Reconstruction of district heating network sections of Aukštakalnis district in Utena city (Q3802210)

From EU Knowledge Graph
Revision as of 03:26, 9 October 2024 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in pt)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Project Q3802210 in Lithuania
Language Label Description Also known as
English
Reconstruction of district heating network sections of Aukštakalnis district in Utena city
Project Q3802210 in Lithuania

    Statements

    0 references
    313,760.09 Euro
    0 references
    627,520.18 Euro
    0 references
    50.0 percent
    0 references
    5 August 2019
    0 references
    9 August 2021
    0 references
    Uždaroji akcinė bendrovė "Utenos šilumos tinklai"
    0 references
    0 references

    55°29'52.80"N, 25°38'21.55"E
    0 references
    LT-28216
    0 references
    Projekte „Aukštakalnio mikrorajono centralizuotų šilumos tiekimo tinklų ruožų rekonstrukcija Utenos mieste“, kurio vykdymas numatytas 2019-2021 m., numatoma vietoj 1422,07 m DN 50–400 mm skersmens senų, susidėvėjusių, nepraeinamuose kanaluose paklotų šilumos tiekimo tinklų sumontuoti naujus iš viso 1369,60 m ilgio optimizuoto skersmens ir klojimo trajektorijos iš anksto izoliuotus pramoniniu būdu DN 40-300 bekanalius šilumos tiekimo tinklus. Rekonstruoti tinklai bus klojami optimizuota trajektorija, dėl ko sutrumpės bendras tinklų ilgis ir šiluma bus tiekiama efektyviau. (Lithuanian)
    0 references
    The project ‘Reconstruction of district heating grids in Utena district’, which is planned for 2019-2021, provides for the installation of new heat supply networks with an optimised diameter of 1 369.60 m long and pre-insulated industrially-insulated network DN 40-300 with a total length of 1 369.60 m. Reconstructed networks will be built with an optimised trajectory, which will reduce the overall length of the networks and provide more efficient heat supply. (English)
    1 February 2022
    0.2219764805606797
    0 references
    Le projet «Reconstruction des réseaux de chauffage urbain dans le district d’Utena», prévu pour 2019-2021, prévoit l’installation de nouveaux réseaux d’approvisionnement en chaleur d’un diamètre optimisé de 1 369,60 m de long et d’un réseau à isolation industrielle pré-isolée DN 40-300 d’une longueur totale de 1 369,60 m. Les réseaux reconstruits seront construits avec une trajectoire optimisée, ce qui réduira la longueur totale des réseaux et assurera un approvisionnement en chaleur plus efficace. (French)
    1 February 2022
    0 references
    Das für den Zeitraum 2019-2021 geplante Projekt „Rekonstruktion von Fernwärmenetzen im Bezirk Utena“ sieht die Installation neuer Wärmeversorgungsnetze mit einem optimierten Durchmesser von 1 369,60 m Länge und vorisoliertem industriell isolierten Netz DN 40-300 mit einer Gesamtlänge von 1 369,60 m vor. Rekonstruierte Netze werden mit einer optimierten Flugbahn aufgebaut, die die Gesamtlänge der Netze verringern und eine effizientere Wärmeversorgung ermöglichen wird. (German)
    2 February 2022
    0 references
    Het project „Reconstructie van stadsverwarmingsnetten in het district Utena”, dat voor 2019-2021 is gepland, voorziet in de installatie van nieuwe warmtetoevoernetten met een geoptimaliseerde diameter van 1 369,60 m lang en voorgeïsoleerd industrieel geïsoleerd netwerk DN 40-300 met een totale lengte van 1 369,60 m. Gereconstrueerde netwerken zullen worden gebouwd met een geoptimaliseerd traject, waardoor de totale lengte van de netwerken wordt verkort en een efficiëntere warmtevoorziening wordt geboden. (Dutch)
    2 February 2022
    0 references
    El proyecto «Reconstrucción de redes de calefacción urbana en el distrito de Utena», previsto para 2019-2021, prevé la instalación de nuevas redes de suministro de calor con un diámetro optimizado de 1 369,60 m de largo y red preaislada industrialmente aislada DN 40-300 con una longitud total de 1 369,60 m. Las redes reconstruidas se construirán con una trayectoria optimizada, lo que reducirá la longitud total de las redes y proporcionará un suministro de calor más eficiente. (Spanish)
    3 February 2022
    0 references
