Increase in the energy efficiency of multi-family residential buildings under the ‘pone’ Housing Cooperative in Luan (Q84743)

From EU Knowledge Graph
Revision as of 19:03, 9 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Increase in the energy efficiency of multi-family residential buildings under the ‘pone’ Housing Cooperative in Luan
Project in Poland financed by DG Regio

    Statements

    0 references
    3,063,671.1 zloty
    0 references
    735,281.064 Euro
    13 January 2020
    0 references
    4,412,916.4 zloty
    0 references
    1,059,099.936 Euro
    13 January 2020
    0 references
    75.0 percent
    0 references
    1 August 2018
    0 references
    31 December 2020
    0 references
    SPÓŁDZIELNIA MIESZKANIOWA "POLNE" W LUBINIE
    0 references
    0 references
    0 references
    W ramach projektu będą wykonywane prace termomodernizacyjne w niżej wymienionych budynkach: Budynek położony przy ul. Topolowej 52 posiada 12 kondygnacji. W obiekcie znajduje się 55 lokali mieszkalnych, w których mieszka 110 osób. Budynek położony przy ul. Topolowej 24-42 posiada 5 kondygnacji. W obiekcie znajduje się 100 lokali mieszkalnych, w których mieszka 231 osób. Budynek położony przy ul. Leszczynowej 2-10 posiada 12 kondygnacji. W obiekcie znajduje się 159 lokali mieszkalnych, w których mieszka 327 osób. Przedmiotowy zakres projektu obejmuje: Prace termomodernizacyjne (koszt kwalifikowalny), Promocja projektu (koszt niekwalifikowalny). „W związku z tym przeprowadzony audyt wskazał, iż należy przeprowadzić prace polegające na: 1) Topolowa 52 - dociepleniu ścian zewnętrznych budynków; - dociepleniu ścian zewnętrznych klatki schodowej; - dociepleniu stropodachów; - dociepleniu przegród zewnętrznych w piwnicach - modernizacja co - modernizacja cwu Łączny koszt zgodnie z audytem : 661 040,00 zł 2) Topolowa 24-42 - dociepleniu ścian szczytowych; - dociepleniu ścian osłonowych - dociepleniu ścian zewnętrznych klatki schodowej; - dociepleniu ścian zewnętrznych ( wnęki balkonowe ) - dociepleniu przegród zewnętrznych w piwnicach - dociepleniu stropodachu - wymiana okien piwnicznych - modernizacja co - modernizacja cwu Łączny koszt zgodnie z audytem : 1378506,00 zł 3) Leszczy 2-10 - dociepleniu ścian szczytowych; - dociepleniu ścian osłonowych - dociepleniu ścian zewnętrznych klatki schodowej; - dociepleniu przegród w piwnicy - dociepleniu stropodachu - wymiana okien piwnicznych - wymiana okien klatek schodowych - modernizacja co - modernizacja cwu Łączny koszt zgodnie z audytem : 1971078,00 zł Łączny koszt robót : 4010624,00 zł. (Polish)
    0 references
    As part of the project, thermal modernisation works will be carried out in the following buildings:Building located at ul.Topov 52 has 12 storeys.The facility hosts 55 dwellings in which 110 people live.Building located at ul.The Tona 24-42 holds 5 floors.The facility hosts 100 dwellings in which 231 people live.Building located at ul.Leszno, 2-10 has 12 storeys.The facility hosts 159 dwellings in which 327 people live.The project scope covers:Thermo-modernisation works (eligible cost), project promoter (ineligible cost).“In this context, the audit indicated that work should be carried out in order to:(1) Topolowa 52 — heating of the external walls of the buildings;The insulation of the outer wall of the stairway;— the insulation of the costume;Insulation of the building envelope in the basement — upgrading of CWU — modernisation of CWU Total cost as audited:(PLN 661 040,00 PLN 2), Topolowa 24-42, the heating of the top walls;— the heating of the curtain wall — the insulation of the outer wall of the staircase;— insulation of the outer wall (cavity wall) — insulation of the building envelope in the cellars — insulation of the roof — replacement of the basement windows — replacement of the cellar windows — upgrade of the CWU Total cost as audited:PLN 1378506,00 (PLN 3), covering the wall of the peak walls, (PLN 2);— the heating of the curtain wall — the insulation of the outer wall of the staircase;— insulation of baffles in the basement — insulation of the basement — replacement of hot windows — replacement of window frames — upgrade of the CWU Total cost as audited:PLN 1971078,00 Total cost of works:PLN 4010624,00. (English)
    0 references

    Identifiers

    POIS.01.03.02-00-0034/17
    0 references