Reduction of air pollutant emissions in Żyrardów through the construction of ‘park and ride’ — stage II (Q109177)

From EU Knowledge Graph
Revision as of 17:15, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reduction of air pollutant emissions in Żyrardów through the construction of ‘park and ride’ — stage II
Project in Poland financed by DG Regio

    Statements

    0 references
    2,288,784.0 zloty
    0 references
    549,308.16 Euro
    13 January 2020
    0 references
    2,872,028.4 zloty
    0 references
    689,286.816 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    1 December 2017
    0 references
    20 December 2019
    0 references
    MIASTO ŻYRARDÓW
    0 references
    0 references

    52°3'19.8"N, 20°26'40.6"E
    0 references
    Przedmiotem projektu jest integracja komunikacji zbiorowej z komunikacją indywidualną poprzez budowę dwóch parkingów typu „Parkuj i Jedź” dla samochodów osobowych i rowerów w Żyrardowie. Cel główny: redukcja emisji zanieczyszczeń powietrza ze źródeł linowych poprzez wdrożenie rozwiązania z zakresu zmiany środków komunikacji indywidualnej na zbiorową lub niezmotoryzowaną. Cele pośrednie: wzrost ilości miejsc postojowych w centrum umożliwiających przesiadkę na inny środek transportu, wzrost ilości bezpiecznych miejsc postojowych dla rowerów, zapewnienie bezpieczeństwa środków transportu i miejsc przesiadkowych typu „Parkuj i Jedź”, poprawa jakości infrastruktury drogowej niezbędnej do zapewnienia dobrego dostępu do parkingów. Korzyści, które mogą się pojawić w wyniku realizacji projektu: ograniczenie zanieczyszczenia powietrza i całego środowiska substancjami będącymi efektem spalania paliw transportowych na terenie Żyrardowa oraz WOF, poprawa estetyki miasta dzięki ograniczeniu „dzikich” miejsc postojowych, poprawa warunków dla zdrowia lokalnych mieszkańców dzięki ograniczeniu niskiej emisji, wzrost atrakcyjności Żyrardowa jako miejsca zamieszkania i inwestowania. Lokalizacja projektu: ul. Kolejowa (Parking 1) i Pl. Piłsudskiego (Parking 2) w Żyrardowie. Projekt realizuje cele LPR Miasta Żyrardowa (Przedsięwzięcie nr 9 ujęte w LPR), parking przy Pl. Piłsudskiego położony jest na obszarze rewitalizacji. Zakres projektu obejmuje następujące zadania: 1. Dokumentacja techniczna oraz wykonanie robót budowlanych i instalacyjnych w formule zaprojektuj i wybuduj, w tym: Roboty brukarskie, Oświetlenie uliczne wraz z przyłączami, Ogrodzenie z bramami i furtkami, Monitoring, Wiaty dla rowerów, Odwodnienia, Jezdnia asfaltowa (wyłącznie poszerzenie celem umożliwienia dostępu do parkingu), Tablice-jednolite oznakowanie parkingów. 2. Zarządzanie procesem inwestycyjnym – nadzór inwestorski 3. Promocja projektu. Projekt realizowany będzie w formule zaprojektuj i wybuduj. (Polish)
    0 references
    The project aims to integrate individual communication with individual communications through the construction of two park-and-ride facilities for cars and bicycles at Żyrardów. Goal: reduction of the air pollutant emissions from the cableway installation by implementing a change in the means of individual communication on a collective or non-motorised basis. Intermediate targets: an increase in the number of parking places at the hub for connecting services to another mode of transport, an increase in the number of secure parking spaces for bicycles, security of transport and “park and ride” hubs, the improvement of the quality of the road infrastructure necessary to ensure good access to the car parks. Benefits that may arise from the project: reducing air pollution and the environment as a whole as a result of the burning of transport fuels in the Żyrardów and the WOF, improving the city’s aesthetics by reducing the ‘wild’ parking spaces, improving the health conditions for local residents by reducing the low emissions, increasing the attractiveness of the Žilina as a place of residence and investment. Location of the project: UL. Railway (Parking 1) and Pl. Piłsudskiego (Parking 2) in Żyrardów. The project meets the objectives of the LFP City Council (Project No 9 in the LPR), the car park at P1. Pilsudskiego is located in the area of regeneration. The scope of the project includes the following tasks: 1. Technical documentation and execution of construction and installation works in design and explosion-type, including: Paving, street work, street heart with connections, fence and gates, Monitoring, pickers for bicycles, drainage, bitumen (only enlargement in order to allow access to the car park), Tacclose the uniform marking of car parks. 2. Investment management — investor supervision 3. Project promotion. The project will be run in design and build. (English)
    0 references

    Identifiers

    RPMA.04.03.02-14-9228/17
    0 references