Integrated System of Transportation in Agglomeration and in Wrocław-Stage III A (Q86073)

From EU Knowledge Graph
Revision as of 19:29, 9 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Integrated System of Transportation in Agglomeration and in Wrocław-Stage III A
Project in Poland financed by DG Regio

    Statements

    0 references
    96,740,853.0 zloty
    0 references
    23,217,804.72 Euro
    13 January 2020
    0 references
    268,815,635.4 zloty
    0 references
    64,515,752.49599999 Euro
    13 January 2020
    0 references
    75.0 percent
    0 references
    4 September 2015
    0 references
    30 June 2023
    0 references
    GMINA WROCŁAW
    0 references
    0 references
    0 references

    51°7'34.7"N, 16°58'41.5"E
    0 references
    Budowa torowiska tramwajowego wraz z niezbędną przebudową kolizyjnego uzbrojenia. Przebudowa wiaduktu kolejowego na potrzeby trasy w ul. Długiej. Projekt wielobranżowy (branża drogowa, torowa, teletechniczna, elektryczna, wod-kan, mostowa itp..) (Polish)
    0 references
    Construction of a tramway track with the necessary collision construction.Reconstruction of the railway viaduct for the purpose of the route in ul.Long.Multi-screen design (road, track, telecommunications, electrical, water, bridge, etc.) (English)
    0 references

    Identifiers

    POIS.06.01.00-00-0026/16
    0 references