Construction of the Zaciza I photovoltaic farm up to 1 MW with the necessary technical infrastructure and connection to the power grid in the municipality of Mirosławiec (Q137743)

From EU Knowledge Graph
Revision as of 23:53, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the Zaciza I photovoltaic farm up to 1 MW with the necessary technical infrastructure and connection to the power grid in the municipality of Mirosławiec
Project in Poland financed by DG Regio

    Statements

    0 references
    1,019,403.74 zloty
    0 references
    244,656.8976 Euro
    13 January 2020
    0 references
    2,906,348.1 zloty
    0 references
    697,523.544 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    11 January 2019
    0 references
    30 June 2019
    0 references
    ES JARSZEWO SPÓŁKA Z O.O.
    0 references
    0 references
    Przedmiotem projektu jest budowa farmy fotowoltaicznej o mocy do 1 MW w miejscowości Mirosławiec na działkach o ew. nr 244 i 245. Projekt ma charakter stacjonarny i będzie składał się z jednego etapu polegającego na budowie farmy. W ramach realizacji projektu Wnioskodawca dokona zakupu instalacji fotowoltaicznej z niezbędnymi elementami, tj. konstrukcji do paneli fotowoltaicznych, paneli fotowoltaicznych oraz inwerterów. Zgodnie z aktualnym projektem planuje się zainstalowanie 3190 sztuk paneli, każdy o mocy 265W, tj. 3190x265W=845350 W. W związku z faktem, iż fotowoltaika jest relatywnie nową dziedziną, w stałym procesie rozwoju i udoskonalania, Wnioskodawca dopuszcza zmianę zainstalowanej mocy tak, aby nie przekroczyła ona 1 MW, a zatem ilość i moc poszczególnych paneli fotowoltaicznych może ulec zmianie. Na dzień składania wniosku planuje się mocy zainstalowaną równą 0,845 MW. Taka zmiana wynikałaby ze stale trwających prac dot. zwiększenia produktywności i efektywności paneli (np. W ciągu ostatnich dwóch lat standardowy panel dostępny na rynku zmienił swój parametr określający moc z wartości 230W na 250W, nie zmieniając tym samym wymiarów panela). Ponadto w celu rozpoczęcia produkcji energii elektrycznej Wnioskodawca zaplanował prace w obrębie infrastruktury elektrycznej: instalacja wewnętrzna nN - trasy kablowe; instalacja zewnętrzna SN - trasa kablowa, komunikacja; łączność, telemechanika; stacja transformatorowo - rozdzielcza, pozostała infrastruktura elektroenergetyczna. Projekt obejmuje też wydatki związane z informację i promocją, ogrodzeniem, systemem alarmowym i monitoringiem i in. W wyniku projektu Wnioskodawca rozpocznie produkcję energii elektrycznej ze słońca, dzięki czemu możliwe będzie osiągnięcie określonych w we wniosku wskaźników rezultatu. Na dzień składania wniosku Wnioskodawca dysponuje niemal wszystkimi niezbędnymi zezwolenia do rozpoczęcia inwestycj (Polish)
    0 references
    The project consists of the construction of a 1-MW photovoltaic power plant in the town of Mirosławiec on plots Nos 244 and 245. The project is stationary and will consist of a single farm. As part of the project, the applicant will purchase a photovoltaic installation with the necessary elements, i.e. the construction of photovoltaic panels, solar panels and inverters. According to the current draft, 3190 panels are planned to be installed each 265W; 3190x265W = 845350 W. As a consequence of the fact that photovoltaics is a relatively new area in the continuous process of development and improvement, the applicant accepts the change of installed capacity so that it does not exceed 1 MW, so that the quantity and power of the different solar panels can change. At the date of the application, an installed capacity of 0.845 MW is planned. This change would result from ongoing work on increasing the productivity and efficiency of the panels (e.g.: Over the last two years, the standard panel available on the market has changed its parameter defining power from 230W to 250W without changing the dimensions of the panel). In addition, in order to start the electricity production, the applicant has planned work on the electricity infrastructure: NN internal installation — cable routing; external SN — cable route, communication; communication, telemechanics; transformer station — switchgear, other electricity infrastructure. The project also includes expenditure related to information and promotion, fence, alert and monitoring and others. As a result of the project, the applicant will start producing electricity from the sun, which will make it possible to achieve the result indicators set out in the proposal. At the date of application, the applicant has almost all the necessary authorisations to start the investment (English)
    0 references