Comprehensive and deep thermal modernisation of the Bofa Building in m. Suchowola (Q105274)

From EU Knowledge Graph
Revision as of 13:03, 10 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Comprehensive and deep thermal modernisation of the Bofa Building in m. Suchowola
Project in Poland financed by DG Regio

    Statements

    0 references
    799,265.05 zloty
    0 references
    191,823.612 Euro
    13 January 2020
    0 references
    1,349,274.48 zloty
    0 references
    323,825.8752 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    8 January 2019
    0 references
    30 November 2021
    0 references
    GMINA WOHYŃ
    0 references
    0 references
    Głów. celem P.: Poprawa jakości środ. natur. na terenie Gminy Wohyń wpływająca na wzrost jakości życia społ. lokalnej oraz zwiększenie konkurencyjności obszaru. C. szczegół. są: 1.Zoptymalizowanie działań zwięk. efektywność energ. sektora publ., 2. Łagodzenie zmian klimatu poprzez ogran. emisji zanieczyszczeń do atmosfery, 3. Zwiększenie wykorzystania energii poch. z OZE. Grupa docel.: użytkownicy budynku ZSZ w Suchowoli (uczniowie i nauczyciele), pozostali mieszkańcy i podm. funkcjon. na terenie Gminy Wohyń. Pow. użytk. budynku ZSZ w Suchowoli 1441,96m2. Rezultatami proj. będą: Ilość zaoszczedz. energii cieplnej -1441,28GJ/rok; Ilość zaoszczędzonej energii elektr.-23,22MWh/rok, Zmniejszenie rocznego zużycia energii pierwotnej w bud. publ.(CI32) -699894,44kWh/rok; Szacowany roczny spadek emisji gazów ciepl.(CI34) - 227,83 t.r. CO2/rok; Prod. energii cieplnej z nowo wybud./nowych mocy wytwór. instalacji wykorzyst. OZE -212,71MWht/rok; Prod. energii elekt.z nowo wybud./nowych mocy wytwórczych instalacji wykorzyst. OZE-2,27MWhe/rok;Dodat. zdolność wyt. energii z OZE(CI30)-0,10232MW. Produkty: Liczba wybud. jednostek wytwarzania energii elektr. z OZE-1szt., Liczba wybud. jedn. wytwarzania energii cieplnej z OZE-1szt.; Liczba zmodern.energet.budynków-1szt.;Liczba budynk. dostosow.do potrzeb osób z niepełnospr.-1szt. Zakres obejm. wykonanie prac termomod.: *dociepl. stropu wewn., *ocieplenie ścian zew., *wymianę stolarki okienno-drzwiowej, *montaż kotła na biomasę o mocy 100kW, *montaż instalacji fotowolt.o mocy 2,32 kW, *wymiana instalacji co.; *moderniz. kotłowni, *montaż grzejn. stal.płytowych z zaworami i głowicami termostat.; *wykonanie robót towarzysz., *wym. oświetlenia na LED. Wydatki niekwalfik. - zakup schodolazu i dostos. łazienek dla potrzeb osób z niepełnospr. Zg. z audytem energ. efektywność energet. budynku wzrośnie o 61,44%; wybrano wariant inwest. dla OZE-kocioł na biomasę 100kW(s.30) i inst. fotowoltaiczna 2,32kW (s.38) Proj. zgodny z POP dla strefy lub. (Polish)
    0 references
    The main objectives of P.: Improving the quality of the local area and increasing the competitiveness of the local area and increasing the competitiveness of the area. The details of which are: 1.Optimisation of activities to increase energy efficiency in the public sector, 2. Mitigating climate change by atmospheric emissions, 3. Increasing the use of energy from renewable sources. Target group: users of the ZZ building in Suchowola (students and teachers), other inhabitants and substations in the municipality of Wolhyń. Area of operation of the SRZ in Suhowola 1 441.96 m². They will: Quantity in default heat 1441,28 GJ/year; Amount of electric energy saved — 23.22 MWh/year, Reduction of annual primary energy consumption in public pul. (CI32) -699 894.44 kWh/year; Estimated annual decrease in gas emissions (CI34) — 227,83 by T.R. CO2/rok; Production of heat from the new/new power plant. RES -212,71MWt/year; Production of electricity from new/new generation capacity of an installation. OF-2,27MWhe/year; additional Energy Capacity from RES (CI30) -0.10232 MW. Products: Number of units generating electricity generation from EEE-1k. Number of modern energy refurbishment -1 buildings, Number of modernised buildings — persons with disabilities — 1 The scope of completion of the work. * ext., * insulation of the wall of the wall, * replacement of window/door frames, * installation of a biomass boiler with a power of 100 kW, * installation of a foam-tube installation with a power of 2.32 kW, * replacement of the installation as. * retrofitting for boiler rooms, * Assembly of steel radiators, with taps and thermostat heads.; * the execution of works., * out of LED lighting. Expenditure not in respect of the costs of expenditure for expenditure on expenditure not in respect of non-member countries. Purchase of the staircase and of the bathroom for the needs of disabled persons. The energy efficiency estimate of the building will increase by 61.44 %; the investment option was selected. for the OGE-boiler biomass 100 kW (p. 30) and a photovoltaic (PV) 2.32 kW (p. 38), the option is in line with the POP for the zone or. (English)
    0 references

    Identifiers

    RPLU.05.02.00-06-0023/19
    0 references