Revitalisation of railway lines 140/169/179/885/138 connection: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim (Q2713449)

From EU Knowledge Graph
Revision as of 18:52, 7 October 2024 by DG Regio (talk | contribs) (‎Set a claim value: summary (P836): O projeto tem por objeto a preparação da documentação de pré-conceção e conceção necessária para a execução do projeto «Regeneração das linhas ferroviárias n.o 140/169/179/885/138 da ligação: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim (em inglês). A documentação do projeto abrangerá o âmbito dos trabalhos, repartidos pelas seguintes secções: 1: LK 140 Katowice Ligota-Nędza, estação de Orzesze Jaśkowice, via n.o 1, do km 21,349 ao...)
Jump to navigation Jump to search
Project Q2713449 in Poland
Language Label Description Also known as
English
Revitalisation of railway lines 140/169/179/885/138 connection: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim
Project Q2713449 in Poland

    Statements

    0 references
    11,281,426.0 zloty
    0 references
    2,707,542.2 Euro
    0 references
    13,272,266.0 zloty
    0 references
    3,185,343.8 Euro
    0 references
    85.0 percent
    0 references
    24 February 2017
    0 references
    30 November 2023
    0 references
    PKP POLSKIE LINIE KOLEJOWE SPÓŁKA AKCYJNA
    0 references

    50°16'43.0"N, 19°7'35.0"E
    0 references
    Przedmiotem Projektu jest przygotowanie dokumentacji przedprojektowej i projektowej niezbędnej do realizacji przedsięwzięcia „Rewitalizacji linii kolejowych nr 140/169/179/885/138 połączenia: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-Nowy Bieruń-Oświęcim. Dokumentacja projektowa dotyczyć będzie zakresu prac w podziale na następujące odcinki: 1: LK nr 140 Katowice Ligota-Nędza, stacja Orzesze Jaśkowice, tor nr 1 od km 21.349 do km 22.234 o dł. 0,885 km, LK nr 169 Tychy-Orzesze Jaśkowice tor nr 1 od km 0,549 do km 17,484 o dł. 16,935 km.2: LK nr 169 Tychy-Orzesze Jaśkowice, stacja Tychy, tor nr 1 od km -0,246 do km 0,549 o dł. 0,795 km, LK nr 179 Tychy-Lędziny-Mysłowice Kosztowy od km 0,647 do km 12,250 o dł. 11,603 km.3: LK nr 179 Tychy-Lędziny-Mysłowice Kosztowy od km 12,250 do km 14,560 o dł. 2,310 km, LK nr 885 Nowy Bieruń – KWK Piast – podg. Baraniec od km 0,00 do km 5,603 o dł. 5,603 km, LK nr 138 Oświęcim – Nowy Bieruń od km 0,525 do km 4,484 o dł. 3,959 km. (Polish)
    0 references
    The subject of the project is the preparation of the pre-design and design documentation necessary for the implementation of the project "Regeneration of railway lines No 140/169/179/885/138 of the connection: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. The project documentation will cover the scope of work broken down into the following sections: 1: LK 140 Katowice Ligota-Nędza, Orzesze Jaśkowice station, track no. 1 from km 21.349 to km 22.234 l. 0.885 km, LK No 169 Tychy-Orzesze Jaśkowice track no. 1 from km 0.549 to km 17,484 d. 16,935 km.2: LK 169 Tychy-Orzesze Jaśkowice, Tychy station, track no. 1 from km -0.246 to km 0.549, long. 0.795 km, LK No 179 Tychy-Lędziny-Mysłowice Cost from km 0.647 to km 12,250 l. 11,603 km.3: LK No 179 Tychy-Lędziny-Mysłowice Cost from km 12,250 to km 14.560 2,310 km, LK no. 885 Nowy Bieruń – KWK Piast – podg. Baraniec from km 0.00 to km 5,603 d. 5,603 km, LK No 138 Oświęcim – Nowy Bieruń from km 0.525 to 4,484 km long. 3,959 km. (English)