    Il progetto "Recostruzione delle reti di teleriscaldamento nel distretto di Utena", previsto per il periodo 2019-2021, prevede l'installazione di nuove reti di alimentazione termica con un diametro ottimizzato di 1 369,60 m di lunghezza e di rete preisolata industrialmente isolata DN 40-300 per una lunghezza totale di 1 369,60 m. Le reti ricostruite saranno costruite con una traiettoria ottimizzata, che ridurrà la lunghezza complessiva delle reti e fornirà un'alimentazione termica più efficiente. (Italian)
    3 February 2022
    0 references
    Projektet "Rekonstruktion af fjernvarmenet i Utena-distriktet", som er planlagt til 2019-2021, omfatter installation af nye varmeforsyningsnet med en optimeret diameter på 1 369,60 m langt og præisoleret industriisoleret net DN 40-300 med en samlet længde på 1 369,60 m. Ombyggede net vil blive bygget med en optimeret bane, som vil reducere nettenes samlede længde og give en mere effektiv varmeforsyning. (Danish)
    19 July 2022
    0 references
    Το έργο «Ανασυγκρότηση δικτύων τηλεθέρμανσης στην επαρχία Utena», το οποίο έχει προγραμματιστεί για την περίοδο 2019-2021, προβλέπει την εγκατάσταση νέων δικτύων παροχής θερμότητας με βελτιστοποιημένη διάμετρο 1 369,60 m και προμονωμένο βιομηχανικό δίκτυο DN 40-300 συνολικού μήκους 1 369,60 m. Τα ανακατασκευασμένα δίκτυα θα κατασκευαστούν με βελτιστοποιημένη τροχιά, η οποία θα μειώσει το συνολικό μήκος των δικτύων και θα παρέχει αποδοτικότερη παροχή θερμότητας. (Greek)
    19 July 2022
    0 references
    Projektom „Rekonstrukcija mreža centraliziranog grijanja u okrugu Utena”, koji je planiran za razdoblje 2019. – 2021., predviđa se postavljanje novih mreža za opskrbu toplinskom energijom s optimiziranim promjerom od 1 369,60 m dugom i prethodno izoliranom industrijsko izoliranom mrežom DN 40 – 300 ukupne duljine 1 369,60 m. Rekonstruirane mreže bit će izgrađene s optimiziranom putanjom, čime će se smanjiti ukupna duljina mreža i osigurati učinkovitija opskrba toplinskom energijom. (Croatian)
    19 July 2022
    0 references
    Proiectul „Reconstrucția rețelelor de termoficare în districtul Utena”, care este planificat pentru 2019-2021, prevede instalarea de noi rețele de alimentare cu energie termică cu un diametru optimizat de 1 369,60 m lungime și o rețea preizolată industrial izolată DN 40-300 cu o lungime totală de 1 369,60 m. Rețelele reconstruite vor fi construite cu o traiectorie optimizată, ceea ce va reduce lungimea totală a rețelelor și va asigura o alimentare cu căldură mai eficientă. (Romanian)
    19 July 2022
    0 references
    Projekt „Rekonštrukcia sietí diaľkového vykurovania v okrese Utena“, ktorý je naplánovaný na roky 2019 – 2021, zabezpečuje inštaláciu nových sietí zásobovania teplom s optimalizovaným priemerom 1 369,60 m a predizolovanou priemyselne izolovanou sieťou DN 40 – 300 s celkovou dĺžkou 1 369,60 m. Rekonštruované siete budú vybudované s optimalizovanou trajektóriou, ktorá zníži celkovú dĺžku sietí a zabezpečí efektívnejšie dodávky tepla. (Slovak)
    19 July 2022
    0 references
    Il-proġett “Bini mill-ġdid ta’ grilji ta’ tisħin distrettwali fid-distrett ta’ Utena”, li huwa ppjanat għall-2019–2021, jipprevedi l-installazzjoni ta’ netwerks ġodda tal-provvista tas-sħana b’dijametru ottimizzat ta’ 1 369.60 m ta’ netwerk twil u iżolat minn qabel u iżolat mill-industrija DN 40–300 b’tul totali ta’ 1 369.60 m. In-netwerks mibnija mill-ġdid se jinbnew bi trajettorja ottimizzata, li se tnaqqas it-tul globali tan-netwerks u tipprovdi provvista tas-sħana aktar effiċjenti. (Maltese)
    19 July 2022
    0 references
    O projeto «Reconstrução de redes de aquecimento urbano no distrito de Utena», previsto para 2019-2021, prevê a instalação de novas redes de fornecimento de calor com um diâmetro otimizado de 1 369,60 m de comprimento e de uma rede pré-isolada industrialmente DN 40-300 com um comprimento total de 1 369,60 m. As redes reconstruídas serão construídas com uma trajetória otimizada, o que reduzirá o comprimento total das redes e proporcionará um fornecimento de calor mais eficiente. (Portuguese)
    19 July 2022
    0 references
    Utenan piirikunnan kaukolämpöverkkojen kunnostamista koskevassa hankkeessa, joka on suunniteltu vuosiksi 2019–2021, on tarkoitus asentaa uusia lämmönsyöttöverkkoja, joiden optimaalinen halkaisija on 1 369,60 m pitkä ja esieristetty teollisesti eristetty DN 40–300 -verkko, jonka kokonaispituus on 1 369,60 m. Rekonstruoidut verkot rakennetaan optimoidulla kehityspolulla, mikä lyhentää verkkojen kokonaispituutta ja tarjoaa tehokkaamman lämmönsaannin. (Finnish)
