinių kvėpavimo takų, kraujotakos sistemos ir kitų ligų gydymui, atsiradimą. Per metus SPA kurortuose išgydyta ir reabilituota maždaug. For this reason, the city should meet the air quality standards for spa towns, but exceed the permissible levels (dust suspended PM10 and PM2.5) and target levels (in the case of benzo(α)pyrene in suspended dust PM10 and ozone).Continuous activities should be continued to reduce pollution and low emissions.In the framework of the project, the project will be subject to thermomodernisation of the building SP No 8.The main purpose will be achieved by the installation of works contributing to improving the energy efficiency of the building SP 8In the framework of the project, the renovation of the school’s interiors, the renovation of the school’s walls and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the replacement of the school’s halls, the renovation of the school’s walls and the gymnastics halls, the installation of the building’s ceilings, the facade of the building’s and the facades of the building, the renovation of the school’s walls, the renovation of the building and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the renovation of the school’s house, the renovation of the building and the gym, as well as the installation of the toilets, the installation of the halls of the building, the facilitation of the school’s hall, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the basement of the building’s, the renovation of the school’s bathroom, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s the basement of the building, the renovation of the school, the renovation of the building and the gym, as well as the installation of the building with the roof of the building, the installation of the building, the facade of the school, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s and the facades of the building, the renovation of the school’s-house, as well as the facade of the building, the installation of the building with the roof, the installation of the building’s from the basement, the renovation of the school’s-floor, the renovation of the building and the gym, as well as the installation of the building’s from the roof, the installation of the building’s from the basement, the renovation of the school’s, the renovation of the school’s walls and the gym halls, the installation of the ceilings of the building, the installation of the basement of the building, the renovation of the building’s, the renovation of the school and the gym halls, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s halls, the renovation of the school’s and the gym halls, the installation of the building’s ceilings and the facades of the building, as well as the renovation of the school’s halls, as well as the renovation of the building and the gymnautical halls, the installation of the building with the ceilings, the installation of the building’s and the facades of the building, the renovation of the school, the renovation of the building and the gymnautical halls, the installation of the building with the roof, the installation of the basement and the entrance hall, the renovation of the school’s hall, the toilet and the gym, the installation of the building with the roof, the installation of the basement and the fauvourishment of the building, the renovation of the school’s, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s hall, the bathroom and the gym halls, the installation of the building, the entrance to the building, the facades of the building, the renovation of the school’s halls, the renovation of the school and the gymnautical halls, the installation of the building with the rooftops, the partition of the building, and the target levels (in the case of benzo(α)pyrene-pyrene in the PM10 and ozone-suspended dust pits) should continue to (Lithuanian)
10 July 2022
0 references
Projekts tiks īstenots pilsētā Inowrocław.Pilsēta ir spa, tūristu atpūtas un kultūras un rūpniecības centrs.Svarīgs attīstības faktors ir ārstniecības ūdeņi atrodami pilsētā, kas ir iegūti kopš 2012. gada decembra. Spa tika izveidota saistībā ar rašanos sālsūdens, ko izmanto, lai ārstētu slimības augšējo elpceļu, asinsrites sistēmu un citi.Sanatorijas bāze Inowrocław ir iekārta ar plašu ārstēšanu un viesnīcu bāzi. Gada laikā, spa kūrortos dziedināja un rehabilitēja apm. For this reason, the city should meet the air quality standards for spa towns, but exceed the permissible levels (dust suspended PM10 and PM2.5) and target levels (in the case of benzo(α)pyrene in suspended dust PM10 and ozone).Continuous activities should be continued to reduce pollution and low emissions.In the framework of the project, the project will be subject to thermomodernisation of the building SP No 8.The main purpose will be achieved by the installation of works contributing to improving the energy efficiency of the building SP 8In the framework of the project, the renovation of the school’s interiors, the renovation of the school’s walls and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the replacement of the school’s halls, the renovation of the school’s walls and the gymnastics halls, the installation of the building’s ceilings, the facade of the building’s and the facades of the building, the renovation of the school’s walls, the renovation of the building and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the renovation of the school’s house, the renovation of the building and the gym, as well as the installation of the toilets, the installation of the halls of the building, the facilitation of the school’s hall, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the basement of the building’s, the renovation of the school’s bathroom, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s the basement of the building, the renovation of the school, the renovation of the building and the gym, as well as the installation of the building with the roof