    8 July 2021
    0.1917414829229355
    0 references
    Le projet a pour objet la préparation de la documentation de préconception et de conception nécessaire à la mise en œuvre du projet «Rénovation des lignes de chemin de fer no 140/169/179/885/138 raccordement: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. La documentation du projet portera sur la portée des travaux, ventilée en sections suivantes: 1: LK no 140 Katowice Ligota-Nędza, gare d’Orzesze Jaśkowice, voie no 1 du km 21 349 au km 22 234 de longueur. 0,885 km, LK No 169 Tychy-Orzesze Jaśkowice piste no 1 du km 0,549 au km 17 484 en longueur. 16 935 km.2: LK no 169 Tychy-Orzesze Jaśkowice, station de Tychy, voie no 1 du km -0,246 au km 0,549 en longueur. 0,795 km, LK No 179 Tychy-Lędziny-Mysłowice Coût du km 0,647 au km 12.250 en longueur. 11 603 km.3: LK No 179 Tychy-Lędziny-Mysłowice Coût du km 12 250 au km 14.560 en longueur. 2,310 km, LK No 885 Nowy Bieruń — KWK Piast — podg. Baraniec de 0,00 au km 5 603 en longueur. 5,603 km, LK No 138 Oświęcim — Nowy Bieruń de 0,525 km à 4 484 km de long. 3 959 km. (French)
    4 December 2021
    0 references
    Gegenstand des Projekts ist die Vorbereitung der für die Durchführung des Projekts „Revitalisierung der Eisenbahnstrecken Nr. 140/169/179/885/138 Anschluss: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. Die Projektdokumentation wird den Umfang der Arbeiten betreffen, aufgeschlüsselt in die folgenden Abschnitte: 1: Lk Nr. 140 Kattowitz Ligota-Nędza, Bahnhof Orzesze Jaśkowice, Gleis Nr. 1 von km 21,349 bis km 22.234 nach Länge. 0,885 km, LK Nr. 169 Tychy-Orzesze Jaśkowice Gleis Nr. 1 von km 0,549 bis km 17,484 nach Länge. 16,935 km,2: Lk Nr. 169 Tychy-Orzesze Jaśkowice, Bahnhof Tychy, Gleis Nr. 1 von km -0.246 bis km 0,549 nach Länge. 0,795 km, LK Nr. 179 Tychy-Lędziny-Mysłowice Kosten von km 0,647 bis km 12,250 nach Länge. 11,603 km.3: Lk Nr. 179 Tychy-Lędziny-Mysłowice Kosten von km 12,250 bis km 14.560 nach Länge. 2,310 km, LK Nr. 885 Nowy Bieruń – KWK Piast – podg. Baraniec von km 0,00 bis km 5,603 nach Länge. 5,603 km, LK Nr. 138 Oświęcim – Nowy Bieruń von 0,525 km bis 4,484 km lang. 3,959 km. (German)
    16 December 2021
    0 references
    Het onderwerp van het project is de voorbereiding van de voorontwerp- en ontwerpdocumentatie die nodig is voor de uitvoering van het project „Revitalisering van spoorlijnen nr. 140/169/179/885/138-verbinding: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. De projectdocumentatie zal betrekking hebben op het toepassingsgebied van de werkzaamheden, uitgesplitst in de volgende onderdelen: 1: LK No. 140 Katowice Ligota-Nędza, station Orzesze Jaśkowice, spoor nr. 1 van km 21,349 tot km 22.234 door lengte. 0,885 km, LK nr. 169 Tychy-Orzesze Jaśkowice spoor nr. 1 van km 0,549 tot km 17.484 door lengte. 16,935 km.2: LK nr. 169 Tychy-Orzesze Jaśkowice, station Tychy, spoor nr. 1 van km -0.246 tot km 0,549 door lengte. 0,795 km, LK nr. 179 Tychy-Lędziny-Mysłowice Kosten van km 0,647 tot km 12.250 door lengte. 11,603 km.3: Lk No. 179 Tychy-Lędziny-Mysłowice Kosten van km 12,250 tot km 14.560 door lengte. 2,310 km, LK nr. 885 Nowy Bieruń — KWK Piast — podg. Baraniec van km 0,00 tot km 5,603 door lengte. 5,603 km, LK nr. 138 Oświęcim — Nowy Bieruń van 0,525 km tot 4,484 km lang. 3,959 km. (Dutch)
    18 December 2021
