Construction of the A2 motorway, odc. Warsaw (Lublin) — Minsk Mazowiecki (Q85864)

From EU Knowledge Graph
Revision as of 10:26, 16 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the A2 motorway, odc. Warsaw (Lublin) — Minsk Mazowiecki
Project in Poland financed by DG Regio

    Statements

    0 references
    329,575,563.57 zloty
    0 references
    79,098,135.2568 Euro
    13 January 2020
    0 references
    815,444,943.03 zloty
    0 references
    195,706,786.3272 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2021
    0 references
    GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
    0 references
    0 references

    52°9'25.2"N, 21°37'36.5"E
    0 references

    52°4'22.1"N, 21°21'29.9"E
    0 references
    Projekt ma na celu budowę autostrady A2 na odc. Warszawa (w. Lubelska–bez węzła) – początek obw. Mińska Maz. o dł. 14,77 km, zlokalizowanej w sieci bazowej TEN-T. Składa się on z następujących zadań, realizowanych jako osobne kontrakty na roboty budowlane w systemie P&B: - Zadanie A: Projekt i budowa autostrady A2 Warszawa – Kukuryki na odcinku w. Lubelska – początek obw. Mińska Maz. odcinek I od w. Lubelska (bez węzła) do w. Konik (z węzłem) o długości około 5,6 km (szczegółowy pikietaż zadania od km 489+325,68 do km 494+905,40 daje długość 5 579,72 m) - Zadanie B: Projekt i budowa autostrady A2 Warszawa – Kukuryki na odcinku w. Lubelska – początek obw. Mińska Maz. odcinek II od w. Konik (bez węzła) do początku obw. Mińska Mazowieckiego o długości około 9 km (szczegółowy pikietaż zadania od km 494+905,40 do km 504+094,76 daje długość 9 189,36 m). (Polish)
    0 references
    The project aims at the construction of the A2 motorway on a cac.Warsaw (W. Lubelska-no node) — the beginning of the OBW.Minsk, y/y/y/o/o/o/o/o/o/o14.77 km, which is located on the TEN-T core network, consists of the following tasks which are carried out as separate works contracts within the P & B system:— Activity A:Project and construction of the A2 motorway Warszawa — Kukuryki na lubelska — start of OBW.MIA.Z. section I from the century Lubelska (without junction) until the. Konik (with interchange) of approximately 5.6 km length (with a specific mission from km 489 + 325,68 to km 494 + 905,40, gives a length of 5 579.72 m) — Task B:Project and construction of the A2 motorway Warszawa — Kukuryki na lubelska — start of OBW.Minsk, section II from the Konik (without junction) to the beginning of the OBW.Mińsk Mazowiecki with a length of approximately 9 km (a detailed picture of a mission from km 494 + 905,40 to km 504 + 094,76) is 9 189.36 m long. (English)
    0 references

    Identifiers

    POIS.03.01.00-00-0043/18
    0 references
    4820