of the building, the installation of the building, the facade of the school, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s and the facades of the building, the renovation of the school’s-house, as well as the facade of the building, the installation of the building with the roof, the installation of the building’s from the basement, the renovation of the school’s-floor, the renovation of the building and the gym, as well as the installation of the building’s from the roof, the installation of the building’s from the basement, the renovation of the school’s, the renovation of the school’s walls and the gym halls, the installation of the ceilings of the building, the installation of the basement of the building, the renovation of the building’s, the renovation of the school and the gym halls, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s halls, the renovation of the school’s and the gym halls, the installation of the building’s ceilings and the facades of the building, as well as the renovation of the school’s halls, as well as the renovation of the building and the gymnautical halls, the installation of the building with the ceilings, the installation of the building’s and the facades of the building, the renovation of the school, the renovation of the building and the gymnautical halls, the installation of the building with the roof, the installation of the basement and the entrance hall, the renovation of the school’s hall, the toilet and the gym, the installation of the building with the roof, the installation of the basement and the fauvourishment of the building, the renovation of the school’s, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s hall, the bathroom and the gym halls, the installation of the building, the entrance to the building, the facades of the building, the renovation of the school’s halls, the renovation of the school and the gymnautical halls, the installation of the building with the rooftops, the partition of the building, and the target levels (in the case of benzo(α)pyrene-pyrene in the PM10 and ozone-suspended dust pits) should continue to (Latvian)
10 July 2022
0 references
Проектът ще бъде реализиран в град Inowrocław.Градът е СПА, туристическо-развлекателен и културен и индустриален център.Значителен фактор за развитие са лечебни води, открити в града, които са били извлечени от декември 2012.Градът се намира в спа и отдих комплекс, разположен в близост до центъра. СПА центърът е създаден във връзка с появата на саламура, използвана за лечение на заболявания на горните дихателни пътища, кръвоносната система и др. През годината в балнеоложките курорти се лекуват и рехабилитират прибл. For this reason, the city should meet the air quality standards for spa towns, but exceed the permissible levels (dust suspended PM10 and PM2.5) and target levels (in the case of benzo(α)pyrene in suspended dust PM10 and ozone).Continuous activities should be continued to reduce pollution and low emissions.In the framework of the project, the project will be subject to thermomodernisation of the building SP No 8.The main purpose will be achieved by the installation of works contributing to improving the energy efficiency of the building SP 8In the framework of the project, the renovation of the school’s interiors, the renovation of the school’s walls and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the replacement of the school’s halls, the renovation of the school’s walls and the gymnastics halls, the installation of the building’s ceilings, the facade of the building’s and the facades of the building, the renovation of the school’s walls, the renovation of the building and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the renovation of the school’s house, the renovation of the building and the gym, as well as the installation of the toilets, the installation of the halls of the building, the facilitation of the school’s hall, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the basement of the building’s, the renovation of the school’s bathroom, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s the basement of the building, the renovation of the school, the renovation of the building and the gym, as well as the installation of the building with the roof of the building, the installation of the building, the facade of the school, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s and the facades of the building, the renovation of the school’s-house, as well as the facade of the building, the installation of the building with the roof, the installation of the building’s from the basement, the renovation of the school’s-floor, the renovation of the building and the gym, as well as the installation of the building’s from the roof, the installation of the building’s from the basement, the renovation of the school’s, the renovation of the school’s walls and the gym halls, the installation of the ceilings of the building, the installation of the basement of the building, the renovation of the building’s, the renovation of the school and the gym halls, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s halls, the renovation of the school’s and the gym halls, the installation of the building’s ceilings and the facades of the building, as well as the renovation of the school’s halls, as well as the renovation of the building and the gymnautical halls, the installation of the building with the ceilings, the installation of the building’s and the facades of the building, the renovation of the school, the renovation of the building and the gymnautical halls, the installation of the building with the roof, the installation of the basement and the entrance hall, the renovation of the school’s hall, the toilet and the gym, the installation of the building with the roof, the installation of the basement and the fauvourishment of the building, the renovation of the school’s, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s hall, the bathroom and the gym halls, the installation of the building, the entrance to the building, the facades of the building, the renovation of the school’s halls, the renovation of the school and the gymnautical halls, the installation of the building with the rooftops, the partition of the building, and the target levels (in the case of benzo(α)pyrene-pyrene in the PM10 and ozone-suspended dust pits) should continue to (Bulgarian)
