The development of co-generation sources of energy in IOM’s Ireneush (Q137830)

From EU Knowledge Graph
Revision as of 23:49, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
The development of co-generation sources of energy in IOM’s Ireneush
Project in Poland financed by DG Regio

    Statements

    0 references
    487,696.0 zloty
    0 references
    117,047.04 Euro
    13 January 2020
    0 references
    693,728.0 zloty
    0 references
    166,494.72 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 March 2019
    0 references
    30 June 2023
    0 references
    IOM IRENEUSZ MUŻ
    0 references
    0 references
    Projekt ma charakter stacjonarny. Realizacja projektu zostanie zlokalizowana w m. Redlica na dz. 93, 72-002 Dobra, Województwo Zachodniopomorskie. Realizacja projektu będzie polegała na budowie wysokosprawnej kogeneracji w budynku która to będzie produkować energię cieplną o mocy ok. 14,7 kW i energię elektryczną o mocy 6 kW na potrzeby własne Wnioskodawcy wraz z bankiem energii o pojemności ok. 20 kWh. Wnioskodawca posiada dokumenty niezbędne do rozpoczęcia realizacji projektu : dokumentację techniczną inwestycji (koncepcja instalacji). Planowana inwestycja nie wymaga pozwolenia na budowę. stałopalna i zastąpiona wysokosprawną koagulacją. ETAPY REALIZACJI PROJEKTU : 1. „Przygotowanie dokumentacji projektu” w tym : opracowanie studium wykonalności. 2. „Budowa instalacji wysokosprawnej kogeneracji”. 3. „Nadzór inwestorski” 4. „Promocja projektu”. (Polish)
    0 references
    The project is stationary. The project will be located in m. 93, 72-002 Good, Zachodniopomorskie Province. The project will consist of the construction of high-efficiency cogeneration in a building which produces heat with a capacity of approx. 14.7 kW and electricity with a capacity of 6 kW for the Applicant’s own requirements together with a energy bank of approx. 20 kWh. The applicant shall have the necessary documents to start the implementation of the project: the technical documentation of the investment (installation concept). The planned investment does not require permission for construction work. THE PHASES OF THE IMPLEMENTATION OF THE PROJECT: 1. “Preparation of project documentation”, including: development of a feasibility study. 2. ‘Construction of a high-efficiency cogeneration installation’. 3. “Investment Supervision” 4. “Design promotion”. (English)
    0 references

    Identifiers

    RPZP.02.12.00-32-B001/19
    0 references