    0 references
    Oggetto del Progetto è la preparazione della documentazione di pre-progettazione e progettazione necessaria per l'attuazione del progetto "Rivitalizzazione delle linee ferroviarie n. 140/169/179/885/138: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. La documentazione del progetto riguarderà la portata dell'opera, suddivisa nelle seguenti sezioni: 1: LK No. 140 Katowice Ligota-Nędza, stazione di Orzesze Jaśkowice, pista n. 1 da km 21,349 a km 22.234 per lunghezza. 0,885 km, LK No. 169 Tychy-Orzesze Jaśkowice pista n. 1 da km 0,549 a km 17.484 per lunghezza. 16,935 km.2: LK No. 169 Tychy-Orzesze Jaśkowice, stazione di Tychy, pista n. 1 da km -0,246 a km 0,549 per lunghezza. 0,795 km, LK No. 179 Tychy-Lędziny-Mysłowice Costo da km 0,647 a km 12.250 per lunghezza. 11,603 km.3: LK No. 179 Tychy-Lędziny-Mysłowice Costo da km 12,250 a km 14.560 per lunghezza. 2,310 km, LK No. 885 Nowy Bieruń — KWK Piast — podg. Baraniec da km 0,00 a km 5.603 per lunghezza. 5,603 km, LK No. 138 Oświęcim — Nowy Bieruń da 0,525 km a 4,484 km di lunghezza. 3,959 km. (Italian)
    15 January 2022
    0 references
    El objeto del proyecto es la preparación de la documentación de prediseño y diseño necesaria para la ejecución del proyecto «Revitalización de las líneas ferroviarias n.º 140/169/179/885/138 conexión: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. La documentación del proyecto se referirá al alcance del trabajo, desglosado en las siguientes secciones: 1: Lk N.º 140 Katowice Ligota-Nędza, estación Orzesze Jaśkowice, vía N.º 1 desde el km 21,349 hasta km 22.234 por longitud. 0,885 km, LK N.º 169 Tychy-Orzesze Jaśkowice vía N.º 1 desde km 0.549 hasta km 17.484 por longitud. 16,935 km.2: Lk N.º 169 Tychy-Orzesze Jaśkowice, estación de Tychy, vía N.º 1 desde km -0,246 a km 0.549 por longitud. 0,795 km, LK N.º 179 Tychy-Lędziny-Mysłowice Coste de km 0,647 a km 12.250 por longitud. 11,603 km.3: Lk N.º 179 Tychy-Lędziny-Mysłowice Coste de km 12.250 a km 14,560 por longitud. 2,310 km, LK N.º 885 Nowy Bieruń — KWK Piast — podg. Baraniec de km 0.00 a km 5,603 por longitud. 5,603 km, LK N.º 138 Oświęcim — Nowy Bieruń de 0,525 km a 4,484 km de largo. 3,959 km. (Spanish)
    19 January 2022
    0 references
    Projekti teemaks on projekti „Raudteeliinide taaselustamine nr 140/169/179/885/138: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. Projekti dokumentatsioon käsitleb töö ulatust, jaotatuna järgmisteks osadeks: 1: Katowice Ligota-Nędza, Orzesze Jaśkowice jaama nr 140, rööbastee nr 1 pikkusest 21,349 kilomeetrini 22.234. 0,885 km, LK nr 169 Tychy-Orzesze Jaśkowice tee nr 1 pikkusest 0,549 km kuni 17 484 kilomeetrini. 16 935 km,2: Lk nr 169 Tychy-Orzesze Jaśkowice, Tychy jaam, rööbastee nr 1 kilomeetrist -0,246 kuni 0,549 kilomeetrini pikkuse järgi. 0,795 km, LK nr 179 Tychy-Lędziny-Mysłowice kulud kilomeetrist 0,647 kuni 12 250 km pikkuseni. 11 603 km.3: Lk nr 179 Tychy-Lędziny-Mysłowice kulud 12 250 kilomeetrist kuni 14.560 kilomeetrini pikkusega. 2,310 km, LK No. 885 Nowy Bieruń – KWK Piast – podg. Baraniec 0,00 km kuni 5,603 pikkuseni. 5,603 km, LK nr 138 Oświęcim – Nowy Bieruń alates 0,525 km kuni 4 484 km pikk. 3,959 km. (Estonian)
    28 July 2022
    0 references
