Managing the banks of the river Łyny from the bridge at ul. Olsztyńska to the bridge at ul. Korpernika in Lidzka WarMinsk (Q132619)

From EU Knowledge Graph
Revision as of 23:23, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Managing the banks of the river Łyny from the bridge at ul. Olsztyńska to the bridge at ul. Korpernika in Lidzka WarMinsk
Project in Poland financed by DG Regio

    Statements

    0 references
    4,093,265.5 zloty
    0 references
    982,383.72 Euro
    13 January 2020
    0 references
    5,601,755.49 zloty
    0 references
    1,344,421.3176 Euro
    13 January 2020
    0 references
    76.5 percent
    0 references
    10 June 2014
    0 references
    31 December 2017
    0 references
    GMINA MIEJSKA LIDZBARK WARMIŃSKI
    0 references
    0 references

    54°7'50.2"N, 20°33'53.6"E
    0 references
    Przedmiotem projektu jest wykorzystanie lokalnych zasobów przyrodniczych, Obszaru Chronionego Krajobrazu Dolina Dolnej Łyny w celu zagospodarowania przestrzeni na cele turystyczno-rekreacyjne, wzmacniające utrzymanie przewagi konkurencyjnej Warmii i Mazur nad innymi regionami w oparciu o zasoby dziedzictwa naturalnego Lidzbarka Warmińskiego co jest zgodne z SZOOP. W ramach projektu zaplanowano-prace przygotowawcze studium wykonalności, nadzór, roboty bud.( zagospodar. przeciwpowodziowe rzeki Łyny, zieleń, plac zabaw, monitoring, tablice dydaktyczne, wejście na Bulwar, udrożnienie istniejących cieków wodnych, ciągi piesze, schody skarpowe, fontanna, dwa boiska do gry w bule, miejsca wypoczynku na trawie, palenisko, pochylnia, widownia - niekwalf., toalety, mała architektura, oświetlenie), posągi, promocja. Po realizacji projektu, kompleksowo zagospodarowane brzegi Łyny w centrum miasta Lidzbark Warmiński sprawią, że przestrzeń ta nabierze dużego znaczenia w zakresie rekreacji i wypoczynku i stanie się wizytówką miasta, co przełoży się na wzrost oczekiwanej liczby odwiedzin. Sposób wdrażania projektu: - Burmistrz Lidzbarka Warmińskiego – zarządza proj. - Z-ca Burmistrza - kontrolujący realizację proj. - Koordynator projektu - odpowiedzialność merytoryczna i ?nansowa za postęp realizacji projektu, nadzór i ocena pracy, nadzór nad sprawozdaniami i rozliczeniami ?nansowymi, bieżący kontakt z IZ - Skarbnik Miasta – odpowiedzialność i nadzór nad budżetem projektu i pracą Referatu Finansowego - Kier. Referatu Gospodarki Kom. i Inwestycji - odpowiada za przetargi, współpracę z wykonawcami robót i usług, sporządzanie protokołów - Kier.Referatu gospodarki Kom. i Inwestycji – odpowiada za dokumentację i kontakty z IZ, promocję projektu, sprawdza poziom osiąganych wskaźników projektu - Nadzór w projekcie-Inżynier Kontraktu - nadzór techniczny nad robotami budowlanymi i ich jakością, nadzór nad całością dokumentacji sporządzanej przez wykonawcę (Polish)
    0 references
    The project focuses on the use of local natural resources, a protected area of the Lower Town Valley of Lower Łyny Valley in order to develop tourist and recreation areas, strengthening the maintenance of the competitive advantage of the Warmia and Mazury region, based on the natural heritage of the Lidzka WarMinsk natural heritage, which is in line with the SZOOP. The project has planned preparatory work for feasibility studies, surveillance, budget works (flood-related river basins, green, playground, monitoring, didactic charts, bulbar entrance, the introduction of existing water courses, strings, stairs, turbot, fountain, two pitches for the game in the bulbs, leisure places on grass, palette, slipway, audience — the kwalf., toilets, small architecture, lighting), statues, promotion. Once the project has been carried out, the complex of the town of Lizshoulder Warmiński in the city centre will make it very important for recreation and leisure and will become the city’s visiting card, which will translate into an increase in the number of visits. How to implement the project: — Burmistrz Lidzka WarMinsk — manage Proj. — Deputy Mayor — controlling the implementation of Proj. Project coordinator — content-related responsibility and financial responsibility for the progress of the project, supervision and evaluation of work, supervision of reports and reports? annansu, ongoing contact with the MA — Tax of the City — responsibility and supervision of the project budget and the work of the Financial Department — Kier. Department of Economic Affairs and Investments — responsible for tendering, cooperation with contractors for works and services, drafting of minutes — The Ministry of the Economy and Investment — responsible for documentation and contacts with the MA, promotion of the project, checks on the level of performance of the project indicators — Supervision in the project engineer for technical supervision of construction works and their quality, supervision of the entire documentation prepared by the developer. (English)
    0 references

    Identifiers

    RPWM.06.02.03-28-0001/16
    0 references