Modernisation of public buildings in the municipality of Ldress (Q112268)

From EU Knowledge Graph
Revision as of 17:37, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Modernisation of public buildings in the municipality of Ldress
Project in Poland financed by DG Regio

    Statements

    0 references
    510,719.02 zloty
    0 references
    122,572.5648 Euro
    13 January 2020
    0 references
    1,126,420.82 zloty
    0 references
    270,340.9968 Euro
    13 January 2020
    0 references
    57.07 percent
    0 references
    2 May 2016
    0 references
    31 March 2018
    0 references
    GMINA LUBIEŃ
    0 references
    0 references
    W ramach projektu zaplanowano realizację dwóch zadań inwestycyjnych: 1. Kompleksowej modernizacji energetycznej budynku nr 34: - Ocieplenie stropu nad salą balową i biurem (W1) - Ocieplenie ścian zewnętrznych pokrytych blachą (W1) - Ocieplenie stropu nad skrzydłem SE i zapleczem Sali (W1) - Ocieplenie ścian zewnętrznych o gr.38cm (W1) - Modernizacja systemu ogrzewania - Modernizacja systemu oświetlenia - Ocieplenie stropu nad balkonem w pom.201 (W1) - Ocieplenie stropu nad pokojem 114 (W1) - Wymiana okien zewnętrznych U=2,6W/m2K (W1) - Wymiana drzwi zewnętrznych U=2,5W/m2K (W1) 2. Kompleksowej modernizacji energetycznej budynku nr 50: Modernizacja systemu oświetlenia (W2) Ocieplenie ścian zewnętrznych o gr. 25cm (W1) Ocieplenie stropu pod nieogrzewanym poddaszem (W1) Ocieplenie ścian zewnętrznych o gr.37cm (W1) Modernizacja systemu ogrzewania (W1) Wymiana okien zewnętrznych U=2,0W/m2K (W1) Budowa instalacji fotowoltaicznej Wymiana drzwi zewnętrznych (W1) Konieczność realizacji wyżej wymienionych przedsięwzięć wynika bezpośrednio z przeprowadzonych audytów energetycznych dla obu budynków objętych projektem. Projekt cechują następujące wskaźniki: 1. % wartość poprawy efektywności energetycznej: 62,7% 2. W projekcie zastosowano liczniki ciepła; 3. Audyt energetyczny budynku wskazuje na konieczność zastosowania zaworów termostatycznych i regulacyjnych; 4. % wartość redukcji emisji CO2: 57,4%; 5. % wartość obniżenia emisji pyłów (PM 10 i PM 2,5): 65,7%. (Polish)
    0 references
    Two investment tasks are planned under the project: 1. Comprehensive energy modernisation of Building No. 34: — the insulation of the ballast room and the office (W1) — the insulation of external walls covered by the sheet (W1) — the warming of the body wall with the SE and the Sali wall (W1) — the warming of the shell of the SE and the Sali wall (W38) — modernisation of the heating system — Modernisation of the lighting system — Modernisation of the lighting system — modernisation of the lighting system — warming up over the balloon in pom.201 (W1) — 1W/m2K insulation — replacement of external windows U = 2,6W/m114K (W1) — External door exchange U = 2,5W/m2K (W1) 2. Comprehensive energy modernisation of Building No. 50: Modernisation of the lighting system (W2) insulation of external walls by 25 cm (W1) insulation of the outer wall of cm (W1) insulation of outer walls by gr.r.37cm (W1) Modernisation of heating system (W1) Modernisation of heating system (W) Replacement heating system (W) Exchange of external windows U = 2,0W/m2K (W1) Construction of a photovoltaic installation replacement of external doors (W1) The need for the projects referred to above results directly from the energy audits carried out for both buildings covered by the project. The project is characterised by the following indicators: 1. % value of energy efficiency improvement: 62.7 % 2. Heat meters are used in the project; 3. The energy audit of the building points to the need to use thermostatic and regulatory valves; 4. % CO2 emissions reduction: 57.4 %; 5. % reduction of particulate matter (PM 10 and PM 2,5): 65.7 %. (English)