    Projekto objektas – parengti projekto „Geležinkelių linijų Nr. 140/169/179/885/138 jungties atgaivinimas: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. Projekto dokumentai bus susiję su darbo apimtimi, suskirstyta į šiuos skirsnius: 1: Lk No. 140 Katowice Ligota-Nędza, Orzesze Jaśkowice stotis, kelio Nr. 1 nuo 21,349 km iki 22,234 pagal ilgį. 0,885 km, LK Nr. 169 Tychy-Orzesze Jaśkowice trasa Nr. 1 nuo 0,549 km iki 17,484 pagal ilgį. 16,935 km.2: Lk Nr. 169 Tychy-Orzesze Jaśkowice, Tychy stotis, kelio Nr. 1 nuo -0,246 km iki 0,549 ilgio. 0,795 km, LK Nr. 179 Tychy-Lędziny-Mysłowice Kaina nuo 0,647 km iki 12 250 pagal ilgį. 11 603 km.3: Lk Nr. 179 Tychy-Lędziny-Mysłowice Kaina nuo km 12.250 iki 14,560 pagal ilgį. 2,310 km, LK No. 885 Nowy Bieruń – KWK Piast – podg. Baraniec nuo 0,00 km iki 5,603 pagal ilgį. 5,603 km, LK Nr. 138 Oświęcim – Nowy Bieruń nuo 0,525 km iki 4,484 km ilgio. 3 959 km. (Lithuanian)
    28 July 2022
    0 references
    Predmet projekta je izrada predprojektne i projektne dokumentacije potrebne za provedbu projekta „Revitalizacija željezničkih pruga br. 140/169/179/885/138: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-Novi Bieruń-Oświęcim. Projektna dokumentacija odnosit će se na opseg radova, podijeljen na sljedeće odjeljke: 1: Lk No. 140 Katowice Ligota-Nędza, stanica Orzesze Jaśkowice, staza br. 1 od km 21,349 do km 22,234 po dužini. 0,885 km, LK br. 169 Tychy-Orzesze Jaśkowice staza br. 1 od km 0,549 do km 17.484 po dužini. 16,935 km.2: LK No. 169 Tychy-Orzesze Jaśkowice, stanica Tychy, staza br. 1 od km -0,246 do km 0,549 po dužini. 0,795 km, LK br. 179 Tychy-Lędziny-Mysłowice Trošak od km 0,647 na km 12,250 po duljini. 11,603 km.3: Lk No. 179 Tychy-Lędziny-Mysłowice Trošak od km 12,250 do km 14.560 po duljini. 2,310 km, LK br. 885 Nowy Bieruń – KWK Piast – mahuna. Baraniec od km 0,00 do km 5.603 po dužini. 5,603 km, LK br. 138 Oświęcim – Nowy Bieruń od 0,525 km do 4,484 km. 3,959 km. (Croatian)
    28 July 2022
    0 references
    Αντικείμενο του Έργου είναι η προετοιμασία της τεκμηρίωσης προσχεδιασμού και μελέτης που απαιτείται για την υλοποίηση του έργου «Αναζωογόνηση σιδηροδρομικών γραμμών αρ. 140/169/179/885/138 σύνδεση: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. Η τεκμηρίωση του έργου θα αφορά το πεδίο των εργασιών, κατανεμημένη στις ακόλουθες ενότητες: 1: Lk No. 140 Katowice Ligota-Nędza, σταθμός Orzesze Jaśkowice, πίστα αριθ. 1 από το χιλιόμετρο 21.349 σε km 22.234 κατά μήκος. 0,885 km, LK No. 169 Tychy-Orzesze Jaśkowice διαδρομή Νο 1 από km 0.549 σε km 17.484 από το μήκος. 16,935 km.2: Lk No. 169 Tychy-Orzesze Jaśkowice, σταθμός Tychy, διαδρομή Νο 1 από το km -0.246 σε km 0.549 από το μήκος. 0,795 km, LK No. 179 Tychy-Lędziny-Mysłowice Κόστος από km 0.647 έως km 12.250 κατά μήκος. 11,603 km.3: Lk αριθ. 179 Tychy-Lędziny-Mysłowice Κόστος από 12.250 έως km 14,560 κατά μήκος. 2,310 km, LK No. 885 Nowy Bieruń — KWK Piast — podg. Baraniec από km 0.00 έως km 5.603 από το μήκος. 5.603 χλμ, LK No. 138 Oświęcim — Nowy Bieruń από 0,525 χλμ έως 4.484 χλμ. 3.959 χλμ. (Greek)
    28 July 2022
    0 references
