Construction of the hub in the city of Abuses with a bus loop (Q137545)

From EU Knowledge Graph
Revision as of 23:45, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the hub in the city of Abuses with a bus loop
Project in Poland financed by DG Regio

    Statements

    0 references
    2,700,000.0 zloty
    0 references
    648,000.0 Euro
    13 January 2020
    0 references
    3,796,854.25 zloty
    0 references
    911,245.02 Euro
    13 January 2020
    0 references
    72.7 percent
    0 references
    2 July 2018
    0 references
    28 June 2019
    0 references
    GMINA GOLENIÓW
    0 references
    Inwestycja zakłada budowę Centrum Przesiadkowego (CP) przy ul. Leśnej i Lubczyńskiej w Załomiu z zagospodarowaniem terenu i infrastrukturą techn. Zakres rzeczowy obejmuje m.in. budowę obiektu obsługi podróżnych (z poczekalnią, pokojem kierowców i toaletami) wraz z zadaszonym przejściem na perony i wiatami przystankowymi. W ramach prac w branży drogowej w CP powstanie plac manewrowy dla autobusów, P&R na 60 poj., (w tym 3 miejsca dla os. niepełnosprawnych), B&R na 18 rowerów oraz ścieżka pieszo-rowerowa i dojścia piesze do budynku obsługi. Poza tym powstaną przyłącza: wod-kan. i instalacje zewn.: wodna, kanalizacji san., elektryczna, teletechniczna i telekomunikacyjna oraz kanalizacja deszcz. Teren będzie oświetlony i monitorowany, a jako koszt NKW powstanie plac zabaw. (Polish)
    0 references
    The investment involves the construction of a neighbouring centre (CP) at ul. Forestry and Lubuskie Province in the fitting-out of land and infrastructure. The material scope includes, but is not limited to, the construction of a travel facility (with a waiting room, driver peace and toilets), together with a covered switch to platforms and shelters. In order to work in the road sector, CP will establish a manoeuvring area for buses, P & R at 60 disp., including 3 seats for disabled persons, B & R per 18 cycles, and a pedestrian and cycling path and walking to the user building. In addition, the following connections will be created: waterfront and external facilities: water, the sewerage system concerned, the electrical, telecommunications and telecommunications systems and the drainage of rain. The site will be illuminated and monitored and, as a cost of the NKW, a playground will be created. (English)
    0 references

    Identifiers

    RPZP.02.02.00-32-0002/17
    0 references