Construction of 2 micro-PV by ZPD Piotr Żemojtel. (Q132002)

From EU Knowledge Graph
Revision as of 23:30, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of 2 micro-PV by ZPD Piotr Żemojtel.
Project in Poland financed by DG Regio

    Statements

    0 references
    405,501.0 zloty
    0 references
    97,320.23999999999 Euro
    13 January 2020
    0 references
    587,398.8 zloty
    0 references
    140,975.712 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 March 2018
    0 references
    29 June 2018
    0 references
    ZAKŁAD PRZEMYSŁU DRZEWNEGO PIOTR ŻEMOJTEL ZAKŁAD PRODUKCYJNY W GODKOWIE
    0 references
    0 references

    54°4'51.2"N, 19°54'11.5"E
    0 references
    Inwestycja polega na zakupie i montażu 2 elektrowni fotowoltaicznych o łącznej mocy 79,51kW. Będzie ona realizowana w jednej lokalizacji w Godkowie 43 na działce 88/3 o mocy 39,75 kW i działce 88/15 o 39,76 kW. Instalacje zajmą do 250 m2 powierzchni dachu każda. Projekt wpisuje się w typ projektu wymieniony w SzOOP dla działania 4.1 - instalacji wykorzystujących energię słońca - do 2 MWe/MWth. Instalacja zgodnie z możliwością opisaną w SzOOP będzie służyła potrzebom własnym przedsiębiorstwa i będzie podłączona do sieci, jednakże ze względu na moc instalacji (do 40 kW) zgodnie z art. 5 ustawy o odnawialnych źródłach energii (Dz.U. 2015) oraz Art. 7 ust. 8d ze znaczkiem 4-9 ustawy – Prawo energetyczne (Dz.U.1997) będzie ona dokonywana na podstawie zgłoszenia bez konieczności posiadania przez beneficjenta ważnych technicznych warunków przyłączenia wszystkich ujętych w projekcie źródeł wytwarzania energii do sieci elektroenergetycznej. Wnioskodawca posiada obecnie przyłącze gdzie moc umowna wynosi 250 kW – działka 88/3 oraz 40kW-działka 88/15. Projekt spełnia wszystkie warunki brzegowe określone w SzOOP. Inwestycja polega na montażu: działka 88/3-150 szt paneli polikrystalicznych, działka 88/15-150 szt paneli polikrystalicznych połączonych w samodzielne układy wraz z falownikami i z niezbędnym okablowaniem i osprzętem. Elektrownie będą podłączone do sieci, natomiast nie będzie potrzeby instalowania akumulatorów oraz regulatorów ładowania, ponieważ sieć jest w stanie przyjąć całą energię wyprodukowaną przez systemy fotowoltaiczne. Wyprodukowana energia elektryczna będzie wykorzystywana bezpośrednio na potrzeby własne a ewentualna nadwyżka będzie wprowadzana do sieci. (Polish)
    0 references
    The investment consists of the purchase and installation of 2 photovoltaic plants with a total power output of 79.51 kW. It will be carried out in a single location in Godkowo 43 on plot 88/3, with a power of 39.75 kW and a plot of 88/15 by 39.76 kW. Installations will be taken up to 250 m² of roof. The project is part of the project type referred to in SzOOP for Measure 4.1 — Sun-power plants — up to 2 MWe/MWth. The installation as described in the SzooP will serve the needs of its own business and be connected to the network, but due to the power of the installation (up to 40 kW) in accordance with Article 5 of the Renewable Energy Act (OJ 2015) and Article 7 para. 8d with 4-9 of the Act — Energy Law (Journal of Laws 1997), will be made on the basis of a notification without the beneficiary having to have a valid technical connection for all the energy sources included in the project. The applicant currently has a connection in which the contractual power is 250 kW — parcel 88/3 and 40 kW-parcel 88/15. The project meets all boundary conditions laid down in the SzOOP. The investment consists of the installation of: parcel 88/3-150 of the polycrystalline panels, parcel 88/15-150, polycrystalline panels combined into separate circuits with inverters and the necessary cabling and fittings. Power plants will be connected to the grid and there will be no need to install batteries and recharging regulators as the network is able to absorb all the energy produced by solar photovoltaic systems. The electricity produced will be used directly for own account and any surplus would be fed into the grid. (English)
    0 references

    Identifiers

    RPWM.04.01.00-28-0411/16
    0 references