    Predmetom projektu je príprava predbežnej projektovej a projektovej dokumentácie potrebnej na realizáciu projektu „Revitalizácia železničných tratí č. 140/169/179/885/138: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. Projektová dokumentácia sa bude týkať rozsahu prác rozdelených do týchto oddielov: 1: Lk 140 Katowice Ligota-Nędza, Orzesze Jaśkowice stanica, trať č. 1 od km 21 349 do km 22 234 po dĺžke. 0,885 km, LK č. 169 Tychy-Orzesze Jaśkowice trať č. 1 od km 0,549 do km 17,484 po dĺžke. 16 935 km.2: Lk č. 169 Tychy-Orzesze Jaśkowice, stanica Tychy, trať č. 1 od km -0,246 do km 0,549 podľa dĺžky. 0,795 km, LK č. 179 Tychy-Lędziny-Mysłowice Náklady od km 0,647 do km 12 250 po dĺžke. 11,603 km.3: Lk č. 179 Tychy-Lędziny-Mysłowice Náklady od km 12 250 do km 14 560 po dĺžke. 2 310 km, LK č. 885 Nowy Bieruń – KWK Piast – podg. Baraniec od km 0.00 do km 5,603 po dĺžke. 5,603 km, LK 138 Oświęcim – Nowy Bieruń od 0,525 km do 4,84 km dlhé. 3 959 km. (Slovak)
    28 July 2022
    0 references
    Hankkeen aiheena on esisuunnittelu- ja suunnitteludokumentaatiot, joita tarvitaan rautatieyhteyksien elvyttämistä koskevan hankkeen 140/169/179/885/138 toteuttamiseksi: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. Hanke-asiakirjat koskevat työn laajuutta, ja ne on jaoteltu seuraaviin osiin: 1: Lk No. 140 Katowice Ligota-Nędza, Orzesze Jaśkowicen asema, rata nro 121,349 km pituudeltaan 22,234 km. 0,885 km, LK No. 169 Tychy-Orzesze Jaśkowice rata nro 10,549 km pituudeltaan 17 484 km. 16,935 km.2: Lk No. 169 Tychy-Orzesze Jaśkowice, Tychyn asema, rata nro 1 km -0,246 km pituudeltaan 0,549 km. 0,795 km, LK No. 179 Tychy-Lędziny-Mysłowice Kustannukset 0,647 km – 12 250 km pituudeltaan. 11,603 km.3: LK No. 179 Tychy-Lędziny-Mysłowice Hinta 12,250 km – 14 560 km pituuden mukaan. 2,310 km, LK No. 885 Nowy Bieruń – KWK Piast – podg. Baraniec pituus 0,00 km – km 5,603. 5 503 km, LK No. 138 Oświęcim – Nowy Bieruń 0,525 km – 4,484 km pitkä. 3,959 km. (Finnish)
    28 July 2022
    0 references
    A projekt tárgya „A 140/169/179/885/138. sz. vasútvonal felújítása” projekt megvalósításához szükséges előzetes tervezési és tervezési dokumentáció elkészítése: Játsszd a Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim játékot. A projektdokumentáció a munka terjedelmére vonatkozik, a következő szakaszokra bontva: 1: Lk No. 140 Katowice Ligota-Nędza, Orzesze Jaśkowice állomás, 1 pálya a 21,349 km-től 22,234 km hosszúságig. 0,885 km, LK No. 169 Tychy-Orzesze Jaśkowice pálya No. 1 km 0,549 és 17,484 km hossza. 16,935 km.2: Lk No. 169 Tychy-Orzesze Jaśkowice, Tychy állomás, 1-es vágány -0,246 km-től 0,549-ig. 0,795 km, LK No. 179 Tychy-Lędziny-Mysłowice A hossza 0,647 km-től 12.250-ig terjed. 11,603 km.3: Lk No. 179 Tychy-Lędziny-Mysłowice A hossza 12.250 és 14,560 km között van. 2,310 km, LK No. 885 Nowy Bieruń – KWK Piast – podg. Baraniec km 0.00 és 5,603 km hosszú. 5,603 km, LK No. 138 Oświęcim – Nowy Bieruń 0,525 km-től 4 484 km hosszúig. 3,959 km. (Hungarian)
    28 July 2022
    0 references
    Předmětem projektu je příprava předprojektové a projektové dokumentace nezbytné pro realizaci projektu „Revitalizace železničních tratí č. 140/169/179/885/138 připojení: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. Projektová dokumentace se bude týkat rozsahu prací, rozdělených do následujících oddílů: 1: Lk č. 140 Katowice Ligota-Nędza, Orzesze Jaśkowice stanice, trať č. 1 z km 21,349 do km 22,234 podle délky. 0,885 km, LK č. 169 Tychy-Orzesze Jaśkowice trať č. 1 z km 0,549 do km 17,484 podle délky. 16,935 km,2: Lk č. 169 Tychy-Orzesze Jaśkowice, Tychy stanice, trať č. 1 z km -0,246 do km 0,549 podle délky. 0,795 km, LK č. 179 Tychy-Lędziny-Mysłowice Náklady od km 0,647 do km 12,250 podle délky. 11,603 km,3: Lk č. 179 Tychy-Lędziny-Mysłowice Náklady od km 12,250 do km 14,560 podle délky. 2,310 km, LK č. 885 Nowy Bieruń – KWK Piast – podg. Baraniec od km 0,00 do km 5,603 podle délky. 5,603 km, LK č. 138 Oświęcim – Nowy Bieruń od 0,525 km do 4 484 km dlouhé. 3,959 km. (Czech)
