Reconstruction of the Urban amphitheatre and revalorisation of the Boleława Chrobrego Park in Bank (Q115719)

From EU Knowledge Graph
Revision as of 18:12, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction of the Urban amphitheatre and revalorisation of the Boleława Chrobrego Park in Bank
Project in Poland financed by DG Regio

    Statements

    0 references
    4,472,925.6 zloty
    0 references
    1,073,502.1439999999 Euro
    13 January 2020
    0 references
    9,685,328.64 zloty
    0 references
    2,324,478.8736 Euro
    13 January 2020
    0 references
    54.23 percent
    0 references
    21 March 2018
    0 references
    14 December 2018
    0 references
    GMINA BRZEG
    0 references
    0 references

    50°51'32.0"N, 17°27'50.8"E
    0 references
    Przedmiotowy projekt pn. Przebudowa amfiteatru miejskiego wraz z rewaloryzacją parku im. Bolesława Chrobrego w Brzegu znajduje się na liście projektów podstawowych pozytywnie zweryfikowanego przez IŻ RPO WO 2014-2020 Lokalnego Programu Rewitalizacji dla Gminy Brzeg na lata 2016-2023 przyjętego Uchwałą Nr XXVI/287/16 Rady Miejskiej Brzegu z dnia 10 listopada 2016 r. Projekt ujęty został na liście projektów podstawowych w rozdziale 6.1 LPR na str. 49 (kod projektu: PP1). Cały Projekt dotyczy obszaru wpisanego do rejestru zabytków województwa opolskiego pod nr Ks.A t.I – 243/90. Amfiteatr oraz Park im. B. Chrobrego są objęte ochroną konserwatorską w ramach układu urbanistycznego pod nr 132/54. Działki, na których budowane będą przyłącza, są objęte ochroną konserwatorska w ramach ochrony układu urbanistycznego. Projekt będzie realizowany w partnerstwie. Liderem projektu jest Gmina Brzeg. Partnerami w projekcie będą następujące podmioty: Liga Ochrony Przyrody Zarząd Oddziału w Brzegu, Biuro Urządzenia Lasu i Geodezji Leśnej Oddział w Brzegu, Państwowa Szkoła Muzyczna I stopnia im. Józefa Elsnera w Brzegu oraz Gminna Biblioteka Publiczna w Skarbimierzu. Przedmiotem projektu jest: przebudowa amfiteatru, rewaloryzacja parku, nadzór inwestorski i archeologiczny oraz promocja projektu. Wskaźniki produktu: - Powierzchnia obszarów objętych rewitalizacją - 5,16ha; - Otwarta przestrzeń utworzona lub rekultywowana na obszarach miejskich - 43533 m2; - Budynki publiczne lub komercyjne wybudowane lub wyremontowane na obszarach miejskich - 8105 m2.; - Liczba obiektów dostosowanych do potrzeb osób z niepełnosprawnościami - 1 szt.; - Liczba wspartych obiektów infrastruktury zlokalizowanych na rewitalizowanych obszarach - 2 szt.; - Ludność mieszkająca na obszarach objętych zintegrowanymi strategiami rozwoju obszarów miejskich - 10 354 osoby; - Liczba projektów, w których sfinansowano koszty racjonalnych usprawnień dla osób z niepełnosprawnościami - 1 szt. (Polish)
    0 references
    The project in question The reconstruction of the urban amphitheatre, together with the upgrading of the Boleława Chrobrte Park in the Bank, is on the list of basic projects positively verified by the MA ROP 2014-2020 of the Local Revitality Programme for the municipality of Brzeg for the period 2016-2023 adopted by Resolution No XXVI/287/16 of the Municipal Council of the Bank of 10 November 2016. the project has been included in the list of basic projects in chapter 6.1 of the LPR on page. 49 (project code: PP1). The entire project concerns the area entered in the Register of Historical Monuments in Opolskie under number Ks.A, i.e. 243/90. Amphitheatre and Park B. Chrobrego are covered by the conservation protection under the urban planning under No 132/54. The plots on which connections are to be constructed are protected under the protection of urban design. The project will be implemented in partnership. The project leader is the municipality of Brzeg. The project partners will be the following: The Division for the Conservation of Nature of the Branch Office of the Branch Office of the Branch of the Branch in the Bank, the Office of the Lau and Geodesy of Leśna Branch in the Bank, the Józef Elsner State School of Music and the Ministry of Public Library, and the Public Library Public Library in the Treasury. The project involves: refurbishment of an amphitheatre, revalorisation of the park, investor and archaeological supervision and project promotion. Product indicators: Area of regeneration areas — 5.16 ha; — An open space created or reclaimed in an urban area — 43 533 m²; — Public or commercial buildings built or renovated in urban areas — 8 105 m²; — Number of facilities adapted to the needs of persons with disabilities — 1; — Number of infrastructure facilities supported in regenerated areas — 2; — Population living in areas with an integrated urban development strategy — 10 354 persons; — Number of projects that financed reasonable accommodation costs for persons with disabilities — 1 (English)
    0 references

    Identifiers

    RPOP.10.02.00-16-0016/17
    0 references