Development of a hybrid system of electrically ventilated façades with energy converter (Q78645)

From EU Knowledge Graph
Revision as of 15:41, 9 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Development of a hybrid system of electrically ventilated façades with energy converter
Project in Poland financed by DG Regio

    Statements

    0 references
    16,255,647.5 zloty
    0 references
    3,901,355.4 Euro
    13 January 2020
    0 references
    27,753,650.0 zloty
    0 references
    6,660,876.0 Euro
    13 January 2020
    0 references
    58.57 percent
    0 references
    1 October 2019
    0 references
    31 July 2022
    0 references
    "CLIMATIC" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ SPÓŁKA KOMANDYTOWA
    0 references
    0 references

    50°57'0.7"N, 21°24'41.4"E
    0 references
    Realizacja projektu ma na celu opracowanie innowacyjnego gotowego do komercjalizacji, hybrydowego systemu elewacji wentylowanych z przetwornikiem energii. System ten oparty będzie o zaprojektowane przegrody budowlane na bazie elementów konstrukcyjnych będących przedmiotem prac B+R (zwanych dalej ”IZOSTAL”). Opracowane rozwiązanie będzie miało istotny charakter w budownictwie modułowym oraz tradycyjnym, zmniejszając energochłonność budynku przy jednoczesnym zapewnieniu wysokiego komfortu cieplnego, komfortu akustycznego bezpieczeństwa p-poż. Projekt jest z trendem budownictwa energooszczędnego i odpowiada na zapotrzebowanie rynkowe i popyt ze strony deweloperów, inwestorów indywidualnych, jednostek publicznych i spółdzielni mieszkaniowych realizujących budownictwo jedno- i wielorodzinne, obiekty usługowe i obiekty użyteczności publicznej Cel zostanie osiągnięty poprzez realizację badań przemysłowych i eksperymentalnych prac rozwojowych, w ramach których opracowana będzie optymalna konstrukcja elewacji wentylowanej z przetwornikiem energii obejmująca IZOSTAL, optymaliuzujaca wszystkie wymagane parametry techniczne. Skonstruowany system zostanie przebadany laboratoryjnie oraz w stanie rzeczywistym. W ramach prac nastąpi opracowanie składu, kształtu materiału izolacyjnego, stworzenie prototypów słupka i belki konstrukcyjnej, systemu elewacji, wybór najkorzystniejszej struktury kompozytu, opracowanie technologii budowy elewacji wentylowanych z przetwornikiem energii. Przeprowadzona zostanie ocena stanu technicznego prototypowego budynku oraz przeprowadzenie ewentualnych działań korygujących na podstawie uzyskanych wyników i pomiarów. Najważniejszym rezultatem który Wnioskodawca planuje osiągnąć jest opracowanie i przygotowanie do wdrożenia w działalności gospodarczej Wnioskodawcy oraz zaoferowanie na rynku no (Polish)
    0 references
    The purpose of the project is to develop an innovative, ready to commercialise, hybrid power ventilation system.This system will be based on the design of building structures based on structural elements which are the subject of the R & D work (hereinafter referred to as & core; IZOSTAL & core;).The solution developed will be important in the modular and conventional construction, reducing the energy intensity of the building while ensuring a high thermal comfort comfort, and a high comfort comfort.The project is driven by an energy-efficient building and is responsible for market demand and demand by developers, retail investors, public entities and housing co-operatives carrying out single and multi-family construction, service facilities and utilities. the objective will be achieved through the implementation of industrial research and experimental development which will develop optimum design of the façade with an energy converter comprising IZOSTAL, optimise all technical parameters required.The design of the system will be laboratory and real.The work will include the formulation of the composition, the shape of the insulating material, the creation of the prototype pillar and the building beam, the façade system, the choice of the most advantageous structure of the composite structure, the development of technology for the construction of the façade of ventilated energy products.An assessment of the technical condition of the prototype building will be carried out and any corrective actions taken on the basis of the results obtained and the measurements taken.The main deliverable which the applicant is planning to achieve is to develop and prepare for implementation in the economic activities of the applicant and to offer them on the market. (English)
    0 references

    Identifiers

    POIR.01.01.01-00-1188/18
    0 references