Extension of the water purification plant to the district of Borne Sulinovo (Q137884)

From EU Knowledge Graph
Revision as of 23:50, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Extension of the water purification plant to the district of Borne Sulinovo
Project in Poland financed by DG Regio

    Statements

    0 references
    672,611.42 zloty
    0 references
    161,426.7408 Euro
    13 January 2020
    0 references
    974,538.32 zloty
    0 references
    233,889.19679999998 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    27 November 2015
    0 references
    20 June 2017
    0 references
    PRZEDSIĘBIORSTWO WODOCIĄGÓW I KANALIZACJI SP. Z O.O.
    0 references
    0 references
    Przedsięwzięcie obejmuje rozbudowę stacji wodociągowej w zakresie: posadowienia budynku hali technologicznej w nawiązaniu do istniejących obiektów, rozwiązań technicznych i technologicznych uzdatniania wody, montażu pomp głębinowych i obudów studziennych, instalacji wewnętrznych i zewnętrzne wod-kan, w obrębie działki 89/173, instalacji elektrycznej i AKPiA.Efektem końcowym realizacji projektu będzie poprawa jakości wody oraz zapewnienie ciągłości jej dostawy do mieszkańców miejscowości Borne Sulinowo , Łączno, Ciemino, Jeleń, Jelonek, Przyjezierze, Krągi, Śmiadowo i Dąbrowica. Typy rozwiązań technicznych i technologicznych zostały dostosowane do istniejącego stanu uzbrojeń terenu, ukształtowania terenu i jego aktualnego zagospodarowania. Projekt zakłada budowę nowej hali technologicznej w nawiązaniu do istniejącej w bezpośrednim jej sąsiedztwie, co sprawi maksymalne wykorzystanie terenu i kompaktowość stacji oraz minimalizację połączeń rurociągów. Stacja będzie pracowała w pełni automatycznie, z monitoringiem stanu urządzeń i przesyłem danych do systemu wizualizacji komputerowej w siedzibie eksploatatora. Technologia uzdatniania wody oparta będzie na procesach naturalnych –napowietrzaniu i filtracji, bez dozowania chemikaliów i silnych utleniaczy. Projekt zakłada optymalizację doboru urządzeń w aspekcie techniczno – ekonomicznym oraz oszczędność wody i energii w pracy SUW. (Polish)
    0 references
    The project involves the extension of the water supply station to the extent of: the erection of a technology hall building with reference to existing plants, technical solutions and technological treatment of water, the installation of deep water pumps and well casings, internal and external installations of the water — the water — the project will improve the quality of the water and ensure the continuity of its delivery to the inhabitants of Borne Sulinowo, Łączna, Łączna, Jelenia, Jeleń, Przyjezier, Kągi, śmiadowo and Dąbrowica. The types of technical and technological solutions have been brought into line with the existing state of the site, the terrain and its current development. The project involves the construction of a new technological arena as a follow up to its immediate vicinity, which will make maximum use of the site and compact stations and minimise pipeline connections. The station will work fully automatically with the monitoring of the state of the equipment and the data transmission to the computer visualisation system at the operator’s site. The water treatment technology will be based on natural processes — aerating and filtration without dosing chemicals and strong oxidisers. The project aims to optimise the selection of equipment for technical and economic aspects and the saving of water and energy at the work of the SUW. (English)
    0 references

    Identifiers

    RPZP.03.05.00-32-A006/16
    0 references