Thermal modernisation of educational establishments in the city of Poznan (Q134841)

From EU Knowledge Graph
Revision as of 23:12, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of educational establishments in the city of Poznan
Project in Poland financed by DG Regio

    Statements

    0 references
    12,700,062.55 zloty
    0 references
    3,048,015.012 Euro
    13 January 2020
    0 references
    25,390,510.65 zloty
    0 references
    6,093,722.556 Euro
    13 January 2020
    0 references
    59.05 percent
    0 references
    30 March 2017
    0 references
    31 December 2019
    0 references
    MIASTO POZNAŃ
    0 references
    0 references
    Przedmiotem projektu jest termomodernizacja 8 placówek oświatowych na terenie Miasta Poznania:S.Podstawowa nr 61,ul.Szczepankowo72a, S.Podstawowa nr 2,os.Jagiellońskie 128,Szkoły Podstawowej nr 20,os.Rzeczpospolitej 44,Zespołu Szkół Mechanicznych, ul. Świerkowa 8, Szkoły Podstawowej nr 70,ul.Piękna 37,Zespół Szkół nr 2,ul. Hangarowa 14,Zespołu Szkół Specjalnych nr105, ul.Nieszawska 21 oraz Szkoły Podstawowej nr 46,ul.Inowrocławska 19. Plan. w ramach projek termomod. istn.obiektów oświat. zakłada: izolację ścian zewnętrznych, podłóg i stropodachów warstwą wełny mineralnej, wymianę stolarki drzwiowej i okiennej oraz modernizację instalacji c.o., wymianę kotłowni. Projekt ten,łącznie obejm. kompleks prace związane z term szkół, w tym m.in:demontaż starych elementów, ocieplenie przegród zewnętrznych (w tym stropów, ścian, stropodachów i dachów), ocieplenie podłogi przy gruncie,modernizację i usprawnienie wentylacji naturalnej pomieszczeń, instalację/modernizacje wentylacji mechanicznej, z wysokosprawnym odzyskiem ciepła (i w przypadku ZSM im. KEN – pompą ciepła). wymianę okien i drzwi,modernizację instalacji centralnego ogrzewania, usprawnienie dotyczące zmniejszenia strat przez przenikanie przez przegrody budowlane oraz zmniejszenie strat na podgrzanie powietrza wentylacyjnego,wymianę nieefektywnych i nieekologicznych źr.ciepła na ekologiczne kotły gazowe.Ponadto wymianie podlegać będzie także oświetlenie wewnętrzne w 6 obiektach, instalacja grzewcza, instalacja ciepłej wody użytkowej i wentylacja z wysokosprawnym odzyskiem ciepła oraz z pompą ciepła. W skład kosztów kwalifik wchodzą również koszty nadzoru inwestorskiego i promocji proj.Dodatkowo, w ramach kosztów niekwalifikowalnych, inwestycja obejmuje zagosp. terenu wokół budyn(m.in.przebudowa zjazdów i dróg wewnętrznych, budowę wiaty na odpady stałe). Wskaźnik produktu to liczba zmodernizowanych energet.budynków - 1(2018) i 7(2019) i Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE-1 szt w 2018 r (Polish)
    0 references
    The project is a thermal modernisation of 8 educational establishments in the city of Poznań: s.Primary No 61, ul.Szczepant72a, S.Basic 2, Jagiellońskiego 128, Primary School No. 20, os. Rzeczpospolita No. 44, os.Rzeczpospolita, ul. ul. Świerkowa 8, Primary School No. 70, ul.Piękny 37, Team of Governors 2, ul. HANGAROVA 14, Special Schools Group No105, ul.Niaszewska 21 and Primary School No 46,. Inowrocław 19. Design as part of a thermo-fashion array of educational facilities: insulation of the walls, floors and costumes of mineral wool, replacement of doors and window frames and modernisation of the heating system, replacement of boiler rooms. This project, including the in:demontaż old elements, the layout of the school term, including old elements, the insulation of building envelope (including ceilings, walls, roof and roof), the insulation of the building envelope (including ceilings, walls, roof and roof), the insulation of the floor space, the modernisation and improvement of the ventilation of the natural space, the installation/modernisation of mechanical ventilation, the replacement of windows and doors, modernisation of the central heating system, the improvement of the reduction of losses by building divisions and the reduction of losses for ventilation air heating, replacement of inefficient and non-organic heat into ventilation air, the replacement of inefficient and non-organic heat from the price of the ventilation of ventilation air, the replacement of inefficient and non-organic heat into ventilation air. furthermore, the exchange will also be subject to an internal lighting in 6 facilities, the heating system, the installation of hot water and ventilation with highly efficient heat recovery and heat pump equipment. The eligible costs include investment supervision and promotion costs. in addition, in the framework of ineligible costs, the investment covers the area around budyn (m.in.conversion of exits and internal roads, construction of solid waste). Output indicator is the number of modernised energy buildings — 1 (2018) and 7 (2019) and Number of heat generation units built from OZE-1 in 2018 (English)
    0 references

    Identifiers

    RPWP.03.02.03-30-0010/16
    0 references