Comprehensive energy renovation of the buildings of the District of Bieszczadzki District — i.e. Main school education and educational establishments and high school school group in Lower Silesia (Q118694)

From EU Knowledge Graph
Revision as of 19:11, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Comprehensive energy renovation of the buildings of the District of Bieszczadzki District — i.e. Main school education and educational establishments and high school school group in Lower Silesia
Project in Poland financed by DG Regio

    Statements

    0 references
    1,505,836.66 zloty
    0 references
    361,400.79839999997 Euro
    13 January 2020
    0 references
    1,934,419.44 zloty
    0 references
    464,260.66559999995 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 December 2015
    0 references
    31 December 2017
    0 references
    POWIAT BIESZCZADZKI
    0 references
    Cel główny: Poprawa stanu środowiska naturalnego w Powiecie Bieszczadzkim na skutek zmniejszenia emisji zanieczyszczeń do atmosfery oraz wzrost efektywności energetycznej obiektów użyteczności publicznej poprzez termomodernizację budynków wraz z poprawą sprawności układu grzewczego i modernizacją instalacji oświetlenia.Cele szczegółowe:- poprawa stanu lokalnego środowiska naturalnego, zmniejszenie emisji pyłów i CO2,- wdrażanie idei zrównoważonego rozwoju,- obniżenie kosztów energii na skutek zwiększenia efektywności energetycznej obiektów,- zapewnienie odpowiedniego komfortu cieplnego w każdym z budynków.Realizacja celu projektu pozwoli na osiągnięcie niżej opisanych wskaźników produktów i rezultatów. Analizowana inwestycja obejmuje termomodernizację dwóch obiektów w Powiecie Bieszczadzkim: budynek sali gimnastycznej Zespołu Szkół Licealnych w Ustrzykach Dolnych wraz z instalacją oświetlenia oraz budynek Zespołu Placówek Szkolno – Wychowawczych w Ustrzykach Dolnych wraz z instalacja oświetlenia oraz budową instalacji fotowoltaiki z produkcją energii elektrycznej na własne potrzeby obiektu. Moc instalacji fotowoltaiki wynosi 25 kW.Całość prac ma na celu adaptację istniejących budynków do standardu energooszczędności zgodnego z warunkami technicznymi jakimi powinny odpowiadać budynki oraz ich usytuowanie. Realizacja inwestycji pozwoli na uzyskanie:1.Budynek BZPSW: zmniejszenie obliczeniowego zapotrzebowania na energię 45,33%, wskaźnik EP = 157,79 kWh/m2/rok2. Budynek sali gimnastycznej przy ZSL: zmniejszenie obliczeniowego zapotrzebowania na energię 55,40%, wskaźnik EP = 147,77 kWh/m2/rok. (Polish)
    0 references
    Goal: Improving the state of the environment by reducing emissions of pollutants into the atmosphere and increasing the energy efficiency of public utilities by means of thermo-modernisation of buildings with improvement of the efficiency of the heating system and modernisation of lighting nies.Specific objectives: — improvement of the local environment, reduction of dust and CO2 emissions, — implementation of the concept of sustainable development, — reduction of energy costs due to increased energy efficiency of the plants, — provision of adequate thermal comfort in each building. the project objective will allow the following indicators of outputs and results to be achieved. The investment analysed involves the thermal modernisation of two plants on the Pole: a building in the gym building of the Lower Secondary School Complex with the installation of lighting and the installation of a panel of educational and educational establishments in the Lower House, together with the installation of lighting and the installation of photovoltaic installations with the production of electricity for own use. The capacity of the installation of photovoltaics is 25 kW.[...] for the adaptation of existing buildings to the standard of energy efficiency that is consistent with the technical conditions to be met by the buildings and their location. The implementation of the investment will allow uzyskanie:1.Budynek the BEPSS: reduction in calculated energy demand 45.33 %, indicator EP = 157.79 kWh/m²/rok2. Uniwersytet gymnastics (gymnastics) building at ZSL: decrease in calculated energy demand 55.40 %, indicator EP = 147.77 kWh/m²/year. (English)
    0 references

    Identifiers

    RPPK.03.02.00-18-0064/16
    0 references