Thermal modernisation with a change in the method of heating the building of a building in Primary School No 2 in Piekary Śląskie (Q123875)

From EU Knowledge Graph
Revision as of 20:49, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation with a change in the method of heating the building of a building in Primary School No 2 in Piekary Śląskie
Project in Poland financed by DG Regio

    Statements

    0 references
    2,501,025.72 zloty
    0 references
    600,246.1728000001 Euro
    13 January 2020
    0 references
    3,456,672.76 zloty
    0 references
    829,601.4624 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 December 2015
    0 references
    31 December 2019
    0 references
    GMINA PIEKARY ŚLĄSKIE
    0 references
    0 references

    50°22'32.9"N, 18°56'16.4"E
    0 references
    Projekt "Termomodernizacja wraz ze zmianą sposobu ogrzewania budynku Miejskiej Szkoły Podstawowej nr 2 w Piekarach Śląskich" obejmuje prace termomodernizacyjne w Miejskiej Szkole Podst. nr 2 w PŚ. przy ul. Popiełuszki 8. Celem realizowanego projektu jest: Zwiększenie efektywności energetycznej w budynku użyteczności publicznej MSP nr 2. Zakres rzeczowy projektu obejmuje: - docieplenie ścian zewnętrznych metodą lekką, - dociepl. ścian stykających się z gruntem, - dociepl. stropodachu nad częścią dydaktyczną, - dociepl. stropodachu nad salą gimnastyczną z zapleczem i klatką schodową, - wymiana stolarki okiennej i drzwiowej,, - wykonanie nowej instalacji c.o., c.w.u. i elektrycznej (montaż opraw energooszczędnych), - fotowoltaika - koszt niekwalifikowany. Termin realizacji projektu 2015-2019 rok. Realizacja projektu przyczyni się do likwidacji „niskiej emisji” oraz kompleksowej modernizacji energetycznej (w tym budowa instalacji OZE) budynku MSP nr 2 w Piekarach Śląskich. (Polish)
    0 references
    The project “Thermomodernisation of the construction of the heating of the building of the Primary School Building No 2 in Piekary Śląskie” includes the thermal modernisation works at the 2 PŚ. ul. 8. The aim of the project is to: Increasing energy efficiency in SMEs’ public buildings No 2. The scope of the project includes: — the insulation of the external walls by the light method — to set up walls in contact with the ground, — to set up walls in contact with the ground, to set up a steep dress code over gymnastics with the hinterland and in the staircase, — replacement of window and door frames, — the installation of a new home and an electricity installation (installation of the low-energy fittings), — photovoltaics — ineligible cost. Project implementation deadline 2015-2019 year. The implementation of the project will contribute to the elimination of ‘low emission’ and comprehensive energy modernisation (including the construction of RES installations) of the SME building No 2 in Piekary Śląskie. (English)
    0 references

    Identifiers

    RPSL.04.03.01-24-04C2/17
    0 references