Scientific support for the implementation of the step-by-step model for building up the working capacity in Salzburg, in particular by the Sbg. ESF basic projects (Q3089536)

From EU Knowledge Graph
Revision as of 22:26, 9 October 2024 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in pt)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Project Q3089536 in Austria
Language Label Description Also known as
English
Scientific support for the implementation of the step-by-step model for building up the working capacity in Salzburg, in particular by the Sbg. ESF basic projects
Project Q3089536 in Austria

    Statements

    0 references
    100,000.0 Euro
    0 references
    1 October 2018
    0 references
    31 December 2022
    0 references
    Land Salzburg
    0 references
    0 references
    Scientific support for the implementation of the step-by-step model for building up the working capacity in Salzburg during the period 1.10.2018-31.12.2023 (longest time) (English)
    3 September 2021
    0.0165468874915342
    0 references
    Wissenschaftliche Begleitung der Umsetzung des Stufenmodelles zum Aufbau der Arbeitsfähigkeit in Salzburg im Zeitraum von 1.10.2018-31.12.2023 (längstens) (French)
    27 November 2021
    0 references
    Wetenschappelijke ondersteuning voor de uitvoering van het stapsgewijze model voor de opbouw van de werkcapaciteit in Salzburg in de periode 1.10.2018-31.12.2023 (langste tijd) (Dutch)
    29 November 2021
    0 references
    Wissenschaftliche Begleitung der Umsetzung des Stufenmodelles zum Aufbau der Arbeitsfähigkeit in Salzburg im Zeitraum von 1.10.2018 – 31.12.2023 (längstens) (German)
    0 references
    Sostegno scientifico all'attuazione del modello graduale per lo sviluppo della capacità di lavoro a Salisburgo nel periodo 1.10.2018-31.12.2023 (periodo più lungo) (Italian)
    11 January 2022
    0 references
    Apoyo científico a la aplicación del modelo paso a paso para el refuerzo de la capacidad de trabajo en Salzburgo durante el período comprendido entre el 1.10.2018 y el 31.12.2023 (tiempo más prolongado) (Spanish)
    12 January 2022
    0 references
    Επιστημονική υποστήριξη για την εφαρμογή του μοντέλου σταδιακής ανάπτυξης της ικανότητας εργασίας στο Σάλτσμπουργκ κατά την περίοδο 1.10.2018-31.12.2023 (μεγαλύτερο χρονικό διάστημα) (Greek)
    17 August 2022
    0 references
    Videnskabelig støtte til gennemførelsen af den trinvise model for opbygning af arbejdskapaciteten i Salzburg i perioden 1.10.2018-31.12.2023 (langest tid) (Danish)
    17 August 2022
    0 references
    Tieteellinen tuki Salzburgin työkyvyn kehittämistä koskevan vaiheittaisen mallin täytäntöönpanolle 1.10.2018–31.12.2023 (pisin aika) (Finnish)
    17 August 2022
    0 references
    Appoġġ xjentifiku għall-implimentazzjoni tal-mudell pass pass għall-bini tal-kapaċità tax-xogħol f’Salzburg matul il-perjodu 1.10.2018–31.12.2023 (l-itwal żmien) (Maltese)
    17 August 2022
    0 references
    Zinātniskais atbalsts pakāpeniskas darba jaudas palielināšanas modeļa īstenošanai Zalcburgā laikposmā no 2018. gada 1. oktobra līdz 2030. gada 31. decembrim (ilgākais laiks) (Latvian)
    17 August 2022
    0 references
    Vedecká podpora implementácie podrobného modelu budovania pracovných kapacít v Salzburgu v období od 1.10.2018 do 31. 12. 2023 (najdlhšie) (Slovak)
    17 August 2022
    0 references
    Tacaíocht eolaíoch do chur chun feidhme na samhla céim ar chéim chun an acmhainneacht oibre a fhorbairt in Salzburg le linn na tréimhse 1.10.2018-31.12.2023 (an t-am is faide) (Irish)
    17 August 2022
    0 references
    Vědecká podpora provádění modelu postupného budování pracovních kapacit v Salcburku v období 1.10.2018–31.12.2023 (nejdelší doba) (Czech)
    17 August 2022
    0 references
    Apoio científico à aplicação do modelo por etapas para o reforço da capacidade de trabalho em Salzburgo durante o período de 1.10.2018-31.12.2023 (o período mais longo) (Portuguese)
    17 August 2022
    0 references
    Teaduslik toetus Salzburgis töövõime suurendamise järkjärgulise mudeli rakendamiseks ajavahemikul 1.10.2018–31.12.2023 (pikam aeg) (Estonian)
    17 August 2022
    0 references
    Tudományos támogatás a salzburgi munkakapacitás kiépítésére irányuló lépésenkénti modell megvalósításához a 2018. október 1. és 2023. december 31. közötti időszakban (leghosszabb idő) (Hungarian)
    17 August 2022
    0 references
    Научна подкрепа за прилагането на поетапния модел за изграждане на работен капацитет в Залцбург през периода 1.10.2018—31.12.2023 г. (най-дълго време) (Bulgarian)
    17 August 2022
    0 references
    Mokslinė parama įgyvendinant laipsnišką darbingumo didinimo Zalcburge modelį nuo 2018 m. spalio 1 d. iki 2023 m. gruodžio 31 d. (ilgiausiai) (Lithuanian)
    17 August 2022
    0 references
    Znanstvena potpora za provedbu postupnog modela za izgradnju radnih kapaciteta u Salzburgu tijekom razdoblja od 1.10.2018. do 31. prosinca 2023. (najdulje vrijeme) (Croatian)
    17 August 2022
    0 references
    Vetenskapligt stöd för genomförandet av den stegvisa modellen för uppbyggnad av arbetskapaciteten i Salzburg under perioden 1.10.2018–31.12.2023 (längst) (Swedish)
    17 August 2022
    0 references
    Sprijin științific pentru punerea în aplicare a modelului pas cu pas pentru consolidarea capacității de lucru în Salzburg în perioada 1.10.2018-31.12.2023 (cea mai lungă perioadă de timp) (Romanian)
    17 August 2022
    0 references
    Znanstvena podpora za izvajanje postopnega modela za krepitev delovne zmogljivosti v Salzburgu v obdobju 1.10.2018–31.12.2023 (najdaljši čas) (Slovenian)
    17 August 2022
    0 references
    Wsparcie naukowe na rzecz wdrożenia modelu stopniowego zwiększania zdolności do pracy w Salzburgu w okresie od 1.10.2018 do 31.12.2023 r. (najdłuższy czas) (Polish)
    17 August 2022
    0 references
    7 December 2023
    0 references

    Identifiers

    2EAAEB_00786
    0 references