10 July 2022
0 references
A projekt kerül végrehajtásra a város Inowrocław.A város egy fürdő, turisztikai-rekreációs és kulturális és ipari központ.A jelentős tényező a gyógyvizek található a városban, amely már kitermelt 2012 decembere óta A város található egy fürdő és rekreációs komplexum közelében található a központ. A fürdő a felső légutak, keringési rendszer és mások betegségeinek kezelésére használt sós lében való előfordulásával kapcsolatban jött létre. Az év folyamán a gyógyüdülők kb. For this reason, the city should meet the air quality standards for spa towns, but exceed the permissible levels (dust suspended PM10 and PM2.5) and target levels (in the case of benzo(α)pyrene in suspended dust PM10 and ozone).Continuous activities should be continued to reduce pollution and low emissions.In the framework of the project, the project will be subject to thermomodernisation of the building SP No 8.The main purpose will be achieved by the installation of works contributing to improving the energy efficiency of the building SP 8In the framework of the project, the renovation of the school’s interiors, the renovation of the school’s walls and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the replacement of the school’s halls, the renovation of the school’s walls and the gymnastics halls, the installation of the building’s ceilings, the facade of the building’s and the facades of the building, the renovation of the school’s walls, the renovation of the building and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the renovation of the school’s house, the renovation of the building and the gym, as well as the installation of the toilets, the installation of the halls of the building, the facilitation of the school’s hall, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the basement of the building’s, the renovation of the school’s bathroom, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s the basement of the building, the renovation of the school, the renovation of the building and the gym, as well as the installation of the building with the roof of the building, the installation of the building, the facade of the school, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s and the facades of the building, the renovation of the school’s-house, as well as the facade of the building, the installation of the building with the roof, the installation of the building’s from the basement, the renovation of the school’s-floor, the renovation of the building and the gym, as well as the installation of the building’s from the roof, the installation of the building’s from the basement, the renovation of the school’s, the renovation of the school’s walls and the gym halls, the installation of the ceilings of the building, the installation of the basement of the building, the renovation of the building’s, the renovation of the school and the gym halls, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s halls, the renovation of the school’s and the gym halls, the installation of the building’s ceilings and the facades of the building, as well as the renovation of the school’s halls, as well as the renovation of the building and the gymnautical halls, the installation of the building with the ceilings, the installation of the building’s and the facades of the building, the renovation of the school, the renovation of the building and the gymnautical halls, the installation of the building with the roof, the installation of the basement and the entrance hall, the renovation of the school’s hall, the toilet and the gym, the installation of the building with the roof, the installation of the basement and the fauvourishment of the building, the renovation of the school’s, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s hall, the bathroom and the gym halls, the installation of the building, the entrance to the building, the facades of the building, the renovation of the school’s halls, the renovation of the school and the gymnautical halls, the installation of the building with the rooftops, the partition of the building, and the target levels (in the case of benzo(α)pyrene-pyrene in the PM10 and ozone-suspended dust pits) should continue to (Hungarian)
10 July 2022
0 references
Cuirfear an tionscadal i bhfeidhm i gcathair Inowrocław.Is Spa, ionad áineasa turasóireachta agus cultúrtha agus tionsclaíoch í an chathair. Cruthaíodh an Spa i ndáil le tarlú sáile a úsáidtear i gcóireáil galair an chonair riospráide uachtarach, córas imshruthaithe agus eile.Is saoráid é an bonn sanatorium in Inowrocław le cóireáil leathan agus bonn óstáin. I rith na bliana, sa Spa ionaid healed agus rehabilitated thart. For this reason, the city should meet the air quality standards for spa towns, but exceed the permissible levels (dust suspended PM10 and PM2.5) and target levels (in the case of benzo(α)pyrene in suspended dust PM10 and ozone).Continuous activities should be continued to reduce pollution and low emissions.In the framework of the project, the project will be subject to thermomodernisation of the building SP No 8.The main purpose will be achieved by the installation of works contributing to improving the energy efficiency of the building SP 8In the framework of the project, the renovation of the school’s interiors, the renovation of the school’s walls and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the replacement of the school’s halls, the renovation of the school’s walls and the gymnastics halls, the installation of the