    28 July 2022
    0 references
    Projekta priekšmets ir projekta “Dzelzceļa līniju Nr. 140/169/179/885/138 savienojuma revitalizācija” īstenošanai nepieciešamās priekšprojekta un projekta dokumentācijas sagatavošana: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. Projekta dokumentācija attieksies uz darba apjomu, kas sadalīts šādās sadaļās: 1: Lk Nr. 140 Katowice Ligota-Nędza, Orzesze Jaśkowice stacija, trase Nr. 1 no 21,349 km līdz 22,234 km garumā. 0,885 km, LK Nr. 169 Tychy-Orzesze Jaśkowice trase Nr. 1 no 0,549 km līdz 17 484 km garumā. 16 935 km.2: Lk Nr. 169 Tychy-Orzesze Jaśkowice, Tychy stacija, trase Nr. 1 no -0,246 km līdz 0,549 km garumā. 0,795 km, LK Nr. 179 Tychy-Lędziny-Mysłowice Izmaksas no 0,647 km līdz 12 250 km pēc garuma. 11,603 km.3: Lk Nr. 179 Tychy-Lędziny-Mysłowice Izmaksas no 12 250 km līdz 14,560 km garumā. 2,310 km, LK Nr. 885 Nowy Bieruń — KWK Piast — podg. Baraniec no 0,00 km līdz 5 603 km garumā. 5,603 km, LK Nr. 138 Oświęcim — Nowy Bieruń no 0,525 km līdz 4,484 km garumā. 3,959 km. (Latvian)
    28 July 2022
    0 references
    Is é ábhar an Tionscadail ullmhú na doiciméadachta réamhdheartha agus deartha is gá chun an tionscadal a chur chun feidhme “Línte iarnróid uimh. 140/169/179/885/138 nasc: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. Bainfidh doiciméadú an tionscadail le raon feidhme na hoibre, arna mhiondealú sna ranna seo a leanas: 1: LK Uimh. 140 Katowice Ligota-Nędza, stáisiún Orzesze Jaśkowice, rian Uimh. 1 ó km 21.349 go km 22.234 ar fhad. 0.885 km, LK Uimh. 169 Tychy-Orzesze Jaśkowice rian Uimh. 1 ó km 0.549 go km 17,484 ar fhad. 16.935 km.2: LK Uimh. 169 Tychy-Orzesze Jaśkowice, stáisiún Tychy, rian Uimh. 1 ó km -0.246 go km 0.549 ar fhad. 0.795 km, LK Uimh. 179 Tychy-Lędziny-Cost Mysłowice ó km 0.647 go km 12.250 ar fhad. 11.603 km.3: LK Uimh. 179 Tychy-Lędziny-Cost Mysłowice ó km 12.250 go km 14.560 ar fhad. 2.310 km, LK Uimh. 885 Anois Bieruń — KWK Piast — podg. Baraniec ó km 0.00 go km 5,603 ar fhad. 5.603 km, LK Uimh. 138 Oświęcim — Anois Bieruń ó 0.525 km go 4.484 km ar fad. 3.959 km. (Irish)
    28 July 2022
    0 references
    Predmet projekta je priprava predprojektne in projektne dokumentacije, potrebne za izvedbo projekta „Revitalizacija železniških prog št. 140/169/179/885/138: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. Projektna dokumentacija se bo nanašala na obseg dela, razdeljena na naslednje razdelke: 1: Lk No. 140 Katowice Ligota-Nędza, Postaja Orzesze Jaśkowice, proga št. 1 od km 21,349 do km 22,234 po dolžini. 0,885 km, LK št. 169 Tychy-Orzesze Jaśkowice št. 1 od km 0,549 do dolžine 17,484 km. 16,935 km.2: Lk No. 169 Tychy-Orzesze Jaśkowice, postaja Tychy, tir št. 1 od km -0,246 do km 0,549 po dolžini. 0,795 km, LK št. 179 Tychy-Lędziny-Mysłowice Stroški od km 0,647 do 12,250 km po dolžini. 11,603 km.3: LK št. 179 Tychy-Lędziny-Mysłowice Stroški od 12,250 km do 14,560 po dolžini. 2,310 km, LK št. 885 Nowy Bieruń – KWK Piast – podg. Baraniec od km 0,00 do km 5,603 po dolžini. 5,603 km, LK št. 138 Oświęcim – Nowy Bieruń od 0,525 km do 4,484 km. 3,959 km. (Slovenian)
