Project in Poland financed by DG Regio
Language Label Description Also known as
English
The deep renovation of the building of the National School of Primary School in Barciice
Project in Poland financed by DG Regio

    Statements

    0 references
    520,341.47 zloty
    0 references
    124,881.95279999998 Euro
    13 January 2020
    0 references
    1,012,570.77 zloty
    0 references
    243,016.9848 Euro
    13 January 2020
    0 references
    60.0 percent
    0 references
    1 April 2016
    0 references
    30 September 2018
    0 references
    GMINA STARY SĄCZ
    0 references
    Projekt pn."Głęboka modernizacja energetyczna budynku Zespołu Szkół Szkoły Podstawowej i Gimnazjum w Barcicach" polega na termomodernizacji szkoły oraz modernizacji kotłowni. Planowane zadania w ramach projektu: Zadanie 1 Modernizacja energetyczna budynku Zepołu Szkół Szkoły Podstawowej i Gimnazjum w Barcicach 1.1 Przygotowanie analizy finansowo - ekonomicznej 1.2 Opracowanie projektu budowlanego wraz z audytem energetycznym 1.3 Termomodernizacja budynku 1.4 Remont kotłowni wraz z wymianą źródła ciepła 1.5 Inspektor nadzoru 1.6 Promocja projektu 1.7 Roboty niezwiązane ze zwiększeniem efektywności energetycznej budynku Planowany zakres prac inwestycyjnych obejmuje: - docieplenia (hydro i termo – izolacji) ścian zewnętrznych powyżej i poniżej poziomu terenu - wykonanie wyprawy zewnętrznej ścian - docieplenia stropu nad ostatnią kondygnacją - docieplenia kominów - wymiana pozostałych okien i drzwi w budynku oraz luksferów - remont kotłowni (w tym m.in. montaż kaskady kotłów o mocy znamionowej 276 kW -dwa kotły po 138 kW każdy) Dodatkowo zaznacza się, iz w ramach projektu: 1. Wartość poprawy efektywności energetycznej jaka zostanie osiągnięta na poziomie projektu w stosunku do stanu sprzed realizacji projektu zgodnie z audytami energetycznymi wynosi 61 %. 2. W projekcie zastosowano urządzenia służące do rozliczenia ciepła (liczniki ciepła, ciepłej wody) oraz chłodu zgodnie z załączonymi audytami energetycznymi. 3. W projekcie zastosowane zostały urządzenia utrzymujące zadaną temperaturę poprzez aktywne działanie (termostaty) i regulatory różnicy ciśnień (zawory podpionowe). zgodnie z załączonymi audytami energetycznymi. 4. Wartość redukcji emisji CO2 jaka zostanie osiągnięta w projekcie w stosunku do stanu sprzed realizacji projektu wynosi 56 % zgodnie z audytami energetycznymi. 5. Wartość obniżenia emisji pyłów (PM 10 i PM 2,5) zgodnie z audytami energetycznymi wynosi odpowiednio 3 % oraz 3 %. (Polish)
    0 references
    The project entitled ‘Deep energy renovation of the Team of the Schools of Primary School and Gimnatum in Barciice’ consists of the thermal modernisation of the school and the modernisation of the boiler room. Planned tasks under the project: Activity 1 The Energy Modernisation of the School for the School of Primary School and the Gimpozjon Barcice 1.1 Preparation of a financial analysis — Economic study 1.2 Development of a construction project with 1.3 Thermal Modernisation of the Building 1.4 Remont boiler Room with the replacement of the heat source 1.5 Assistant Supervisor of Supervision 1.6 Promote project 1.7 Works not related to the improvement of the energy efficiency of the building, the planned range of investment works shall include: — insulation (hydro and termo — insulation) of external walls above and below ground — performance of the outside wall — insulation of the floor over the last floor — insulation of the stack — replacement of other windows and doors in the building and luksfer — renovation of the boiler house (including, inter alia, installation of a boiler cascade with a rated power rating of 276 kW — two boilers at least 138 kW each) Additionally points to, the iz under the project will: 1. The energy efficiency improvement that will be achieved at project level compared to the pre-project status according to energy audits is 61 %. 2. The design uses heat billing equipment (heat meters, hot water) and cooling according to the attached energy audits. 3. Equipment that maintains the temperature has been used in the design through active operation (thermostats) and differential pressure regulators (vertical valves). 4. The CO2 emission reduction to be achieved in the project compared to the state prior to the project is 56 % according to the energy audits. 5. The reduction of particulate matter (PM 10 and PM 2,5) according to energy audits is 3 % and 3 % respectively. (English)
    0 references

    Identifiers

    RPMP.04.03.02-12-0328/16
    0 references