building’s ceilings, the facade of the building’s and the facades of the building, the renovation of the school’s walls, the renovation of the building and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the renovation of the school’s house, the renovation of the building and the gym, as well as the installation of the toilets, the installation of the halls of the building, the facilitation of the school’s hall, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the basement of the building’s, the renovation of the school’s bathroom, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s the basement of the building, the renovation of the school, the renovation of the building and the gym, as well as the installation of the building with the roof of the building, the installation of the building, the facade of the school, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s and the facades of the building, the renovation of the school’s-house, as well as the facade of the building, the installation of the building with the roof, the installation of the building’s from the basement, the renovation of the school’s-floor, the renovation of the building and the gym, as well as the installation of the building’s from the roof, the installation of the building’s from the basement, the renovation of the school’s, the renovation of the school’s walls and the gym halls, the installation of the ceilings of the building, the installation of the basement of the building, the renovation of the building’s, the renovation of the school and the gym halls, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s halls, the renovation of the school’s and the gym halls, the installation of the building’s ceilings and the facades of the building, as well as the renovation of the school’s halls, as well as the renovation of the building and the gymnautical halls, the installation of the building with the ceilings, the installation of the building’s and the facades of the building, the renovation of the school, the renovation of the building and the gymnautical halls, the installation of the building with the roof, the installation of the basement and the entrance hall, the renovation of the school’s hall, the toilet and the gym, the installation of the building with the roof, the installation of the basement and the fauvourishment of the building, the renovation of the school’s, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s hall, the bathroom and the gym halls, the installation of the building, the entrance to the building, the facades of the building, the renovation of the school’s halls, the renovation of the school and the gymnautical halls, the installation of the building with the rooftops, the partition of the building, and the target levels (in the case of benzo(α)pyrene-pyrene in the PM10 and ozone-suspended dust pits) should continue to (Irish)
10 July 2022
0 references
Projektet kommer att genomföras i staden Inowrocław.Staden är ett spa, turist-rekreationell och kulturellt och industriellt centrum.En viktig faktor för utveckling är medicinska vatten som finns i staden, som har extraherats sedan december 2012.Staden ligger i ett spa- och rekreationskomplex som ligger nära centrum. Spaet skapades i samband med förekomsten av saltlake som används vid behandling av sjukdomar i övre luftvägarna, cirkulationssystemet och andra.Sanaatoriumbasen i Inowrocław är en anläggning med en bred behandling och hotellbas. Under året läkte och rehabiliterades i spaanläggningarna ca. For this reason, the city should meet the air quality standards for spa towns, but exceed the permissible levels (dust suspended PM10 and PM2.5) and target levels (in the case of benzo(α)pyrene in suspended dust PM10 and ozone).Continuous activities should be continued to reduce pollution and low emissions.In the framework of the project, the project will be subject to thermomodernisation of the building SP No 8.The main purpose will be achieved by the installation of works contributing to improving the energy efficiency of the building SP 8In the framework of the project, the renovation of the school’s interiors, the renovation of the school’s walls and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the replacement of the school’s halls, the renovation of the school’s walls and the gymnastics halls, the installation of the building’s ceilings, the facade of the building’s and the facades of the building, the renovation of the school’s walls, the renovation of the building and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the renovation of the school’s house, the renovation of the building and the gym, as well as the installation of the toilets, the installation of the halls of the building, the facilitation of the school’s hall, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the basement of the building’s, the renovation of the school’s bathroom, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s the basement of the building, the renovation of the school, the renovation of the building and the gym, as well as the installation of the building with the roof of the building, the installation of the building, the facade of the school, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s and the facades of the building, the renovation of the school’s-house, as well as the facade of the building, the installation of the building with the roof, the installation of the building’s from the basement, the renovation of the school’s-floor, the renovation of the building and the gym, as well as the installation of the building’s from the roof, the installation of the building’s from the basement, the renovation of the school’s, the renovation of the school’s walls and the gym halls, the installation of the ceilings of the building, the installation of the basement of the building, the renovation of the building’s, the renovation of the school and the gym halls, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s