    28 July 2022
    0 references
    Предмет на проекта е изготвянето на предварителна проектна и проектна документация, необходима за изпълнението на проект „Възраждане на железопътни линии № 140/169/179/885/138 връзка: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. Проектната документация ще се отнася до обхвата на работата, разбита в следните раздели: 1: LK № 140 Katowice Ligota-Nędza, гара Orzesze Jaśkowice, коловоз № 1 от km 21.349 до km 22.234 по дължина. 0,885 km, LK № 169 Tychy-Orzesze Jaśkowice № 1 от km 0,549 до km 17,484 по дължина. 16,935 км.2: LK № 169 Tychy-Orzesze Jaśkowice, гара Tychy, коловоз № 1 от km -0,246 до km 0,549 по дължина. 0,795 км, LK № 179 Tychy-Lędziny-Mysłowice Цена от km 0.647 до km 12.250 по дължина. 11 603 km.3: LK № 179 Tychy-Lędziny-Mysłowice Цена от km 12.250 до km 14.560 по дължина. 2,310 км, LK № 885 Nowy Bieruń — KWK Piast — podg. Бараниек от км 0.00 до км 5603 по дължина. 5603 км, LK № 138 Oświęcim — Nowy Bieruń от 0,525 km до 4,484 km дължина. 3 959 км. (Bulgarian)
    28 July 2022
    0 references
    Is-suġġett tal-Proġett huwa t-tħejjija tad-dokumentazzjoni ta’ qabel id-disinn u d-disinn meħtieġa għall-implimentazzjoni tal-proġett “Rivitalizzazzjoni tal-konnessjoni tal-linji ferrovjarji Nru 140/169/179/885/138: Orze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. Id-dokumentazzjoni tal-proġett se tikkonċerna l-ambitu tax-xogħol, maqsuma fit-taqsimiet li ġejjin: 1: LK Nru 140 Katowice Ligota-Nędza, stazzjon ta’ Orzesze Jaśkowice, binarju Nru 1 minn km 21.349 sa km 22.234 skont it-tul. 0.885 km, LK Nru 169 Tychy-Orzesze Jaśkowice Nru 1 minn km 0.549 sa km 17,484 skont it-tul. 16.935 km.2: Lk Nru 169 Tychy-Orzesze Jaśkowice, stazzjon Tychy, binarju Nru 1 minn km -0.246 sa km 0.549 skont it-tul. 0.795 km, LK Nru 179 Tychy-Lędziny-Mysłowice Spiża minn km 0.647 sa km 12.250 skont it-tul. 11.603 km.3: LK Nru 179 Tychy-Lędziny-Mysłowice Spiża minn km 12.250 sa km 14.560 skont it-tul. 2.310 km, LK Nru 885 Nowy Bieruń — KWK Piast — podg. Baraniec minn km 0.00 sa km 5,603 fit-tul. 5.603 km, LK Nru 138 Oświęcim — Nowy Bieruń minn 0.525 km sa 4.484 km twil. 3.959 km. (Maltese)
    28 July 2022
    0 references
    O projeto tem por objeto a preparação da documentação de pré-conceção e conceção necessária para a execução do projeto «Regeneração das linhas ferroviárias n.o 140/169/179/885/138 da ligação: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim (em inglês). A documentação do projeto abrangerá o âmbito dos trabalhos, repartidos pelas seguintes secções: 1: LK 140 Katowice Ligota-Nędza, estação de Orzesze Jaśkowice, via n.o 1, do km 21,349 ao km 22,234 l. 0,885 km, LK n.o 169 Tychy-Orzesze Jaśkowice, via n.o 1, do km 0,549 ao km 17,484 d. 16,935 km.2: LK 169 Tychy-Orzesze Jaśkowice, estação de Tychy, pista n.o 1 do km -0,246 ao km 0,549, de comprimento. 0,795 km, LK No 179 Tychy-Lędziny-Mysłowice Custo do km 0,647 ao km 12,250 l. 11,603 km.3: LK n.o 179 Tychy-Lędziny-Mysłowice Custo do km 12,250 ao km 14,560 2,310 km, LK n.o 885 Nowy Bieruń – KWK Piast – podg. Baraniec, do km 0,00 ao km 5,603 d. 5,603 km, LK n.o 138 Oświęcim – Nowy Bieruń, do km 0,525 ao 4,484 km de comprimento. 3 959 km. (Portuguese)
    28 July 2022
    0 references