    19 July 2022
    0 references
    Projekt „Przebudowa sieci ciepłowniczych w dzielnicy Utena”, planowany na lata 2019-2021, przewiduje instalację nowych sieci ciepłowniczych o zoptymalizowanej średnicy 1 369,60 m długości i preizolowanej izolowanej przemysłowo izolowanej sieci DN 40-300 o łącznej długości 1 369,60 m. Zrekonstruowane sieci zostaną zbudowane z optymalną trajektorią, która zmniejszy ogólną długość sieci i zapewni bardziej wydajne dostawy ciepła. (Polish)
    19 July 2022
    0 references
    Projekt „Obnova omrežij za daljinsko ogrevanje v okrožju Utena“, ki je načrtovan za obdobje 2019–2021, predvideva namestitev novih omrežij za oskrbo s toploto z optimiziranim premerom 1 369,60 m, dolgim in predizoliranim industrijsko izoliranim omrežjem DN 40–300 s skupno dolžino 1 369,60 m. Rekonstruirana omrežja bodo zgrajena z optimizirano potjo, ki bo zmanjšala skupno dolžino omrežij in zagotovila učinkovitejšo oskrbo s toploto. (Slovenian)
    19 July 2022
    0 references
    Projekt „Rekonstrukce sítí dálkového vytápění v okrese Utena“, který je plánován na období 2019–2021, předpokládá instalaci nových sítí pro dodávky tepla s optimalizovaným průměrem 1 369,60 m dlouhé a předizolované průmyslové sítě DN 40–300 o celkové délce 1 369,60 m. Rekonstruované sítě budou postaveny s optimalizovanou trajektorií, která zkrátí celkovou délku sítí a zajistí účinnější dodávky tepla. (Czech)
    19 July 2022
    0 references
    2019.–2021. gadā plānotais projekts “centralizētās siltumapgādes tīklu rekonstrukcija Utenas rajonā” paredz jaunu siltumapgādes tīklu uzstādīšanu ar optimizētu diametru 1 369,60 m garu un iepriekš izolētu rūpnieciski izolētu tīklu DN 40–300 ar kopējo garumu 1 369,60 m. Rekonstruētie tīkli tiks būvēti ar optimizētu trajektoriju, kas samazinās tīklu kopējo garumu un nodrošinās efektīvāku siltumapgādi. (Latvian)
    19 July 2022
    0 references
    Проектът „Реконструкция на топлофикационни мрежи в област Утена“, който е планиран за 2019—2021 г., предвижда изграждането на нови топлоснабдителни мрежи с оптимизиран диаметър 1 369,60 m дълга и предварително изолирана индустриално изолирана мрежа DN 40—300 с обща дължина 1369,60 м. Реконструираните мрежи ще бъдат изградени с оптимизирана траектория, която ще намали общата дължина на мрежите и ще осигури по-ефективно топлоснабдяване. (Bulgarian)
    19 July 2022
    0 references
    A 2019–2021-es időszakra tervezett, „A távfűtési hálózatok felújítása az Utena kerületben” elnevezésű projekt új, 1 369,60 m átmérőjű, iparilag szigetelt DN 40–300 hálózat létesítését irányozza elő, amelynek teljes hossza 1 369,60 m. Az átalakított hálózatokat optimalizált pályával építik ki, ami csökkenti a hálózatok teljes hosszát és hatékonyabb hőellátást biztosít. (Hungarian)
    19 July 2022
    0 references
    Leis an tionscadal ‘Atógáil eangacha téimh ceantair i gceantar Utena’, atá beartaithe do 2019-2021, déantar foráil maidir le líonraí nua soláthair teasa a shuiteáil ag a bhfuil trastomhas optamaithe de 1 369.60 m ar fhad agus líonra réamh-inslithe tionsclaíoch DN 40-300 a bhfuil fad iomlán 1 369.60 m acu. Tógfar líonraí athfhoirgnithe le ruthag optamaithe, rud a laghdóidh fad foriomlán na líonraí agus a sholáthróidh soláthar teasa níos éifeachtaí. (Irish)
    19 July 2022
    0 references
    Projektet ”Rekonstruktion av fjärrvärmenät i Utena-distriktet”, som planeras till 2019–2021, omfattar installation av nya värmeförsörjningsnät med en optimerad diameter på 1 369,60 m långa och förisolerade industriisolerade nät DN 40–300 med en total längd på 1 369,60 m. Rekonstruerade nät kommer att byggas med en optimerad bana, vilket kommer att minska nätens totala längd och ge effektivare värmeförsörjning. (Swedish)
    19 July 2022
    0 references
    Utena linnaosa kaugküttevõrkude rekonstrueerimise projektiga, mis on kavandatud aastateks 2019–2021, nähakse ette uute soojusvarustusvõrkude paigaldamine optimeeritud läbimõõduga 1 369,60 m ja eelnevalt isoleeritud tööstuslikult isoleeritud võrgu DN 40–300 kogupikkusega 1 369,60 m. Rekonstrueeritud võrgud ehitatakse optimeeritud trajektooriga, mis vähendab võrkude kogupikkust ja tagab tõhusama soojusvarustuse. (Estonian)
    19 July 2022
    0 references
    Pramonės g. 11, Utena
    0 references

    Identifiers

    04.3.2-LVPA-K-102-06-0001
    0 references