halls, the renovation of the school’s and the gym halls, the installation of the building’s ceilings and the facades of the building, as well as the renovation of the school’s halls, as well as the renovation of the building and the gymnautical halls, the installation of the building with the ceilings, the installation of the building’s and the facades of the building, the renovation of the school, the renovation of the building and the gymnautical halls, the installation of the building with the roof, the installation of the basement and the entrance hall, the renovation of the school’s hall, the toilet and the gym, the installation of the building with the roof, the installation of the basement and the fauvourishment of the building, the renovation of the school’s, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s hall, the bathroom and the gym halls, the installation of the building, the entrance to the building, the facades of the building, the renovation of the school’s halls, the renovation of the school and the gymnautical halls, the installation of the building with the rooftops, the partition of the building, and the target levels (in the case of benzo(α)pyrene-pyrene in the PM10 and ozone-suspended dust pits) should continue to (Swedish)
10 July 2022
0 references
Projekt viiakse ellu Inowrocław linnas.Linn on spaa, turismi-vabaaja- ning kultuuri- ja tööstuskeskus.Oluline arengutegur on linnas leiduvad meditsiinilised veed, mida on kaevandatud alates 2012. aasta detsembrist.linn asub keskuse lähedal asuvas spaas ja puhkekompleksis. Spa loodi seoses esinemise soolvee kasutatakse haiguste ülemiste hingamisteede, vereringe süsteemi ja teised.Sanatooriumi baasi Inowrocław on rajatis lai ravi ja hotelli baasi. Aasta jooksul paranesid ja rehabiliteerisid spaa kuurordid ligikaudu. For this reason, the city should meet the air quality standards for spa towns, but exceed the permissible levels (dust suspended PM10 and PM2.5) and target levels (in the case of benzo(α)pyrene in suspended dust PM10 and ozone).Continuous activities should be continued to reduce pollution and low emissions.In the framework of the project, the project will be subject to thermomodernisation of the building SP No 8.The main purpose will be achieved by the installation of works contributing to improving the energy efficiency of the building SP 8In the framework of the project, the renovation of the school’s interiors, the renovation of the school’s walls and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the replacement of the school’s halls, the renovation of the school’s walls and the gymnastics halls, the installation of the building’s ceilings, the facade of the building’s and the facades of the building, the renovation of the school’s walls, the renovation of the building and the gymnastics, the installation of the building’s roof, the installation of the building’s basement, the renovation of the school’s house, the renovation of the building and the gym, as well as the installation of the toilets, the installation of the halls of the building, the facilitation of the school’s hall, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the basement of the building’s, the renovation of the school’s bathroom, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s the basement of the building, the renovation of the school, the renovation of the building and the gym, as well as the installation of the building with the roof of the building, the installation of the building, the facade of the school, the renovation of the building and the gym, the installation of the building’s roof, the installation of the building’s and the facades of the building, the renovation of the school’s-house, as well as the facade of the building, the installation of the building with the roof, the installation of the building’s from the basement, the renovation of the school’s-floor, the renovation of the building and the gym, as well as the installation of the building’s from the roof, the installation of the building’s from the basement, the renovation of the school’s, the renovation of the school’s walls and the gym halls, the installation of the ceilings of the building, the installation of the basement of the building, the renovation of the building’s, the renovation of the school and the gym halls, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s halls, the renovation of the school’s and the gym halls, the installation of the building’s ceilings and the facades of the building, as well as the renovation of the school’s halls, as well as the renovation of the building and the gymnautical halls, the installation of the building with the ceilings, the installation of the building’s and the facades of the building, the renovation of the school, the renovation of the building and the gymnautical halls, the installation of the building with the roof, the installation of the basement and the entrance hall, the renovation of the school’s hall, the toilet and the gym, the installation of the building with the roof, the installation of the basement and the fauvourishment of the building, the renovation of the school’s, the renovation of the building and the gym, the installation of the building with the roof, the installation of the building’s and the facades of the building, the renovation of the school’s hall, the bathroom and the gym halls, the installation of the building, the entrance to the building, the facades of the building, the renovation of the school’s halls, the renovation of the school and the gymnautical halls, the installation of the building with the rooftops, the partition of the building, and the target levels (in the case of benzo(α)pyrene-pyrene in the PM10 and ozone-suspended dust pits) should continue to (Estonian)
10 July 2022
0 references
WOJ.: KUJAWSKO-POMORSKIE, POW.: inowrocławski
0 references
6 July 2023
0 references
Identifiers
RPKP.03.03.00-04-0028/19
0 references