    Projektets emne er udarbejdelse af den forhåndsudformnings- og designdokumentation, der er nødvendig for gennemførelsen af projektet "Revitalisering af jernbanestrækninger nr. 140/169/179/885/138: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. Projektdokumentationen vedrører arbejdets omfang opdelt i følgende afsnit: 1: Lk No. 140 Katowice Ligota-Nędza, Orzesze Jaśkowice station, spor nr. 1 fra km 21,349 til km 22,234 af længde. 0,885 km, LK No. 169 Tychy-Orzesze Jaśkowice spor Nr. 1 fra km 0,549 til km 17.484 efter længde. 16,935 km.2: Lk No. 169 Tychy-Orzesze Jaśkowice, Tychy station, spor nr. 1 fra km -0,246 til km 0,549 af længde. 0,795 km, LK No. 179 Tychy-Lędziny-Mysłowice Omkostninger fra km 0,647 til km 12.250 af længde. 11,603 km.3: Lk No. 179 Tychy-Lędziny-Mysłowice Omkostninger fra km 12,250 til km 14.560 efter længde. 2,310 km, LK No. 885 Nowy Bieruń — KWK Piast — podg. Baraniec fra km 0,00 til km 5.603 efter længde. 5,603 km, LK No. 138 Oświęcim — Nowy Bieruń fra 0,525 km til 4,484 km lang. 3,959 km. (Danish)
    28 July 2022
    0 references
    Obiectul proiectului este pregătirea documentației de pre-proiectare și proiectare necesare pentru implementarea proiectului „Revitalizarea liniilor de cale ferată nr. 140/169/179/885/138: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-Noul Bieruń-Oświęcim. Documentația proiectului va viza domeniul de aplicare al lucrării, defalcată în următoarele secțiuni: 1: LK nr. 140 Katowice Ligota-Nędza, stația Orzesze Jaśkowice, pista nr. 1 de la km 21,349 la km 22,234 după lungime. 0,885 km, LK nr. 169 Tychy-Orzesze Jaśkowice nr. 1 de la km 0,549 la km 17,484 după lungime. 16,935 km.2: LK nr. 169 Tychy-Orzesze Jaśkowice, stația Tychy, pista nr. 1 de la km -0,246 la km 0,549 după lungime. 0,795 km, LK No. 179 Tychy-Lędziny-Mysłowice Cost de la km 0,647 la km 12,250 în lungime. 11,603 km.3: LK nr. 179 Tychy-Lędziny-Mysłowice Cost de la km 12,250 la km 14.560 după lungime. 2,310 km, LK No. 885 Nowy Bieruń – KWK Piast – podg. Baraniec de la km 0.00 la km 5,603 după lungime. 5,673 km, LK nr. 138 Oświęcim – Nowy Bieruń de la 0,525 km la 4,484 km lungime. 3,959 km. (Romanian)
    28 July 2022
    0 references
    Projektets ämne är förberedelse av den fördesign- och konstruktionsdokumentation som krävs för genomförandet av projektet ”Revitalisering av järnvägslinjer nr 140/169/179/885/138: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. Projektdokumentationen kommer att omfatta arbetets omfattning, uppdelat i följande avsnitt: 1: Lk No. 140 Katowice Ligota-Nędza, Orzesze Jaśkowice station, spår nr 1 från km 21,49 till km 22,2334 av längd. 0,885 km, LK No. 169 Tychy-Orzesze Jaśkowice spår nr 1 från km 0,549 till km 17,484 av längd. 16,935 km.2: Lk nr 169 Tychy-Orzesze Jaśkowice, Tychy station, spår nr 1 från km -0,246 till km 0,549 av längd. 0,795 km, LK No. 179 Tychy-Lędziny-Mysłowice Kostnad från km 0,647 till km 12.250 av längd. 11,603 km.3: Lk nr 179 Tychy-Lędziny-Mysłowice Kostnad från km 12,250 till km 14.560 av längd. 2,310 km, LK No. 885 Nowy Bieruń – KWK Piast – podg. Baraniec från km 0,00 till km 5,603 av längd. 5,603 km, LK No. 138 Oświęcim – Nowy Bieruń från 0,525 km till 4,84 km lång. 3 959 km. (Swedish)
    28 July 2022
    0 references
    WOJ.: ŚLĄSKIE, POW.: Sosnowiec
    0 references
    13 December 2023
    0 references

    Identifiers

    RPSL.06.02.00-24-0346/19
    0 references